Permit Information
Permit NumberBLD19-01009
StatusFinaled
Name SCE INC
Site Address 445 W MCGREGOR CT
Project NameCenturylink Boise Fuel Module
Customer Number 
ePlanReviewYes
Description
(CENTURYLINK BOISE FUEL MODULE) (CZC18-00305) Permit is for the construction of a new 80 sq. ft. hydrogen fuel module that is approximately 8’x10’ will be anchored to a 10’x11’ concrete pad. Work includes a conduit installed underground for routing the compressed hydrogen gas to the adjacent building that is connected to a fuel cell engine, new concrete pad, fuel module equipment, and installation of fuel cell equipment. This structure is not fire sprinklered. All construction per the approved plans and calculations. **JHB**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice11/7/201911/7/201911/26/2019 DONE
DetailsBrandon Shaw
mailed 12-2-19
BLD-Aging Inspection11/7/201911/7/201911/7/2019 DONE
DetailsBrandon Shaw
DOC - Permit Finaled11/7/201911/7/201911/7/2019PPASS
DetailsBrandon Shaw
Print Occupancy Form  6/26/2019 DONE
Telephone call  6/26/2019 DONE
emailed a new signed of card to GC to -tim@cowboyscrane.com and also informed him that an Electrical permit is needed for the project.
BLD-Footing6/21/20196/25/20196/25/2019APASS
DetailsJim Storey
as late as possible - pouring at 1:30 pm // Dale Phone #: ###-####
Issue PAID IN FULL permit  6/21/2019 DONE
Inspection Record Card- Bld  6/21/2019 DONE
OVERRIDE  6/20/2019  
Plan assigned to (JHB)4/22/20194/23/20196/20/2019 PASS
DetailsJoe Bruce
(3rd Rev Comp) 05/31 - 502 CenturyLink Fuel Module (Fire)
Meeting  6/20/2019 DONE
all met Call PJ at ###-#### with fees

GC Form and Revised Value sent in from phinson@allcomgs.com
Routing - MECHANICAL6/20/2019 6/20/2019 PASS
DetailsTroy James
PLANS/APPL TAKEN TO FRONT DESK  6/20/2019 DONE
Permit Ready to Issue  6/20/2019 DONE
met NEED RP. Interim RP
Routing - FIRE6/19/20196/19/20196/19/2019 PASS
DetailsMark Scharfen
06.19.2019-Completed 4th review. Uploaded rev_fire 06.19.2019.pdf
Routing - FIRE6/7/20196/7/20196/11/2019 FAIL
DetailsMark Scharfen
06.11.2019-Completed fire review. Uploaded rev_fire 06.11.2019.pdf and emailed to applicant.
Plan resubmittals requested  6/11/2019 DONE
DetailsJoe Bruce
Plan resubmittals received  6/7/2019 DONE
DetailsJoe Bruce
Routing - FIRE6/5/20196/5/20196/6/2019 FAIL
DetailsMark Scharfen
06.06.2019-Based on phone call with contractor, shut off not provided. Noted report and plans, uploaded rev_fire 06.06.2019.pdf and emailed applicant.
Plan resubmittals requested  6/6/2019 DONE
DetailsJoe Bruce
Sent ePlan case back to applicant.
Plan resubmittals received  6/5/2019 DONE
DetailsJoe Bruce
Route to Impact Fee Review6/3/20196/6/20196/4/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Routing - FIRE4/22/20194/23/20196/3/2019 FAIL
DetailsMark Scharfen
06.03.2019-Completed fire review. Uploaded rev_fire 06.03.2019.pdf and emailed applicant.
1st review completed  6/3/2019 FAIL
DetailsJoe Bruce
Fire review completed on 06-03-19. **JHB**
Plan resubmittals requested  6/3/2019 DONE
DetailsJoe Bruce
MS emailed the applicant fire review report.
Routing - PLAN CHECK4/23/2019 5/30/2019 PASS
DetailsJoe Bruce
Routing PW Environmental4/23/2019 5/2/2019 PASS
DetailsRick Christenson
Routing - Erosion and Sediment4/23/2019 4/24/2019 PASS
DetailsMichael Zawacki
Waiver approved. Concrete washout must be used and all ESC policies and BMPs followed.
Routing - Design Review4/23/2019 4/23/2019 PASS
DetailsKayCee Babb
Per CZC18-00305, to comply with all conditions of approvals.
Routing - PLANNING4/23/2019 4/23/2019 PASS
DetailsDavid Moser
See CZC18-00305
Routing PW Drainage4/23/2019 4/23/2019 PASS
DetailsBrian Murphy
Routing - Addressing4/23/2019 4/23/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS4/23/2019 4/23/2019 PASS
DetailsMorgan Webb
Intake Approval  4/22/2019 PASS
DetailsMichael Hanson
Prescreen approved/fees paid on 4/22/19
Intake Approval  4/9/2019 FAIL
DetailsMichael Hanson
This permit has failed prescreen due to the following:
1. Construction drawings must be individually uploaded with correct naming convention.
2. Missing additional pages on #310 form just the coversheet is uploaded
3. Provide Hazardous material quantity list
4. Missing fire flow letter
5. Missing planning and zoning letter of approval
Application received  3/29/2019 DONE
Application submitted via PDS Online on Mar 29 2019 11:18AM
Intake Approval  3/29/2019 FAIL
DetailsMichael Hanson
Applicant requested returned as they needed to upload additional documents.
Routing - PLAN CHECK6/19/2019    
DetailsJoe Bruce