BLD-Final | 9/15/2019 | 9/16/2019 | 9/16/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.41
|
BLD-Final | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | NR |
Brandon Shaw
|
|
|
Need PW and Mech final...
|
PubWorks Occupancy Approval | 9/13/2019 | 9/13/2019 | 9/13/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Other | 6/22/2019 | 6/24/2019 | 6/24/2019 | A | CANC |
Brandon Shaw
|
|
|
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Energy code compliance | 6/19/2019 | 6/20/2019 | 6/20/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Framing/Rough-in | 6/18/2019 | 6/18/2019 | 6/18/2019 | P | PEND |
Brandon Shaw
|
|
|
Per walk thru and S1.1 detail 3- Add floor joist for shear transfer...
|
BLD-Framing/Rough-in | 6/15/2019 | 6/17/2019 | 6/17/2019 | P | NR |
Brandon Shaw
|
|
|
See previous note- tighten hold down hardware...
|
BLD-Wall Bracing | 6/2/2019 | 6/3/2019 | 6/3/2019 | A | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick nailling ok for cover// hold downs need nuts and finsh instal.
|
BLD-Wall Bracing | 5/31/2019 | 5/31/2019 | 5/31/2019 | P | NR |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Foundation | 4/29/2019 | 4/29/2019 | 4/29/2019 | A | PASS |
Dave Hannah
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 4/25/2019 | 4/25/2019 | 4/25/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
PubWorks Subgrade Approval | 4/25/2019 | 4/25/2019 | 4/25/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | FAIL |
Brandon Shaw
|
|
|
Need soil subgrade submitted and approved by PW...
|
BLD-Footing | 4/22/2019 | 4/23/2019 | 4/23/2019 | A | CANC |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
Issue PAID IN FULL permit | | | 4/18/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/18/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 4/8/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 3/27/2019 | 3/27/2019 | 4/8/2019 | | DONE |
Rob Patrick
|
|
|
04/15 sfd L2 ePlan...04/08 Failed
|
Routing - PLAN CHECK | 3/27/2019 | | 4/8/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
1st review completed | | | 4/8/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - PLAN CHECK | 4/8/2019 | | 4/8/2019 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/8/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 4/8/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 3/27/2019 | 3/30/2019 | 3/28/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 3/27/2019 | | 3/28/2019 | | PASS |
Troy James
|
|
|
|
Routing PW Grading-Hillside | 3/27/2019 | | 3/28/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - FIRE | 3/27/2019 | 3/27/2019 | 3/27/2019 | | PASS |
Lee G Meredith
|
|
|
04/10-2895 S Grebe Residential Fire review.
NO SPRINLKERS REQUIRED.
|
Routing - PLANNING | 3/27/2019 | | 3/27/2019 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 3/27/2019 | | 3/27/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 3/27/2019 | | 3/27/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 3/27/2019 | | 3/27/2019 | | PASS |
Michael Zawacki
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/27/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/27/2019 | | DONE |
|
|
|
|
Intake Approval | | | 3/27/2019 | | PASS |
|
|
|
|
Application received | | | 3/26/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 26 2019 2:08PM
|