Permit Information
Permit NumberBLD19-00895
StatusFinaled
Name ENERGY ENTERPRISES LLC
Site Address 2802 W PLEASANTON AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
Finishing work for expired Permit BLD17-00559. The original Permit received and Passed a footing and foundation inspection (10/18/17) and a partial wall bracing (4/20/18). Permit to add two story addition to existing single level home. New addition to have 968 square feet on the Main Floor and 968 square feet on the Upper Floor (1936 square feet addition). Adding Dining room, Living room Kitchen, Mechanical/Storage Room, Powder and Laundry Closet downstairs and (3) Bedrooms, (2) Baths upstairs. Prescriptive or better Energy Code is proposed. Ductless heating system is being proposed. Foundation is being constructed of Logix 12" (8" conc.) ICF. All work to be done according to Logix specifications and local codes. Separate electrical, mechanical, plumbing and erosion permits are required. The existing Kitchen must be removed (no ADU or Duplex is permited with this permit). The two structures must be connected with access from one to the other. No other work to the existing home is proposed. All work to be done according to plans, notes, review notes and local codes. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  5/13/2020 DONE
BLD-Final5/8/20205/11/20205/11/2020APASS
DetailsDave Hannah
Dan Phone #: ###-####
DOC - Permit Finaled5/11/20205/10/20205/11/2020PPASS
DetailsDave Hannah
Change Expiration Date Only  4/13/2020 DONE
DetailsJason Blais
A 180 day extension from 4/14/20 is approved. This is the first extension for an issued permit.
BLD-Final4/1/20204/1/20204/1/2020PNR
DetailsDave Hannah
Dan Phone #: ###-####
Routing - MECHANICAL8/22/2019 8/22/2019 PASS
DetailsTroy James
Resubmitted manual j report
OVERRIDE  4/15/2019  
Plan assigned to (BJM)3/27/20193/27/20194/15/2019 DONE
DetailsBrian McGowan
2nd Review Complete - SFD - Finish an expired permit (BLD17-00559)
Routing - PLAN CHECK4/15/2019 4/15/2019 PASS
DetailsBrian McGowan
Case Summary (BLD)  4/15/2019 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  4/15/2019 DONE
DetailsBrian McGowan
Permit Ready to Issue  4/15/2019 DONE
Inspection Record Card- Bld  4/15/2019 DONE
Telephone call  4/15/2019 DONE
Called GC and let them know the permit is ready to be picked up.
Issue PAID IN FULL permit  4/15/2019 DONE
per Brian no energy fee
Routing - PLAN CHECK4/11/2019 4/11/2019 FAIL
DetailsBrian McGowan
No exterior elevations, upper floor truss layout or detailed/noted wall section was provided.
Routing - MECHANICAL4/9/2019 4/9/2019 PASS
DetailsTroy James
Manual j report
Routing - MECHANICAL4/5/2019 4/8/2019 FAIL
DetailsTroy James
Left message with applicant. Need to know how the additon is being heated.
Routing - Addressing4/8/2019 4/8/2019 PASS
DetailsLaura Hunter
Routing - PLANNING4/3/2019 4/4/2019 PASS
DetailsColleen T Carroll
Routing - PUBLIC WORKS3/27/2019 4/4/2019 PASS
DetailsMorgan Webb
Routing Walk-In (BLD)3/29/20193/29/20193/29/2019PFAIL
DetailsJosh Bogle
chatted about resubmittal docs - left for Brian's review
Plan resubmittals received  3/29/2019 DONE
two copies of plan sheets 1-10. taken to brian
1st review completed  3/28/2019 FAIL
DetailsBrian McGowan
Routing - PLAN CHECK  3/28/2019 FAIL
DetailsBrian McGowan
Needs to resubmit as if a new Permit based on City Policy and the Code change.
Routing Walk-In (Zoning)3/21/20193/21/20193/21/2019APASS
DetailsColleen T Carroll
Routing Walk-In (BLD)3/21/20193/21/20193/21/2019APASS
DetailsBrian McGowan
Took in plans for a full review.
BLD-Conference3/10/20203/12/2020 A 
DetailsDave Hannah
Dan Phone #: ###-####
Application received 3/21/2019