Permit Information
Permit NumberBLD19-00947
StatusFinaled
Name RENEW COMMERCIAL CONSTRUCTION
Site Address 1451 N MILWAUKEE ST
Project NameNational Guard T.I.
Customer NumberDEMO BLD19-00028
ePlanReviewYes
Description
(NATIONAL GUARD) **PLAN MOD TO REMOVE DISHWASHER FROM PROJECT** Permit to remodel an existing 1710 sq.ft. vanilla space created under BLD19-00028. Approval contingent upon adhering to the approved plans on file. Work to include: construction of interior non-bearing walls to enlarge existing bathroom and installation of millwork and sink to create a breakroom area. New plumbing fixtures and electrical work. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **MDH**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 5/10/20195/2/2019 DONE
This permit finaled on the web by Randy Young
BLD-Final4/29/20194/30/20194/30/2019APASS
DetailsMike Jordan
randy Phone #: ###-####. Counter top in break room ok. Ok for prm occ.
Print Occupancy Form  4/30/2019 DONE
Permanent Occupancy  4/30/2019 DONE
CHANGE STATUS TO (FNL)  4/30/2019 DONE
perm occ issued
Change Expiration Date Only  4/30/2019 DONE
adjusted exp date to reflect original issued date
BLD-Final4/29/20194/29/20194/29/2019PPART
DetailsMike Jordan
Randy Phone #: ###-####. Ok for temp occ. Neeeds to provide 34inch max counter in breakroom.
FIRE-Final Inspection4/29/20194/29/20194/29/2019APASS
DetailsMark Scharfen
Passed fire final

Thanks Troy Phone #: ###-#### Inspection requested via web by Randy Young
Print Occupancy Form  4/26/2019 DONE
CHANGE STATUS TO (ISS)  4/26/2019 DONE
Routing - PLAN CHECK4/25/2019 4/25/2019 PASS
DetailsMichael Hanson
2 hour plan mod fees
Permit Ready to Issue  4/25/2019 DONE
plan mod-please do not re issue
Plan assigned to (M_H)4/17/2019 4/25/2019 DONE
DetailsMichael Hanson
1st review for plan mod completed - 04/23 Plan mod
Routing - PLAN CHECK4/18/2019 4/23/2019 FAIL
DetailsMichael Hanson
See changemark in ePlan for correction required.
Routing - PUBLIC WORKS4/18/2019 4/19/2019 PASS
DetailsAngela Hardy
Plan Modification Accepted  4/18/2019 DONE
DetailsMichael Hanson
Plan Modification Accepted  4/17/2019 DONE
Remove dishwasher and millwork size
BLD-Framing/Rough-in4/10/20194/11/20194/11/2019APASS
DetailsMike Jordan
Randy Phone #: ###-####. Interior steel stud framed walls and hardlid ok.
Telephone call  4/9/2019 DONE
received invalid certificate of value. total project value was less than electrical and plumbing combined. Requested new COV from customer.
Issue PAID IN FULL permit  4/9/2019 DONE
Print Occupancy Form  4/9/2019 DONE
CHANGE ISSUED DATE  4/9/2019 DONE
issued twice by mistake
Route to Impact Fee Review4/8/20194/11/20194/8/2019 PASS
DetailsKarina Myles
Review requested for Commercial Permit
Plan assigned to (M_H)3/28/2019 4/8/2019 DONE
DetailsMichael Hanson
1st review completed - 04/09 #518 L2 ePlan
Routing - PLAN CHECK3/28/2019 4/8/2019 FAIL
DetailsMichael Hanson
See changemarks in ePlan for corrections required.
1st review completed  4/8/2019 FAIL
DetailsMichael Hanson
Routing - PLAN CHECK4/8/2019 4/8/2019 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  4/8/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  4/8/2019 DONE
Need Rev Val -MET

RENEWCON@OUTLOOK.COM
Routing - Addressing3/28/2019 3/28/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS3/28/2019 3/28/2019 PASS
DetailsMorgan Webb
Intake Approval  3/26/2019 FAIL
DetailsJavier Guzman
Provide and upload the following:
• Checklist must be completed and uploaded in the documents file, checklist can be found at https://pds.cityofboise.org/media/103552/518-minor-ti-submittal-checklist_7-5-16.pdf
• The checklist is not complete unless all information is filled out, all appropriate boxes are checked and all plan page numbers are listed. Incomplete submittals will not be accepted
• Provide any additional items requested from the checklist that applies to this project.
• The uploaded COMcheck is invalid as the listed code year is not current, No site address info and Not signed or dated. For a list of current code go to https://pds.cityofboise.org/media/1951/currently-adopted-building-codes-12-27-17.pdf
Application received  3/25/2019 DONE
Application submitted via PDS Online on Mar 25 2019 2:57PM
Intake Approval  3/7/2019 PASS
DetailsJavier Guzman