Permit Information
Permit NumberBLD19-01002
StatusFinaled
Name ARTISAN CUSTOM CARPENTRY AND RENOVA
Site Address 6575 W OVERLAND RD
Project NameCaffeina
Customer Number 
ePlanReviewYes
Description
(CAFFEINA)""PLAN MODIFICATION FOR THE RELOCATION OF THE RESTROOMS AND JANITORS ROOM"" Permit is to build out for the first time a 1,360 sq. ft. restaurant tenant space (Building shell under BLD07-01506). Approval is contingent upon adhering to the approved plans on file and plan review report. Work to include: construction of interior non-bearing walls to create a janitor’s closet, two accessible restrooms and dining/kitchen area, new door/door frames, millwork, kitchen equipment, select new gypsum ceiling, light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is Not Fire Sprinklered. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 11/30/201912/9/2019 DONE
This permit finaled on the web by Ryan Allen
Third Notice 10/30/201911/25/2019 DONE
mailed 12-2-19
Second Notice 9/28/201910/25/2019 DONE
First Notice 8/31/20199/18/2019 DONE
mailed 9-19-19
BLD-Final8/21/20198/21/20198/21/2019PPASS
DetailsMike Jordan
Sorry for the re inspections. Kris has appropriate signage and it will be up by noon. Thanks Phone #: ###-#### Inspection requested via web by Ryan Allen. All issues resolved. Ok for perm occ.
Print Occupancy Form  8/21/2019 DONE
Permanent Occupancy  8/21/2019 DONE
BLD-Final8/20/20198/20/20198/20/2019PFAIL
DetailsMike Jordan
Re inspection for full c.o.
Thanks Phone #: ###-#### Inspection requested via web by Ryan Allen. All issues resolved except for the ADA bathroom signage. Provided signage is not ADA compliant.
Temporary Occupancy8/15/201911/13/20198/15/2019 DONE
DetailsJudith Amador
CHANGE STATUS TO (ISS)  8/15/2019 DONE
BLD-Final8/11/20198/12/20198/12/2019PPART
DetailsMike Jordan
Kris will be the onsite contact for this. His number is above.
Thanks Phone #: ###-#### Inspection requested via web by Ryan Allen. Post building address. Install ADA bathroom signs. Provide ADa compliant mirrors in bathrooms. Correction notice issued. Ok for temp. occ.
FIRE-Final Inspection8/11/20198/12/20198/12/2019APASS
DetailsJim Page
Previously noted items have been corrected, no fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags, addressing will be installed before BLD final. Final life fire safety inspection for area of work complete.

Kris will be the contact for this inspection. Phone #: ###-#### Inspection requested via web by Ryan Allen
Plan assigned to (JG)8/5/20198/5/20198/12/2019 DONE
DetailsJavier Guzman
Permit Ready to Issue  8/12/2019 DONE
Plan Mod Approved - DO NOT REISSUE
Routing - PLAN CHECK8/12/2019 8/12/2019 PASS
DetailsCarl D Madsen
FIRE-Final Inspection8/6/20198/6/20198/6/2019PFAIL
DetailsTroy Cobbley
Provide single action hardware on the south exit door as per plans and provide testing of the exit lights/emergency lights/exit discharge lights.

Kris will be the on site contact for this. Please call him prior to your coming so he can be sure to be there.
Thanks Phone #: ###-#### Inspection requested via web by Ryan Allen
Plan Modification Accepted  8/5/2019 DONE
workflow started, changing floor plan
BLD-Energy code compliance7/9/20197/9/20197/9/2019PPASS
DetailsMike Jordan
Insulation will be completed by about 3. Hopefully this will work in your schedule. Thanks Phone #: ###-#### Inspection requested via web by Ryan Allen
BLD-Framing/Rough-in7/8/20197/9/20197/9/2019APASS
DetailsMike Jordan
Inspection of framing for new interior walls Phone #: ###-#### Inspection requested via web by Ryan Allen. Ok to insulate.
BLD-Framing/Rough-in7/8/20197/8/20197/8/2019ACANC
DetailsMike Jordan
Inspection of new framing in T.I. project.
Thanks Phone #: ###-#### >> Inspection requested via web by Ryan Allen Inspection cancelled from web by: Ryan Allen
BLD-Conference6/13/20196/14/20196/14/2019ADONE
DetailsMike Jordan
We would like ok to hang double 5/8 sheetrock to area of fire wall where we will later frame perpendicular walls onto. No plumbing or electrical or HVAC is embedded within this portion of wall. Please call Kris, the contact for this ###-####. He can meet you if needed. Key box code on door is 1127.
Thank you Phone #: ###-#### Inspection requested via web by Ryan Allen
Print Occupancy Form  5/9/2019 DONE
Issue PAID IN FULL permit  5/9/2019 DONE
Routing - FIRE5/1/20195/1/20195/7/2019 PASS
DetailsMark Scharfen
05.07.2019-Finished fire review, uploaded rev_fire 05.07.2019.pdf. Passed Fire review.
Plan assigned to (JG)4/6/20194/6/20195/7/2019 PASS
DetailsJavier Guzman
2nd rev, 04/23 L3 Caffecina ePlan, pend fire
Routing PW Environmental5/1/2019 5/7/2019 PASS
DetailsRick Christenson
Connection to GW Line shown.
Routing - PLAN CHECK5/1/2019 5/7/2019 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  5/7/2019 DONE
Permit Ready to Issue  5/7/2019 DONE
NEED
GC FORM
REVISED VALUE
Routing - MECHANICAL5/1/2019 5/6/2019 PASS
DetailsTroy James
Routing - PLUMBING5/1/2019 5/2/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Route to Impact Fee Review4/30/20195/3/20195/1/2019 PASS
DetailsKarina Myles
Review requested for Commercial Permit
Routing - PUBLIC WORKS5/1/2019 5/1/2019 PASS
DetailsMorgan Webb
Routing - FIRE4/6/20194/6/20194/30/2019 FAIL
DetailsMark Scharfen
Completed fire review 04.30.2019. Uploaded IFC 1st review 04.29.2019.pdf and emailed architect.
1st review completed  4/30/2019 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK4/6/2019 4/20/2019 FAIL
DetailsJavier Guzman
Routing Off Site - C.D.H4/6/2019 4/19/2019 PASS
DetailsJavier Guzman
signed off in ePlan by Central District Health Department Matt McDonald

Routing PW Environmental4/9/2019 4/12/2019 FAIL
DetailsRick Christenson
Facility needs grease abatement. Contact Rick Christenson @ ###-#### or Terry Alber @ ###-####.
Routing - MECHANICAL4/6/2019 4/11/2019 PASS
DetailsTroy James
Routing - PLUMBING4/6/2019 4/9/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PUBLIC WORKS4/6/2019 4/9/2019 PASS
DetailsAngela Hardy
Routing - PLANNING4/6/2019 4/8/2019 PASS
DetailsDavid Moser
Allowed in zone and Drive Thru Window approved with COP07-00046
Routing - Addressing4/6/2019 4/8/2019 PASS
DetailsDoug Chausow
Intake Approval  4/3/2019 PASS
Intake Approval  3/29/2019 FAIL
DetailsJavier Guzman
Provide and upload the following:
• Site specific fire flow at hydrants letter from Suez Water or other public water provider.
• Provide and reserve at bottom right corner a blank 4” x 4” space located 3” off the right sheet edge to allow for the title block on plan sheet A0.0 per ePlan submittal standards.
Application received  3/28/2019 DONE
Application submitted via PDS Online on Mar 28 2019 3:11PM