Permit Information
Permit NumberBLD19-01000
StatusFinaled
Name DAGLE HOMES INC
Site Address 3670 W QUAIL HOLLOW CT
Project NameMichael & Kathy Crowley Reside
Customer Number 
ePlanReviewNo
Description
**PLAN MODIFICATION 6/5/19 changing elevation of house JJN** **HILLSIDE** **WUI FOOTHILLS ZONE A REQUIREMENTS** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2572 sq. ft., two story (first story 1722 sq. ft., second story 850 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 130 sq. ft. of covered patio/porch and a 889 sq. ft. attached garage per the approved plans and any notations. A-1 zoning and setbacks per planning. JJN SPRINKLERS REQUIRED AND PROVIDED UNDER PERMIT FIR19-00254. LGM A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.


Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/1/201911/4/201911/4/2019APASS
DetailsTony Young
Mark Dagle Phone #: ###-####
DOC - Permit Finaled11/4/201911/4/201911/4/2019PPASS
DetailsTony Young
BLD-Blower Door Test Results11/4/201911/4/201911/4/2019PDONE
DetailsTony Young
Mark Dagle Phone #: ###-####/// 4.32
BLD-Final10/24/201910/24/201910/24/2019PFAIL
DetailsTell Riley
Mark Phone #: ###-####//correction notice issued//need to add combo smoke detector//guard too low at upper deck//adjust garage man door hinges//need blower door test//seal separation wall penetrations//
PubWorks Occupancy Approval10/22/201910/22/201910/22/2019 DONE
DetailsMelissa Jannusch
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Other8/16/20198/16/20198/16/2019PPART
DetailsTony Young
soffit is stucco,, work in progress
BLD-Wall Bracing8/15/20198/16/20198/16/2019APASS
DetailsTony Young
Mark Phone #: ###-####,, interior shear
BLD-Energy code compliance8/14/20198/15/20198/15/2019PPASS
DetailsTony Young
Mark Phone #: ###-####
BLD-Framing/Rough-in8/14/20198/15/20198/15/2019PPASS
DetailsTony Young
Mark Phone #: ###-####
BLD-Framing/Rough-in8/9/20198/9/20198/9/2019PPART
DetailsTony Young
Mark Phone #: ###-####-please call 30 minutes prior to meet for access,, met framer, builder on site,, c/n posted,, needs fix on sprinkler in the front entry area,, needs freeze protection,, shear wall fixes, straps on shear, header as needed, brace trusses as needed,, nail braces as needed,, ok to insulate
BLD-Framing/Rough-in8/8/20198/9/20198/9/2019ANR
DetailsTony Young
Mark Phone #: ###-####-please call 30 minutes prior to meet for access,, needs plans, truss layout
Routing - MECHANICAL8/6/2019 8/6/2019 PASS
DetailsTroy James
New manual j report
BLD-Wall Bracing7/29/20198/1/20198/1/2019APART
DetailsTony Young
James- please call for access Phone #: ###-####,, exterior ok to cover
BLD-Wall Bracing7/26/20197/29/20197/29/2019ANR
DetailsTony Young
James- please call for access Phone #: ###-####,, needs more nailing
CHANGE STATUS TO (ISS)  6/6/2019 DONE
BLD-Foundation6/5/20196/5/20196/5/2019PPART
DetailsTony Young
Mark-STEM-Phone #: ###-####,, work in progress,, ok
OVERRIDE  6/5/2019  
Plan assigned to (J_N)6/3/20196/3/20196/5/2019 DONE
DetailsJenny Nelson
Plan Mod
Routing PW Grading-Hillside6/5/2019 6/5/2019 PASS
DetailsMelissa Jannusch
Plan mod approved. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Telephone call  6/5/2019 DONE
concrete person called in foundation wall but i told him he needed to wait for the approval of the plan mod since they are changing the elevation
Routing - PLAN CHECK6/5/2019 6/5/2019 PASS
DetailsJenny Nelson
1 hour plan mod fee
Case Summary (BLD)  6/5/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  6/5/2019 DONE
plan mod please do not re issue
Telephone call  6/5/2019 DONE
called Mark to let know plan mod is ready and how much is owed
Inspection Record Card- Bld  6/5/2019 DONE
BLD-Footing5/31/20196/3/20196/3/2019APASS
DetailsTony Young
Derik Phone #: ###-####
Plan Modification Accepted  6/3/2019 DONE
changing elevation of home
PubWorks Subgrade Approval5/24/20195/24/20195/24/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

OVERRIDE  5/14/2019  
Plan assigned to (J_N)4/12/20194/12/20195/14/2019 DONE
DetailsJenny Nelson
04/16 sfd L2 Paper. 2nd complete, waiting for planning and hillside. 1st complete 4/15, foundation elevations, show shear wall lines, headers don't match calculations, foundation venting, update code year.
Inspection Record Card- Bld  5/14/2019 DONE
Telephone call  5/14/2019 DONE
spoke with mark infoming him that this permit is ready and the fee amount due for issuance and will need to know who the RP will be. he asked it be emailed as well.
Issue PAID IN FULL permit  5/14/2019 DONE
Routing PW Grading-Hillside5/7/2019 5/14/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.


Case Summary (BLD)  5/14/2019 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  5/14/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  5/14/2019 DONE
need RP
Plan resubmittals received  5/8/2019 DONE
two copies of sheet G.1 taken to jenny
Plan resubmittals received  5/7/2019 DONE
Two set of whole new plans to match new set backs stamped and taken to Jenny
Routing - PLAN CHECK5/7/2019 5/7/2019 PASS
DetailsJenny Nelson
Routing - PLANNING5/7/2019 5/7/2019 PASS
DetailsCeline Acord
Routing PW Grading-Hillside4/16/2019 4/16/2019 FAIL
DetailsMelissa Jannusch
Grading is approvable but the setback issue will need to be resolved with P&Z prior to hillside approval as these changes may impact the grading plans. Any changes to the grading and drainage plans may result in the need for additional P&Z approval and grading review.
1st review completed  4/15/2019 DONE
DetailsJenny Nelson
Routing - PLAN CHECK  4/15/2019 FAIL
DetailsJenny Nelson
Plan assigned to (M_H)3/28/2019 4/12/2019 DEFR
DetailsMichael Hanson
04/16 #404 L2 Paper
Routing - FIRE4/10/2019 4/12/2019 PASS
DetailsLee G Meredith
04/10 Michael and Kathy Crowley Residence

Fire sprinklers required and provided under permit FIR19-00254.
Routing - Erosion and Sediment4/9/2019 4/10/2019 PASS
DetailsAndy J. Long
ESC site map and project narrative approved. Need to designate certified Responsible Person. Site preparation inspection is REQUIRED.
Plan resubmittals received  4/10/2019 DONE
Brought a third copy of the Report udate Letter for testing and inspections, Site plan, grading plan, slope set backs and erosion plans stamped and taken to plan reviewer.
Routing - MECHANICAL4/8/2019 4/9/2019 PASS
DetailsTroy James
Routing - PUBLIC WORKS3/28/2019 4/5/2019 PASS
DetailsAngela Hardy
Routing PW Grading-Hillside4/1/2019 4/5/2019 FAIL
DetailsMelissa Jannusch
Route to Impact Fee Review3/28/20193/31/20193/29/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing3/28/2019 3/29/2019 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  3/28/2019 DONE
Recd Pcfee & Taken To Pln CK  3/28/2019 DONE
Intake Approval  3/28/2019 PASS
Application received 3/28/2019   
Routing - PLANNING4/5/2019   FAIL
Fail; Does not comply with side and front setbacks of the A-1 Zone.