BLD-Framing/Rough-in | 8/12/2019 | 8/13/2019 | 8/13/2019 | A | CANC |
Brandon Shaw
|
|
|
Jeff Phone #: ###-####
|
Second Notice | | 7/20/2019 | 7/15/2019 | | DONE |
|
|
|
This permit finaled on the web by Tucker Robb
|
First Notice | | 6/27/2019 | 7/10/2019 | | DONE |
|
|
|
mailed 7-11
|
BLD-Final | 6/14/2019 | 6/17/2019 | 6/17/2019 | A | PASS |
Tell Riley
|
|
|
Please call Bradden (###-####) 30 minutes prior to arrival Phone #: ###-#### Inspection requested via web by Bradden Jensen//final complete per plans.//
|
Permanent Occupancy | | | 6/17/2019 | | DONE |
|
|
|
|
FIRE-Final Inspection | 6/11/2019 | 6/14/2019 | 6/14/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
Please Call Bradden when in route. Phone #: ###-#### Inspection requested via web by Bradden Jensen
|
FIRE-Final Inspection | 6/6/2019 | 6/6/2019 | 6/6/2019 | P | FAIL |
Troy Cobbley
|
|
|
Provide sprinkler modifications due to pendant head overspacing due to new wall. Provide annual inspection tag on the fire extinguisher.
Please call Bradden when on the way. Phone #: ###-#### Inspection requested via web by Tucker Robb
|
Plan assigned to (M_H) | 5/8/2019 | | 5/13/2019 | | DONE |
Michael Hanson
|
|
|
Plan Mod Franz bakery TI e ePlan
|
Routing - PLAN CHECK | 5/9/2019 | | 5/13/2019 | | PASS |
Michael Hanson
|
|
|
1 HOUR PLAN MOD FEE
|
Permit Ready to Issue | | | 5/13/2019 | | DONE |
|
|
|
plan mod so please do not re issue-per the app-no valuation change so only fees due are hourly plan mod fees
|
CHANGE STATUS TO (ISS) | | | 5/13/2019 | | DONE |
|
|
|
|
BLD-Wall cover | 5/8/2019 | 5/9/2019 | 5/9/2019 | P | PASS |
Jim Sly
|
|
|
Please call Bradden Jensen in advance when inspector is heading to jobsite. Phone #: ###-#### Inspection requested via web by Tucker Robb
|
BLD-Framing/Rough-in | 5/8/2019 | 5/9/2019 | 5/9/2019 | P | PASS |
Jim Sly
|
|
|
Please call Bradden Jensen in advance when inspector is heading to jobsite. Phone #: ###-#### Inspection requested via web by Tucker Robb
|
Plan Modification Accepted | | | 5/8/2019 | | DONE |
|
|
|
plan mod accepted in e plan-modifying a wall-sheet A-2.0-assigned to M_H--no change in the valuation
|
BLD-Conference | 5/3/2019 | 5/6/2019 | 5/6/2019 | A | DONE |
Jim Sly
|
|
|
as early as possible // Lyle Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/3/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/3/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 5/1/2019 | 5/4/2019 | 5/2/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 5/1/2019 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 5/1/2019 | | DONE |
|
|
|
MET GWALKER@ADPBOISE.COM
Need GC
Need rev cert of val
please make sure PWK has signed off on the plan review
|
Plan assigned to (M_H) | 4/15/2019 | | 5/1/2019 | | DONE |
Michael Hanson
|
|
|
05/02 #518 L2 ePlan - Franz TI
|
Routing - PLAN CHECK | 4/15/2019 | | 5/1/2019 | | PASS |
Michael Hanson
|
|
|
|
Routing - FIRE | 4/15/2019 | 4/15/2019 | 4/24/2019 | | PASS |
Mark Scharfen
|
|
|
IFC review complete. No report needed. Passed review.
|
Routing - Addressing | 4/15/2019 | | 4/16/2019 | | PASS |
Doug Chausow
|
|
|
Ste 106
|
Routing - PUBLIC WORKS | 4/15/2019 | | 4/16/2019 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 4/15/2019 | | PASS |
Joe Bruce
|
|
|
Prescreen approved by JHB
|
Intake Approval | | | 4/2/2019 | | FAIL |
Joe Bruce
|
|
|
1) Since food product is being stored we will need the following from the health department: Provide Central District Health Department signed copy of floor plan with approval. If no CDHD is required, please upload a copy of an email stating that "No Review Required."
|
Application received | | | 3/29/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 29 2019 3:46PM
|