Letter of compliance/Occupancy | | | 10/28/2019 | | DONE |
|
|
|
|
First Notice | 9/12/2019 | 9/12/2019 | 10/23/2019 | | DONE |
Mike Jordan
|
|
|
This permit finaled on the web by Ami Ostrow
|
BLD-Final | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Darius Saxton
|
DOC - Permit Finaled | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Darius Saxton
|
FIRE-Conference | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | CANC |
Jim Page
|
|
|
Phone #: ###-#### Inspection requested via web by Darius Saxton
|
FIRE-Final Inspection | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | CANC |
Jim Page
|
|
|
Phone #: ###-#### Inspection requested via web by Darius Saxton
|
Plan assigned to (JAR) | 8/8/2019 | 8/8/2019 | 8/15/2019 | | DONE |
Julie Romig
|
|
|
08/15 - Plan Mod SARMC Comm Rm - Adding fire damper to new partition wall
|
Routing - PLAN CHECK | 8/9/2019 | | 8/15/2019 | | PASS |
Julie Romig
|
|
|
|
Permit Ready to Issue | | | 8/15/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/15/2019 | | DONE |
|
|
|
plan mod approved and paid
|
Routing - MECHANICAL | 8/13/2019 | | 8/13/2019 | | PASS |
Troy James
|
|
|
Added fire damper
|
Plan Modification Accepted | | | 8/8/2019 | | DONE |
|
|
|
plan mod request via email from Thomas J Scofield- Adding fire damper to new partition wall
|
BLD-Wall cover | 7/30/2019 | 7/31/2019 | 7/31/2019 | A | PASS |
Mike Jordan
|
|
|
As early as possible, please. Call Darius. Thank you. Phone #: ###-#### Inspection requested via web by Ami Ostrow
|
BLD-Framing/Rough-in | 7/24/2019 | 7/29/2019 | 7/29/2019 | A | PASS |
Mike Jordan
|
|
|
Please call Darius. Phone #: ###-#### Inspection requested via web by Ami Ostrow. Interior steel stud framed wall for 1hr. fire barier.
|
Inspection Record Card- Bld | | | 7/17/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/17/2019 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 4/23/2019 | 4/23/2019 | 7/12/2019 | | DONE |
Julie Romig
|
|
|
07/09 - 2nd Rev - 1st Rev Comp - L3 SARMC DS Comm Room Expansion
|
Routing - PLAN CHECK | 7/3/2019 | | 7/12/2019 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/12/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/12/2019 | | DONE |
|
|
|
emailed Aostrow@andersen-construction.com the fee amount
met-Need GC
met-Need Rev Val
|
Routing - Design Review | 7/3/2019 | | 7/3/2019 | | PASS |
KayCee Babb
|
|
|
Per CZC19-00175, to comply with all conditions of approval, including note on Sheet E2.7B that new mechanical unit shall be equal to or less in height than the existing parapet or additional screening shall be provided, as approved by Design Review.
|
Route to Impact Fee Review | 5/16/2019 | 5/19/2019 | 5/17/2019 | | PASS |
Karina Myles
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 4/23/2019 | 4/23/2019 | 5/16/2019 | | PASS |
Mark Scharfen
|
|
|
Completed fire review and uploaded rev_fire 05.16.2019.pdf.
|
1st review completed | | | 5/16/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 4/23/2019 | | 5/16/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing - MECHANICAL | 4/23/2019 | | 4/24/2019 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 4/23/2019 | | 4/24/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/23/2019 | | 4/24/2019 | | PASS |
Morgan Webb
|
|
|
NO NEW PLUMBING
|
Intake Approval | | | 4/19/2019 | | PASS |
|
|
|
|
Intake Approval | | | 4/18/2019 | | FAIL |
Brian McGowan
|
|
|
Current Codes required on Cover Sheet
|
Intake Approval | | | 4/11/2019 | | FAIL |
Brian McGowan
|
|
|
1. The current Code requirements for Boise City need to be listed on the Cover Sheet (2015 IBC, 2015 IEBC etc.). No Sheet A0.1 was uploaded which might contain the required information as noted on Sheet 0.0 under Building Data. Please upload this sheet if so.
|
Intake Approval | | | 4/10/2019 | | FAIL |
Brian McGowan
|
|
|
In order for your Prescreen to be approved, please provide the following information;
1. The current Code requirements for Boise City need to be listed on the Cover Sheet. (No Sheet 0.1 was uploaded)
The following Sheets were listed in the #520 Submittal Checklist but no Sheet with that notation was uploaded.
2. No Sheet 0.1 was uploaded.
3. No Sheet A2.0 was uploaded.
4. No Sheet E0.1 was uploaded
5. No Sheet E2.0 was uploaded
|
Application received | | | 3/27/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 27 2019 2:48PM
|