Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-00905
StatusIssued
Name MARK GUHO CONSTRUCTION COMPANY
Site Address 245 S CAPITOL BLVD
Project NameGrove Hotel 4th Floor Terrace
Customer Number 
ePlanReviewYes
Description
(GROVE HOTEL - TERRACE REMODEL - 4TH FLOOR) Permit to remodel the existing 5,000 sq ft fourth floor outdoor terrace. Work to include: replacing existing light fixtures with new lighting; shade canopies over terrace; shade devices over guestroom windows; new fixed bench seating; additional planters; four new fire pits. The fourth floor terrace is a post-tensioned concrete slab; per structural notes, slab is to be scanned prior to cutting/drilling to ensure that no PT tendons are damaged during construction. Special inspections required per the attached Form 310. This building is fully fire sprinklered for high rise and occupancy. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. A certificate of completion is to be issued at the completion of the project. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/28/20198/30/20198/30/2019PCANC
DetailsTony Young
Nate Phone #: ###-####
FIRE-Final Inspection8/28/20198/28/20198/28/2019PCANC
DetailsJim Page
Fire alarm permit for fire alarm modifications in the same area has not been finaled, FIR17-00186. Scope of work needs to be completed for the FIR permit before life fire safety can be completed for the recent modifications. Informed point of contact about fire alarm issue as well. JCI, formally SimplexGrinnell has been notified about the issue as well, this request is cancelled.

nATE Phone #: ###-####
Issue PAID IN FULL permit  4/26/2019 DONE
Inspection Record Card- Bld  4/26/2019 DONE
Plan assigned to (JAR)3/28/20193/28/20194/24/2019 DONE
DetailsJulie Romig
04/26 - 3rd Rev - 1st Rev Comp - L2 Grove Terrace update ePlan
Routing - PLAN CHECK4/23/2019 4/24/2019 PASS
DetailsJulie Romig
Routing Off Site - STRUCTURAL4/23/2019 4/24/2019 PASS
DetailsJulie Romig
AHJ
PLANS/APPL TAKEN TO FRONT DESK  4/24/2019 DONE
Permit Ready to Issue  4/24/2019 DONE
MET-NEED (jake@mguho.com)
GC FORM
REVISED VALUE
Routing - PLAN CHECK4/11/2019 4/18/2019 PASS
DetailsJulie Romig
Routing Off Site - STRUCTURAL4/11/2019 4/16/2019 FAIL
DetailsJulie Romig
AHJ
Route to Impact Fee Review4/8/20194/11/20194/9/2019 PASS
DetailsKarina Myles
Review requested for Commercial Permit
1st review completed  4/8/2019 FAIL
DetailsJulie Romig
Routing - PLAN CHECK3/28/2019 4/8/2019 FAIL
DetailsJulie Romig
Routing Off Site - STRUCTURAL3/28/2019 4/3/2019 FAIL
DetailsJulie Romig
ahj
Routing - Design Review3/28/2019 3/28/2019 PASS
DetailsKatelyn Menuge
Redlined Lighting Requirements
Intake Approval  3/26/2019 PASS
DetailsJavier Guzman
Intake Approval  3/25/2019 FAIL
DetailsBrian McGowan
3-25-19
Please provide the following information before your Prescreen can be approved;
1. A completed Form 310 for Special Inspections.
Thank you
Intake Approval  3/22/2019 FAIL
DetailsBrian McGowan
A completed 518 checklist must be submitted prior to beginning the Prescreen process.
Application received  3/21/2019 DONE
Application submitted via PDS Online on Mar 21 2019 3:43PM