Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-00911
StatusIssued
Name BOISE VALLEY CHRISTIAN COMMUNION IN
Site Address 1177 N ROOSEVELT ST
Project NameDiscovery Church
Customer Number 
ePlanReviewYes
Description
(DISCOVERY CHURCH – PLATFORM AND SEATING REMODEL WITHIN THE SANCTUARY) The fire sprinkler system is used for fire area and for code trade-offs. To remodel the existing 3,416 square foot sanctuary within an existing church building having a total 1st story floor area of about 7,662 square feet and a total basement area of about 7,667 square feet. The existing platform, sound booth, and a ceiling soffit above the former platform will be removed. Work is to include a new 26 inch high platform having a floor area of about 552 square feet and served by 2 stairways, a wheelchair lift to provide an accessible route for the disabled to and from the platform, a new 26 inch high sound booth having a floor area of about 115 square feet and served by one stairway being exempt from a vertical accessible route because it is an employee work area and its elevation is essential to the function of the space, wall infills, interior doors, and a ceiling repair. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. This is a scope of work permit only. It does not modify the existing Certificate of Occupancy. This permit shall not be finaled until the land parcels at the church building are combined and a new deed and parcel number assigned so that the church building is compliant with the building code. The church has committed to resolve this issue by December 4, 2019. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference7/30/20197/31/20197/31/2019PDONE
DetailsTroy Cobbley
The stage and the sound booth floors have both been filled with non-combustible insulation. They are ok for cover. We also spoke about the need for a fire alarm permit for the modifications.

as late as possible - fire conference // Matt Phone #: ###-####
BLD-Framing/Rough-in7/30/20197/31/20197/31/2019APASS
DetailsTell Riley
Matt Phone #: ###-####//framing ok per plans//electrical rough ok//insulate per plan change and have fire inspection prior to cover//
Plan Reviewer's activity  7/30/2019 DONE
A plan mod will soon be submitted to allow an approved method of dealing with concealed combustible spaces per NFPA 13 other than installing fire sprinklers within the space. Any approved method per NFPA 13 is acceptable. CJW
BLD-Framing/Rough-in7/26/20197/29/20197/29/2019ANR
DetailsTell Riley
robin Phone #: ###-####//talked with contact at Discovery//they still need fire sprinklers or alternate//need a plan change if alternate is requuested//not ready for inspection//
BLD-Framing/Rough-in7/17/20197/18/20197/18/2019ANR
DetailsTell Riley
Robin Phone #: ###-####//need verification on blocking at I joists//need fire sprinkler and alarm permits and inspections prior to any cover on project//call for re-inspection after fire inspection//
Issue PAID IN FULL permit  6/7/2019 DONE
Inspection Record Card- Bld  6/7/2019 DONE
Permit Ready to Issue  6/6/2019 DONE
MET RMEACHAM@DCBOISE.ORG
Need GC
Need Rev Val
Plan assigned to (CJW)3/28/20193/28/20196/5/2019 PASS
DetailsCarl Westfall
(1st done) 04/15/19 (L-3 - 15 days) (eplan - 5 sheets) Discovery Church (back to applicant)
Routing - PLAN CHECK6/4/2019 6/5/2019 PASS
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  6/5/2019 DONE
Plan resubmittals received  6/4/2019 DONE
Route to Impact Fee Review4/24/20194/27/20194/25/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Plan resubmittals requested  4/24/2019 DONE
Routing - FIRE3/28/20193/28/20194/23/2019 PASS
DetailsMark Scharfen
IFC Review 04.23.2019.pdf uploaded.
1st review completed  4/23/2019 DONE
Routing - PLAN CHECK3/28/2019 4/23/2019 FAIL
DetailsCarl Westfall
Routing - Addressing3/28/2019 3/29/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS3/28/2019 3/28/2019 PASS
DetailsMorgan Webb
Intake Approval  3/26/2019 PASS
Application received  3/22/2019 DONE
Application submitted via PDS Online on Mar 22 2019 9:38AM
Plan Reviewer's activity  3/22/2019 PASS
Plan intake review approved