BLD-Aging Inspection | 2/13/2020 | 2/13/2020 | 2/19/2020 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 2/12/2020 | 2/12/2020 | 2/19/2020 | | PASS |
Dave Hannah
|
|
|
|
Zoning Approval | 10/2/2019 | 10/2/2019 | 10/2/2019 | | PASS |
Katelyn Menuge
|
|
|
|
BLD-Final | 10/1/2019 | 10/1/2019 | 10/1/2019 | P | PASS |
Dave Hannah
|
|
|
Justin Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 8/6/2019 | | DONE |
|
|
|
plan mod
|
Inspection Record Card- Bld | | | 8/6/2019 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 7/25/2019 | 7/25/2019 | 8/2/2019 | | PASS |
Joe Bruce
|
|
|
08/13 plan mod - BoDo Vanilla Shell
|
Routing - PLAN CHECK | 7/30/2019 | | 8/2/2019 | | PASS |
Joe Bruce
|
|
|
|
Routing - MECHANICAL | 7/30/2019 | | 8/2/2019 | | PASS |
Troy James
|
|
|
Mechanical design has been removed from vanilla shell. See BLD19-01848 for mechanical design.
|
Permit Ready to Issue | | | 8/2/2019 | | DONE |
|
|
|
need rev cert of val for the plan mod-app says yes it will change the valuation
|
Route to Impact Fee Review | 7/25/2019 | 7/28/2019 | 7/26/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan Modification Accepted | | | 7/25/2019 | | DONE |
|
|
|
Plan mod- This plan modification is to remove all HVAC from the vanilla shell and modify the power distribution to include (3) 200A panels. New HVAC will be installed per permit BLD19-01848
|
FIRE-Final Inspection | 6/3/2019 | 6/4/2019 | 6/4/2019 | A | PASS |
Jim Page
|
|
|
Final inspection for area of work in vanilla TI complete, no occupancy allowed under this permit.
Justin Phone #: ###-####
|
BLD-Framing/Rough-in | 5/24/2019 | 5/24/2019 | 5/28/2019 | P | PASS |
Dave Hannah
|
|
|
Justin Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/23/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/23/2019 | | DONE |
|
|
|
|
Routing - FIRE | 3/29/2019 | 3/29/2019 | 4/22/2019 | | PASS |
Mark Scharfen
|
|
|
IFC Review 04.22.2019.pdf uploaded.
|
Plan assigned to (JHB) | 3/29/2019 | 3/29/2019 | 4/22/2019 | | PASS |
Joe Bruce
|
|
|
04/23 (L3) BODO Vanilla Shell, ePlan
|
Routing - PLAN CHECK | 3/29/2019 | | 4/22/2019 | | PASS |
Joe Bruce
|
|
|
|
1st review completed | | | 4/22/2019 | | DONE |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/22/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/22/2019 | | DONE |
|
|
|
MET-NEED
GC FORM
REVISED VALUE
ACHD (CHANGE OF USE)
|
Routing - MECHANICAL | 3/29/2019 | | 4/9/2019 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 3/29/2019 | | 4/4/2019 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLANNING | 3/29/2019 | | 4/2/2019 | | PASS |
Nicolette Womack
|
|
|
Design Review for Exterior Modifications
|
Routing - PUBLIC WORKS | 3/29/2019 | | 4/2/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Addressing | 3/29/2019 | | 4/1/2019 | | PASS |
Doug Chausow
|
|
|
New address: 344 S 8th St
|
Intake Approval | | | 3/27/2019 | | PASS |
|
|
|
|
Application received | | | 3/25/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 25 2019 10:08AM
|
Intake Approval | | | 3/25/2019 | | FAIL |
Michael Hanson
|
|
|
This permit has failed prescreen due to the following:
1. Missing #304 form completed, signed, and dated.
2. Missing site specific fire flow letter.
|