Permit Information
Permit NumberBLD19-00962
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2895 S GREBE PL
Project NameHarris Ranch North #1
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 3355 sq. ft., two story (first story 1634 sq. ft., second story 1721 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 280 sq. ft. of covered patio/porch and a 920 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. ***RDP*** NO SPRINKLERS REQUIRED. ***LGM*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/15/20199/16/20199/16/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled9/16/20199/16/20199/16/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results9/13/20199/13/20199/13/2019PDONE
DetailsBrandon Shaw
ACH50- 4.41
BLD-Final9/13/20199/13/20199/13/2019PNR
DetailsBrandon Shaw
Need PW and Mech final...
PubWorks Occupancy Approval9/13/20199/13/20199/13/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Other6/22/20196/24/20196/24/2019ACANC
DetailsBrandon Shaw
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Energy code compliance6/19/20196/20/20196/20/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Framing/Rough-in6/18/20196/18/20196/18/2019PPEND
DetailsBrandon Shaw
Per walk thru and S1.1 detail 3- Add floor joist for shear transfer...
BLD-Framing/Rough-in6/15/20196/17/20196/17/2019PNR
DetailsBrandon Shaw
See previous note- tighten hold down hardware...
BLD-Wall Bracing6/2/20196/3/20196/3/2019APART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kyle Seick nailling ok for cover// hold downs need nuts and finsh instal.
BLD-Wall Bracing5/31/20195/31/20195/31/2019PNR
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Foundation4/29/20194/29/20194/29/2019APASS
DetailsDave Hannah
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Footing4/25/20194/25/20194/25/2019APASS
DetailsBrandon Shaw
Work in progress...
PubWorks Subgrade Approval4/25/20194/25/20194/25/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

BLD-Footing4/24/20194/24/20194/24/2019PFAIL
DetailsBrandon Shaw
Need soil subgrade submitted and approved by PW...
BLD-Footing4/22/20194/23/20194/23/2019ACANC
DetailsBrandon Shaw
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
Issue PAID IN FULL permit  4/18/2019 DONE
Inspection Record Card- Bld  4/18/2019 DONE
OVERRIDE  4/8/2019  
Plan assigned to (RDP)3/27/20193/27/20194/8/2019 DONE
DetailsRob Patrick
04/15 sfd L2 ePlan...04/08 Failed
Routing - PLAN CHECK3/27/2019 4/8/2019 FAIL
DetailsRob Patrick
Corrections Req'd
1st review completed  4/8/2019 FAIL
DetailsRob Patrick
Corrections Req'd
Routing - PLAN CHECK4/8/2019 4/8/2019 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  4/8/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  4/8/2019 DONE
Route to Impact Fee Review3/27/20193/30/20193/28/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL3/27/2019 3/28/2019 PASS
DetailsTroy James
Routing PW Grading-Hillside3/27/2019 3/28/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Routing - FIRE3/27/20193/27/20193/27/2019 PASS
DetailsLee G Meredith
04/10-2895 S Grebe Residential Fire review.

NO SPRINLKERS REQUIRED.
Routing - PLANNING3/27/2019 3/27/2019 PASS
DetailsSue Cummings
Routing - Addressing3/27/2019 3/27/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS3/27/2019 3/27/2019 PASS
DetailsAngela Hardy
Routing - Erosion and Sediment3/27/2019 3/27/2019 PASS
DetailsMichael Zawacki
Plans ACCEPTED BY PLAN TECH  3/27/2019 DONE
Recd Pcfee & Taken To Pln CK  3/27/2019 DONE
Intake Approval  3/27/2019 PASS
Application received  3/26/2019 DONE
Application submitted via PDS Online on Mar 26 2019 2:08PM