BLD-Final | 4/17/2019 | 4/18/2019 | 4/18/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Max Loranger
|
DOC - Permit Finaled | 4/18/2019 | 4/18/2019 | 4/18/2019 | P | PASS |
Dave Hannah
|
|
|
|
Permit Ready to Issue | | | 4/17/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/17/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/17/2019 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 3/26/2019 | 3/26/2019 | 4/16/2019 | | PASS |
Josh Bogle
|
|
|
4/1 egress, ePlan - 1st done
|
Routing - PLAN CHECK | 4/16/2019 | | 4/16/2019 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/16/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Routing Walk-In (Zoning) | 4/9/2019 | 4/9/2019 | 4/9/2019 | A | PASS |
Sue Cummings
|
|
|
|
Routing - PLAN CHECK | 3/26/2019 | | 3/29/2019 | | FAIL |
Josh Bogle
|
|
|
no header or well info
|
1st review completed | | | 3/29/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLANNING | 3/26/2019 | | 3/27/2019 | | FAIL |
Sue Cummings
|
|
|
Site plan needs to show distance from property line to new window
|
Intake Approval | | | 3/26/2019 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/26/2019 | | DONE |
|
|
|
|
Intake Approval | | | 3/22/2019 | | FAIL |
|
|
|
2nd prescreen 3-22-19 Please provide a full floor plan being affected by the remodel, please rotate your egress plan so that it is legible (still has to be rotated on our end to review) and site plan still needs to show the distance from the window well to the property line. thank you.
|
Application received | | | 3/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 21 2019 2:11PM
|
Intake Approval | | | 3/21/2019 | | FAIL |
|
|
|
Please provide a full floor plan that is being affected by the remodel, please provide a full site plan, please upload drawings into the drawing folder and please upload them so they are legible (right now the one in there has to be rotated).
|