BLD-Final | 7/25/2019 | 7/26/2019 | 7/26/2019 | A | PASS |
Jim Storey
|
|
|
CALL AHEAD // JESIAH Phone #: ###-####
|
DOC - Permit Finaled | 7/26/2019 | 7/26/2019 | 7/26/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 7/24/2019 | 7/25/2019 | 7/25/2019 | A | FAIL |
Brandon Shaw
|
|
|
No access...
|
BLD-Ceiling Grid Inspection | 7/23/2019 | 7/24/2019 | 7/24/2019 | A | NH |
Jim Storey
|
|
|
Josiah Phone #: 2###-#### no access. very strange phone #
|
BLD-Final | 7/19/2019 | 7/22/2019 | 7/22/2019 | A | NR |
Brandon Shaw
|
|
|
Need MECH final...
|
BLD-Final | 7/19/2019 | 7/19/2019 | 7/19/2019 | P | DEFR |
Jim Storey
|
|
|
Call for Access- Jesiah Phone #: ###-#### out of time
|
BLD-Framing/Rough-in | 6/19/2019 | 6/20/2019 | 6/20/2019 | A | PASS |
Jim Storey
|
|
|
JOESIAH Phone #: ###-####
|
BLD-Conference | 6/14/2019 | 6/18/2019 | 6/18/2019 | A | PASS |
Jim Storey
|
|
|
Josiah Phone #: ###-####
|
BLD-Concrete | 5/16/2019 | 5/17/2019 | 5/17/2019 | A | PASS |
Jim Storey
|
|
|
josiah Phone #: ###-####
|
BLD-Footing | 5/15/2019 | 5/16/2019 | 5/16/2019 | A | PART |
Mike Jordan
|
|
|
later in the morning // JOSIAH Phone #: ###-####
|
Routing Walk-In (BLD) | 4/11/2019 | 4/11/2019 | 4/11/2019 | P | PASS |
Jenny Nelson
|
|
|
|
Inspection Record Card- Bld | | | 4/11/2019 | | DONE |
Jenny Nelson
|
|
|
|
Case Summary (BLD) | | | 4/11/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/11/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 4/11/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/11/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 4/10/2019 | 4/10/2019 | 4/10/2019 | P | FAIL |
Josh Bogle
|
|
|
Did not bring all his paper work
|
Routing - PLAN CHECK | 4/10/2019 | | 4/10/2019 | | FAIL |
Brian McGowan
|
|
|
Did not bring all his paper work
|
Routing Walk-In (Zoning) | 4/2/2019 | 4/2/2019 | 4/2/2019 | P | PASS |
Ethan Mansfield
|
|
|
|
Routing Walk-In (BLD) | 4/2/2019 | 4/2/2019 | 4/2/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/2/2019 | | 4/2/2019 | | FAIL |
Josh Bogle
|
|
|
plans lacked structural details
|
1st review completed | | | 4/2/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 4/2/2019 | | | |
|
|
|
|