Permit Information
Permit NumberBLD19-00939
StatusFinaled
Name SLETTEN CONSTRUCTION
Site Address 816 W BANNOCK ST
Project NameGarro Bldg Restroom Remodel
Customer Number 
ePlanReviewYes
Description
(GARRO/CARROLLS BUILDING - RESTROOM REMODEL) **This building is sprinklered to allow 5th floor. Permit is to remodel the restrooms located on the basement and 5th floor. Work to include: demolition of wall/doors/toilet partitions, removal of plumbing fixtures/accessories, new walls, new doors, remodeled plumbing, mechanical, electrical, and new interior finish that meets IBC chapter 8 requirements. This is a scope of work permit only with a certificate of completion to be issued upon completion and approval of the project. This building is fully fire sprinklered; any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 as regulated by the fire department. **MDH**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 2/12/20202/13/2020 DONE
This permit finaled on the web by Dustin Keyes
Third Notice 1/4/20202/7/2020 DONE
mailed 2-10-20
Second Notice 12/6/201912/30/2019 DONE
mailed 1-1-20
First Notice11/14/201911/14/201911/26/2019 DONE
DetailsDave Hannah
mailed 12-2-19
BLD-Aging Inspection11/14/201911/14/201911/14/2019 PASS
DetailsDave Hannah
DOC - Permit Finaled11/14/201911/14/201911/14/2019PPASS
DetailsDave Hannah
BLD-Final7/2/20197/3/20197/3/2019APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Dustin Keyes
FIRE-Final Inspection7/2/20197/2/20197/2/2019PPASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.

Phone #: ###-#### Inspection requested via web by Dustin Keyes
Issue PAID IN FULL permit  4/15/2019 DONE
Inspection Record Card- Bld  4/15/2019 DONE
Plan assigned to (M_H)3/28/2019 4/9/2019 DONE
DetailsMichael Hanson
04/09 #518 L2 ePlan - Restroom Mod: Floors B&5
Routing - PLAN CHECK3/28/2019 4/9/2019 PASS
DetailsMichael Hanson
1st review completed  4/9/2019 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  4/9/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  4/9/2019 DONE
All Met (dkeyes@sletteninc.com)
Need GC
Need Rev Val
Routing - PLUMBING3/28/2019 4/1/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - MECHANICAL3/28/2019 3/29/2019 PASS
DetailsTroy James
Routing - Addressing3/28/2019 3/28/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS3/28/2019 3/28/2019 PASS
DetailsMorgan Webb
Intake Approval  3/27/2019 PASS
DetailsJavier Guzman
Intake Approval  3/26/2019 FAIL
DetailsJavier Guzman
Provide and upload the following:
• Reserve the bottom right corner for City electronic stamps. Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block on plan sheet G101 and A503
Application received  3/25/2019 DONE
Application submitted via PDS Online on Mar 25 2019 10:10AM