Meeting | | | 1/29/2020 | | DONE |
|
|
|
final values turned in 1-29-20
|
Second Notice | | 12/6/2019 | 12/30/2019 | | DONE |
|
|
|
mailed 1-1-20
|
First Notice | 11/12/2019 | 11/12/2019 | 11/26/2019 | | DONE |
Mike Jordan
|
|
|
mailed 12-2-19
|
BLD-Final | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | PASS |
Mike Jordan
|
|
|
Tony- GC will be call Fire and BLD inspector Phone #: ###-####
|
DOC - Permit Finaled | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | PASS |
Mike Jordan
|
|
|
A seperate permit will be required for occupancy.
|
FIRE-Final Inspection | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Contractor to repair the emergency light in the warehouse restroom prior to the building inspection. Tony Glenn ###-####
|
BLD-Final | 11/12/2019 | 11/12/2019 | 11/12/2019 | A | NR |
Mike Jordan
|
|
|
Tony Glenn ###-####. Needs electrical and mech finals as well as fire/life/safety.
|
BLD-Framing/Rough-in | 10/28/2019 | 10/28/2019 | 10/28/2019 | P | PASS |
Mike Jordan
|
|
|
Tony Phone #: ###-####. Demissing wall ok.
|
CHANGE STATUS TO (ISS) | | | 10/28/2019 | | DONE |
|
|
|
plan mod
|
Permit Ready to Issue | | | 10/22/2019 | | DONE |
|
|
|
Emailed additional fees to ryan@larsonarchitects.biz JCA
ALL MET-
Need (emailed jnorton@jwci.com for a new 306)
Revised Value for Plan Mod
|
Plan assigned to (M_H) | 10/11/2019 | | 10/22/2019 | | DONE |
Michael Hanson
|
|
|
Plan mod request to Add tenant and demising wall
|
Routing - PLAN CHECK | 10/14/2019 | | 10/22/2019 | | PASS |
Michael Hanson
|
|
|
2 hour plan mod fee
|
Routing - FIRE | 10/14/2019 | 10/14/2019 | 10/18/2019 | | PASS |
Erika Akin
|
|
|
10/17 (resub) Frankling Commerce Center Bldg 1, ePlan
|
BLD-Ceiling Grid Inspection | 10/16/2019 | 10/17/2019 | 10/17/2019 | A | PASS |
Mike Jordan
|
|
|
Anthony Phone #: ###-####
|
Plan Modification Accepted | | | 10/10/2019 | | DONE |
|
|
|
Plan mod request to Add tenant and demising wall. Sheets A-1, A-2 and A-3
|
BLD-Other | 9/26/2019 | 9/27/2019 | 9/27/2019 | A | PASS |
Tell Riley
|
|
|
fire wall // Tony Phone #: ###-####//all penetrations sealed//
|
BLD-Energy code compliance | 9/12/2019 | 9/13/2019 | 9/13/2019 | A | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | NH |
Mike Jordan
|
|
|
Anthony Phone #: ###-####. Arrived on site, no one on site, no access.
|
BLD-Framing/Rough-in | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | PASS |
Mike Jordan
|
|
|
Tony Phone #: ###-####. Interior steel stud framed walls and hardlids ok. Ok to insulate.
|
(F) Reprint permit | | | 7/2/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/2/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/2/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/25/2019 | | 4/25/2019 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/25/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 4/25/2019 | | DONE |
|
|
|
all met: ryan@larsonarchitects.biz
NEED GC
NEED Rev Val
|
Plan assigned to (M_H) | 4/11/2019 | | 4/25/2019 | | DONE |
Michael Hanson
|
|
|
1st review completed - 04/23 #518 L2 ePlan
|
Route to Impact Fee Review | 4/23/2019 | 4/26/2019 | 4/24/2019 | | PASS |
Karina Myles
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 4/11/2019 | | 4/23/2019 | | FAIL |
Michael Hanson
|
|
|
See changemark in ePlan for corrections required.
|
1st review completed | | | 4/23/2019 | | FAIL |
Michael Hanson
|
|
|
|
Routing - FIRE | 4/11/2019 | 4/11/2019 | 4/22/2019 | | PASS |
Mark Scharfen
|
|
|
IFC Review Complete. No report needed. Vanilla Shell. Approved.
|
Routing - MECHANICAL | 4/11/2019 | | 4/16/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 4/11/2019 | | 4/16/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Addressing | 4/11/2019 | | 4/11/2019 | | PASS |
Doug Chausow
|
|
|
Updated address: 12589 W Frankliin Rd
|
Routing - PUBLIC WORKS | 4/11/2019 | | 4/11/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Design Review | 4/11/2019 | | 4/11/2019 | | PASS |
Andrea Tuning
|
|
|
new rooftop HVAC unit
|
Intake Approval | | | 4/10/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 4/8/2019 | | FAIL |
Brian McGowan
|
|
|
Please provide the following information in order for your Prescreen to be approved;
1. Complete Form #304 with the Owner's address and phone number.
2. Sheet M0.1 Mechanical COMcheck is too large to open. Please flatten the drawing to a maximum 1mb.
3. Sheet M021 Mechanical Specs is too large to open. Please flatten the drawing to a maximum 1mb.
|
Application received | | | 4/2/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 2 2019 1:32PM
|