BLD-Final | 7/15/2019 | 7/16/2019 | 7/16/2019 | A | PASS |
Brandon Shaw
|
|
|
Zach Phone #: ###-####
|
DOC - Permit Finaled | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 6/4/2019 | 6/4/2019 | 6/4/2019 | P | PASS |
Dave Hannah
|
|
|
zack Phone #: ###-####
|
BLD-Framing/Rough-in | 5/29/2019 | 5/29/2019 | 5/29/2019 | P | PASS |
Brandon Shaw
|
|
|
OK to insulate...
|
BLD-Wall Bracing | 5/20/2019 | 5/20/2019 | 5/20/2019 | P | PASS |
Brandon Shaw
|
|
|
Zack Phone #: ###-####
|
BLD-Footing | 5/20/2019 | 5/20/2019 | 5/20/2019 | P | DEFR |
Brandon Shaw
|
|
|
Geo soil subgrade approved by PW.
|
PubWorks Subgrade Approval | 5/20/2019 | 5/20/2019 | 5/20/2019 | | DONE |
Melissa Jannusch
|
|
|
ADDITION A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Wall Bracing | 5/16/2019 | 5/17/2019 | 5/17/2019 | P | FAIL |
Brandon Shaw
|
|
|
Need Soil subgrade inspection have been submitted and approved by Public Works...
|
BLD-Foundation | 4/26/2019 | 4/29/2019 | 4/30/2019 | A | PASS |
Dave Hannah
|
|
|
steam wall // Zach Phone #: ###-####
|
BLD-Footing | 4/25/2019 | 4/25/2019 | 4/25/2019 | P | FAIL |
Brandon Shaw
|
|
|
Need soil subgrade submitted and approved by PW...
|
BLD-Conference | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | DONE |
Brandon Shaw
|
|
|
Zack Phone #: ###-####
|
OVERRIDE | | | 4/18/2019 | | |
|
|
|
|
Routing Walk-In (BLD) | 4/18/2019 | 4/18/2019 | 4/18/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing PW Grading-Hillside | 4/18/2019 | | 4/18/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.
|
Routing - PLAN CHECK | 4/18/2019 | | 4/18/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 4/18/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/18/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 4/18/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/18/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 4/3/2019 | 4/3/2019 | 4/3/2019 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 4/3/2019 | 4/3/2019 | 4/3/2019 | A | FAIL |
Josh Bogle
|
|
|
plans lacked information
|
Routing - PLAN CHECK | 4/3/2019 | | 4/3/2019 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 4/3/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 4/3/2019 | | | |
|
|
|
|