BLD-Final | 6/24/2020 | 6/25/2020 | 6/25/2020 | A | PASS |
Tony Young
|
|
|
screened // Clint Phone #: ###-####
|
DOC - Permit Finaled | 6/25/2020 | 6/25/2020 | 6/25/2020 | P | PASS |
Tony Young
|
|
|
c of o issued
|
PubWorks Occupancy Approval | 6/24/2020 | 6/24/2020 | 6/24/2020 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
|
BLD-Aging Inspection | 5/27/2020 | 5/27/2020 | 6/3/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 5/26/2020 | 5/26/2020 | 5/27/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Energy code compliance | 1/13/2020 | 1/13/2020 | 1/13/2020 | P | PASS |
Tony Young
|
|
|
Jeremy Phone #: ###-####
|
BLD-Framing/Rough-in | 1/6/2020 | 1/6/2020 | 1/6/2020 | P | PASS |
Tony Young
|
|
|
Luke Phone #: ###-####
|
BLD-Framing/Rough-in | 1/3/2020 | 1/6/2020 | 1/6/2020 | A | DEFR |
Tony Young
|
|
|
Luke Phone #: ###-####, defr to pm
|
BLD-Framing/Rough-in | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | NR |
Tony Young
|
|
|
Luke Phone #: ###-####
|
BLD-Conference | 1/2/2020 | 1/3/2020 | 1/3/2020 | A | PART |
Tony Young
|
|
|
Luke Phone #: ###-####,, frame ?s
|
BLD-Framing/Rough-in | 1/2/2020 | 1/2/2020 | 1/2/2020 | P | NR |
Tony Young
|
|
|
Luke Phone #: ###-####,,mostly done but still corrections needed,, will set up a conference
|
BLD-Framing/Rough-in | 12/24/2019 | 12/26/2019 | 12/26/2019 | A | FAIL |
Tony Young
|
|
|
Luke Phone #: ###-####// frame walk through only,, will need truss fixes also on missing plate,, possible backwards foor trusses
|
BLD-Framing/Rough-in | 12/23/2019 | 12/24/2019 | 12/24/2019 | A | PART |
Tony Young
|
|
|
jeremy Phone #: ###-####,, frame not ready,, soffits are work in progress,, ok
|
BLD-Other | 12/19/2019 | 12/20/2019 | 12/20/2019 | A | NR |
Mike Jordan
|
|
|
Jeremy Phone #: ###-####// soffit. No soffit material on site or being installed.
|
BLD-Wall cover | 12/18/2019 | 12/19/2019 | 12/19/2019 | A | NR |
Tony Young
|
|
|
Jeremy Phone #: ###-####// soffit material not on site yet
|
BLD-Conference | 11/13/2019 | 11/14/2019 | 11/14/2019 | A | PEND |
Tony Young
|
|
|
Luke Phone #: ###-####,, cut back garage doors,, need to verify with engineer on hold downs and shear
|
BLD-Framing/Rough-in | 10/25/2019 | 10/28/2019 | 10/28/2019 | A | NR |
Tell Riley
|
|
|
call half hour before // John Phone #: ###-####//wanted to do walk through prior to trades rough ins//discussed some issues an noted areas to double check prior to framing inspection//framing inspection will need to be completed after rough ins are inspected and passed//still need engineering fix for garage door areas where hold downs were removed//
|
BLD-Framing/Rough-in | 10/25/2019 | 10/25/2019 | 10/25/2019 | P | DEFR |
Jim Storey
|
|
|
call half hour before // John Phone #: ###-####//out of time
|
BLD-Wall Bracing | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | PART |
Tell Riley
|
|
|
shear // John Phone #: ###-####//shear nailing exterior ok//will need engineer to provide fix for missed hold downs at garage and front wall//interior shear walls were not complete at inspection//ok to wrap house when 2nd level straps and nails added as discussed//
|
BLD-Other | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | PASS |
Tony Young
|
|
|
under floor - Nathan Phone #: ###-####
|
BLD-Foundation | 6/24/2019 | 6/24/2019 | 6/24/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 6/17/2019 | 6/17/2019 | 6/17/2019 | P | PASS |
Tony Young
|
|
|
Nick Phone #: ###-####
|
PubWorks Subgrade Approval | 6/7/2019 | 6/7/2019 | 6/7/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 5/14/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 5/3/2019 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/3/2019 | | DONE |
|
|
|
|
Telephone call | | | 5/3/2019 | | DONE |
|
|
|
spoke with clint informing him that this permit is ready and the fee amount due for issuance
|
Print Occupancy Form | | | 5/3/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/3/2019 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 5/2/2019 | | 5/2/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.
