StatusFinaled
Name WINSPEAR CONSTRUCTION LLC
Site Address 10356 W FAIRVIEW AVE Unit: STE 106
Project NameFranz bakery TI
Customer Number 
ePlanReviewYes
Description
(FRANZ BAKERY - SUITE #106) Permit to remodel an existing 3,030 sq. ft. mercantile space in a 5,882 sqft building. This space previously occupied under BLD05-01115 (Idaho state liquor store). Approval is contingent upon adhering to the approved plans on file. Work to include: new sales counter, construction of interior non-bearing walls with double doors to separate the storage area (780 sqft) from the mercantile area (2,250 sqft). Interior finishes shall be in compliance with Ch. 8 of the 2015 IBC. This building is fully Fire Sprinkled. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Racking exceeding 8'-0" requires a seperate permit. **MDH**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in8/12/20198/13/20198/13/2019ACANC
DetailsBrandon Shaw
Jeff Phone #: ###-####
Second Notice 7/20/20197/15/2019 DONE
This permit finaled on the web by Tucker Robb
First Notice 6/27/20197/10/2019 DONE
mailed 7-11
BLD-Final6/14/20196/17/20196/17/2019APASS
DetailsTell Riley
Please call Bradden (###-####) 30 minutes prior to arrival Phone #: ###-#### Inspection requested via web by Bradden Jensen//final complete per plans.//
Permanent Occupancy  6/17/2019 DONE
FIRE-Final Inspection6/11/20196/14/20196/14/2019PPASS
DetailsTroy Cobbley
Life safety passed

Please Call Bradden when in route. Phone #: ###-#### Inspection requested via web by Bradden Jensen
FIRE-Final Inspection6/6/20196/6/20196/6/2019PFAIL
DetailsTroy Cobbley
Provide sprinkler modifications due to pendant head overspacing due to new wall. Provide annual inspection tag on the fire extinguisher.

Please call Bradden when on the way. Phone #: ###-#### Inspection requested via web by Tucker Robb
Plan assigned to (M_H)5/8/2019 5/13/2019 DONE
DetailsMichael Hanson
Plan Mod Franz bakery TI e ePlan
Routing - PLAN CHECK5/9/2019 5/13/2019 PASS
DetailsMichael Hanson
1 HOUR PLAN MOD FEE
Permit Ready to Issue  5/13/2019 DONE
plan mod so please do not re issue-per the app-no valuation change so only fees due are hourly plan mod fees
CHANGE STATUS TO (ISS)  5/13/2019 DONE
BLD-Wall cover5/8/20195/9/20195/9/2019PPASS
DetailsJim Sly
Please call Bradden Jensen in advance when inspector is heading to jobsite. Phone #: ###-#### Inspection requested via web by Tucker Robb
BLD-Framing/Rough-in5/8/20195/9/20195/9/2019PPASS
DetailsJim Sly
Please call Bradden Jensen in advance when inspector is heading to jobsite. Phone #: ###-#### Inspection requested via web by Tucker Robb
Plan Modification Accepted  5/8/2019 DONE
plan mod accepted in e plan-modifying a wall-sheet A-2.0-assigned to M_H--no change in the valuation
BLD-Conference5/3/20195/6/20195/6/2019ADONE
DetailsJim Sly
as early as possible // Lyle Phone #: ###-####
Issue PAID IN FULL permit  5/3/2019 DONE
Print Occupancy Form  5/3/2019 DONE
Route to Impact Fee Review5/1/20195/4/20195/2/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
1st review completed  5/1/2019 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  5/1/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  5/1/2019 DONE
MET GWALKER@ADPBOISE.COM
Need GC
Need rev cert of val
please make sure PWK has signed off on the plan review
Plan assigned to (M_H)4/15/2019 5/1/2019 DONE
DetailsMichael Hanson
05/02 #518 L2 ePlan - Franz TI
Routing - PLAN CHECK4/15/2019 5/1/2019 PASS
DetailsMichael Hanson
Routing - FIRE4/15/20194/15/20194/24/2019 PASS
DetailsMark Scharfen
IFC review complete. No report needed. Passed review.
Routing - Addressing4/15/2019 4/16/2019 PASS
DetailsDoug Chausow
Ste 106

Routing - PUBLIC WORKS4/15/2019 4/16/2019 PASS
DetailsAngela Hardy
Intake Approval  4/15/2019 PASS
DetailsJoe Bruce
Prescreen approved by JHB
Intake Approval  4/2/2019 FAIL
DetailsJoe Bruce
1) Since food product is being stored we will need the following from the health department: Provide Central District Health Department signed copy of floor plan with approval. If no CDHD is required, please upload a copy of an email stating that "No Review Required."
Application received  3/29/2019 DONE
Application submitted via PDS Online on Mar 29 2019 3:46PM