BLD-Final | 10/9/2019 | 10/10/2019 | 10/11/2019 | A | PASS |
Tell Riley
|
|
|
Danial,, call 1st; Phone #: ###-####//c of c issued//owner will seal around duct area at attic for fire separation of garage//discussed the area onsite//all other corrections have been made//
|
DOC - Permit Finaled | 10/11/2019 | 10/11/2019 | 10/11/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 10/9/2019 | 10/9/2019 | 10/9/2019 | P | CANC |
Tony Young
|
|
|
|
BLD-Final | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | FAIL |
Tell Riley
|
|
|
Danial,, call 1st; Phone #: ###-####//need to add smoke detectors to bedrooms upstairs-and combo in hall//adjust door hinges at garage man door//need mechanical permit for installation//need to finish fire separation at garage wall//add bollard for mechanical protection//
|
BLD-Framing/Rough-in | 5/15/2019 | 5/16/2019 | 5/16/2019 | A | PASS |
Jim Sly
|
|
|
Ross Phone #: ###-#### Frame and energy.....OK.
|
Routing Walk-In (Zoning) | 3/28/2019 | 3/28/2019 | 3/28/2019 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 3/28/2019 | 3/28/2019 | 3/28/2019 | P | PASS |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 3/28/2019 | 3/28/2019 | 3/28/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/28/2019 | | 3/28/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 3/28/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/28/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/28/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/28/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/28/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/28/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/28/2019 | | 3/28/2019 | | FAIL |
Josh Bogle
|
|
|
plan lacked structural details
|
1st review completed | | | 3/28/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 3/28/2019 | | | |
|
|
|
|