All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call ###-#### for an inspection.
|
Routing - PUBLIC WORKS | 5/2/2019 | | 5/2/2019 | | PASS |
Angela Hardy
|
|
|
|
Plan Reviewer's activity | | | 5/2/2019 | | |
Rob Patrick
|
|
|
Delivered entire dwg package to Andy for his review for Resp. Person.
|
Routing - Erosion and Sediment | 5/2/2019 | | 5/2/2019 | | PASS |
Andy J. Long
|
|
|
Certified RP now assigned to project. ESC plan approved. Site preparation inspection is required
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/2/2019 | | DONE |
|
|
|
|
Routing - MECHANICAL | 4/26/2019 | | 4/26/2019 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 4/25/2019 | | DONE |
|
|
|
Resubmittals received 3 sets of sheets L-1.2 & 2 material testing -took to PDP
|
Plan Reviewer's activity | | | 4/25/2019 | | |
Rob Patrick
|
|
|
Took resubmitted Grading Plans to Melissa.
|
Plan assigned to (RDP) | 4/11/2019 | 4/11/2019 | 4/24/2019 | | DONE |
Rob Patrick
|
|
|
4/30 sfd L2 PAPER...1st Complete (Passed) waiting for other departments to pass.
|
Routing - PLAN CHECK | | | 4/24/2019 | | PASS |
Rob Patrick
|
|
|
Holding for resubmittal for other departments comments
|
1st review completed | | | 4/24/2019 | | DONE |
Rob Patrick
|
|
|
|
Routing - FIRE | 4/23/2019 | 4/23/2019 | 4/23/2019 | | PASS |
Lee G Meredith
|
|
|
New fire flow report from SUEZ and new access measurements both meet code requirements. No sprinklers required.
|
Routing - MECHANICAL | | | 4/23/2019 | | FAIL |
Troy James
|
|
|
Emailed corrections to heating supply
|
Routing - PLANNING | 4/23/2019 | | 4/23/2019 | | PASS |
Sue Cummings
|
|
|
|
Routing - FIRE | | | 4/18/2019 | | FAIL |
Lee G Meredith
|
|
|
04/30 1760 W Silver Crest Residential Review
Exceeds access distance and fire flow availability not provided.
|
Routing - Erosion and Sediment | 4/16/2019 | | 4/17/2019 | | FAIL |
Andy J. Long
|
|
|
RP listed on applications is not associated with project. Need to designate a certified Responsible Person with current training and has operational control at the site, like the General Contractor. False information on permits is a violation.
|
Routing PW Grading-Hillside | 4/12/2019 | | 4/16/2019 | | FAIL |
Melissa Jannusch
|
|
|
Revisions requested
|
Route to Impact Fee Review | 4/11/2019 | 4/14/2019 | 4/12/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 4/11/2019 | | 4/12/2019 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 4/11/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/11/2019 | | DONE |
|
|
|
|
Intake Approval | | | 4/3/2019 | | FAIL |
|
|
|
NEED
2 Copies of GEO (per M)
3 Copies of Grading and Drainage (per M)
Site Suitanility Letter based on G & D Plans from MTI (per M)
Need second copy of all documents
Checklist needs to be full filled out (page number/letters not marked)
|
Application received | | 4/3/2019 | | | |
|
|
|
|
Routing - PUBLIC WORKS | | | | | FAIL |
|
|
|
|