BLD-Aging Inspection | 10/11/2019 | 10/11/2019 | 10/11/2019 | | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 5/28/2019 | 5/28/2019 | 5/29/2019 | P | PASS |
Brandon Shaw
|
|
|
Tom- please call for access Phone #: ###-####
|
BLD-Framing/Rough-in | 5/10/2019 | 5/13/2019 | 5/13/2019 | A | PART |
Jim Storey
|
|
|
Val Phone #: ###-#### walls and hardware per plan pending roof panels
|
BLD-Framing/Rough-in | 5/3/2019 | 5/6/2019 | 5/6/2019 | A | NR |
Jim Storey
|
|
|
Val Phone #: ###-#### conf
|
BLD-Footing | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Jim Storey
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 4/17/2019 | 4/18/2019 | 4/18/2019 | P | CANC |
Jim Storey
|
|
|
Bill Phone #: ###-####
|
Plan assigned to (RDP) | 4/17/2019 | 4/17/2019 | 4/17/2019 | | DONE |
Rob Patrick
|
|
|
|
Routing Walk-In (BLD) | 4/17/2019 | 4/17/2019 | 4/17/2019 | P | DONE |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 4/17/2019 | | 4/17/2019 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 4/17/2019 | | DONE |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 4/17/2019 | | DONE |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 4/17/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/17/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 4/17/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/17/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | FAIL |
Josh Bogle
|
|
|
needs a floor framing Section View showing how floor is built and distance from dirt to framing - needs engineering clarity on how roof/beam/studs connect
|
Routing Walk-In (BLD) | 3/27/2019 | 3/27/2019 | 3/27/2019 | P | FAIL |
Josh Bogle
|
|
|
plans lacked needed details
|
Routing Walk-In (Zoning) | 3/25/2019 | 3/25/2019 | 3/25/2019 | P | PASS |
Ethan Mansfield
|
|
|
|
Routing Walk-In (BLD) | 3/25/2019 | 3/25/2019 | 3/25/2019 | P | FAIL |
Brian McGowan
|
|
|
No contact
|
1st review completed | | | 3/25/2019 | | FAIL |
Brian McGowan
|
|
|
No contact
|
Routing - PLAN CHECK | 3/25/2019 | | 3/25/2019 | | FAIL |
Brian McGowan
|
|
|
No contact
|
Application received | | 3/25/2019 | | | |
|
|
|
|