Third Notice | | 11/30/2019 | 12/9/2019 | | DONE |
|
|
|
This permit finaled on the web by Ryan Allen
|
Third Notice | | 10/30/2019 | 11/25/2019 | | DONE |
|
|
|
mailed 12-2-19
|
Second Notice | | 9/28/2019 | 10/25/2019 | | DONE |
|
|
|
|
First Notice | | 8/31/2019 | 9/18/2019 | | DONE |
|
|
|
mailed 9-19-19
|
BLD-Final | 8/21/2019 | 8/21/2019 | 8/21/2019 | P | PASS |
Mike Jordan
|
|
|
Sorry for the re inspections. Kris has appropriate signage and it will be up by noon. Thanks Phone #: ###-#### Inspection requested via web by Ryan Allen. All issues resolved. Ok for perm occ.
|
Print Occupancy Form | | | 8/21/2019 | | DONE |
|
|
|
|
Permanent Occupancy | | | 8/21/2019 | | DONE |
|
|
|
|
BLD-Final | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | FAIL |
Mike Jordan
|
|
|
Re inspection for full c.o. Thanks Phone #: ###-#### Inspection requested via web by Ryan Allen. All issues resolved except for the ADA bathroom signage. Provided signage is not ADA compliant.
|
Temporary Occupancy | 8/15/2019 | 11/13/2019 | 8/15/2019 | | DONE |
Judith Amador
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/15/2019 | | DONE |
|
|
|
|
BLD-Final | 8/11/2019 | 8/12/2019 | 8/12/2019 | P | PART |
Mike Jordan
|
|
|
Kris will be the onsite contact for this. His number is above. Thanks Phone #: ###-#### Inspection requested via web by Ryan Allen. Post building address. Install ADA bathroom signs. Provide ADa compliant mirrors in bathrooms. Correction notice issued. Ok for temp. occ.
|
FIRE-Final Inspection | 8/11/2019 | 8/12/2019 | 8/12/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, no fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags, addressing will be installed before BLD final. Final life fire safety inspection for area of work complete.
Kris will be the contact for this inspection. Phone #: ###-#### Inspection requested via web by Ryan Allen
|
Plan assigned to (JG) | 8/5/2019 | 8/5/2019 | 8/12/2019 | | DONE |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 8/12/2019 | | DONE |
|
|
|
Plan Mod Approved - DO NOT REISSUE
|
Routing - PLAN CHECK | 8/12/2019 | | 8/12/2019 | | PASS |
Carl D Madsen
|
|
|
|
FIRE-Final Inspection | 8/6/2019 | 8/6/2019 | 8/6/2019 | P | FAIL |
Troy Cobbley
|
|
|
Provide single action hardware on the south exit door as per plans and provide testing of the exit lights/emergency lights/exit discharge lights.
Kris will be the on site contact for this. Please call him prior to your coming so he can be sure to be there. Thanks Phone #: ###-#### Inspection requested via web by Ryan Allen
|
Plan Modification Accepted | | | 8/5/2019 | | DONE |
|
|
|
workflow started, changing floor plan
|
BLD-Energy code compliance | 7/9/2019 | 7/9/2019 | 7/9/2019 | P | PASS |
Mike Jordan
|
|
|
Insulation will be completed by about 3. Hopefully this will work in your schedule. Thanks Phone #: ###-#### Inspection requested via web by Ryan Allen
|
BLD-Framing/Rough-in | 7/8/2019 | 7/9/2019 | 7/9/2019 | A | PASS |
Mike Jordan
|
|
|
Inspection of framing for new interior walls Phone #: ###-#### Inspection requested via web by Ryan Allen. Ok to insulate.
|
BLD-Framing/Rough-in | 7/8/2019 | 7/8/2019 | 7/8/2019 | A | CANC |
Mike Jordan
|
|
|
Inspection of new framing in T.I. project. Thanks Phone #: ###-#### >> Inspection requested via web by Ryan Allen Inspection cancelled from web by: Ryan Allen
|
BLD-Conference | 6/13/2019 | 6/14/2019 | 6/14/2019 | A | DONE |
Mike Jordan
|
|
|
We would like ok to hang double 5/8 sheetrock to area of fire wall where we will later frame perpendicular walls onto. No plumbing or electrical or HVAC is embedded within this portion of wall. Please call Kris, the contact for this ###-####. He can meet you if needed. Key box code on door is 1127. Thank you Phone #: ###-#### Inspection requested via web by Ryan Allen
|
Print Occupancy Form | | | 5/9/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/9/2019 | | DONE |
|
|
|
|
Routing - FIRE | 5/1/2019 | 5/1/2019 | 5/7/2019 | | PASS |
Mark Scharfen
|
|
|
05.07.2019-Finished fire review, uploaded rev_fire 05.07.2019.pdf. Passed Fire review.
|
Plan assigned to (JG) | 4/6/2019 | 4/6/2019 | 5/7/2019 | | PASS |
Javier Guzman
|
|
|
2nd rev, 04/23 L3 Caffecina ePlan, pend fire
|
Routing PW Environmental | 5/1/2019 | | 5/7/2019 | | PASS |
Rick Christenson
|
|
|
Connection to GW Line shown.
|
Routing - PLAN CHECK | 5/1/2019 | | 5/7/2019 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/7/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/7/2019 | | DONE |
|
|
|
NEED
GC FORM
REVISED VALUE
|
Routing - MECHANICAL | 5/1/2019 | | 5/6/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 5/1/2019 | | 5/2/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Route to Impact Fee Review | 4/30/2019 | 5/3/2019 | 5/1/2019 | | PASS |
Karina Myles
|
|
|
Review requested for Commercial Permit
|
Routing - PUBLIC WORKS | 5/1/2019 | | 5/1/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - FIRE | 4/6/2019 | 4/6/2019 | 4/30/2019 | | FAIL |
Mark Scharfen
|
|
|
Completed fire review 04.30.2019. Uploaded IFC 1st review 04.29.2019.pdf and emailed architect.
|
1st review completed | | | 4/30/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 4/6/2019 | | 4/20/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - C.D.H | 4/6/2019 | | 4/19/2019 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by Central District Health Department Matt McDonald
|
Routing PW Environmental | 4/9/2019 | | 4/12/2019 | | FAIL |
Rick Christenson
|
|
|
Facility needs grease abatement. Contact Rick Christenson @ ###-#### or Terry Alber @ ###-####.
|
Routing - MECHANICAL | 4/6/2019 | | 4/11/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 4/6/2019 | | 4/9/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PUBLIC WORKS | 4/6/2019 | | 4/9/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - PLANNING | 4/6/2019 | | 4/8/2019 | | PASS |
David Moser
|
|
|
Allowed in zone and Drive Thru Window approved with COP07-00046
|
Routing - Addressing | 4/6/2019 | | 4/8/2019 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 4/3/2019 | | PASS |
|
|
|
|
Intake Approval | | | 3/29/2019 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following:
• Site specific fire flow at hydrants letter from Suez Water or other public water provider.
• Provide and reserve at bottom right corner a blank 4” x 4” space located 3” off the right sheet edge to allow for the title block on plan sheet A0.0 per ePlan submittal standards.
|
Application received | | | 3/28/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 28 2019 3:11PM
|