Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-01068
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 6140 W CURTISIAN AVE Unit: FL 3
Project NameSt. Al's - EP Lab - 3rd story
Customer Number 
ePlanReviewYes
Description
(ST. ALPHONSUS REGIONAL MEDICAL CENTER – EP LAB – MOB #6 – 3RD STORY) (DRH20-00109) (4-16-20 PLAN MODIFICATION TO ROUTE SUPPLY AND RETURN DUCTWORK AND REFRIGERANT PIPING FROM THE 3RD STORY ON THE EXTERIOR OF THE BUILDING TO THE ROOF TOP HVAC UNIT. THE DUCTS WILL BE SCREENED BY A DUCT CHASE THAT MATCHES THE EXISTING BUILDING FINISHES. WORK IS TO INCLUDE REMOVING THE EXISTING EIFS AT THE LOCATION OF THE NEW DUCT CHASE, CONSTRUCTING A STEEL STUD WITH GYPSUM SHEATHING CHASE TO ENCLOSE THE NEW DUCTS (SIDES AND BOTTOM) SUPPORTED BY HORIZONTAL STEEL “W” BEAM OUTRIGGERS WITH PERPENDICULAR STEEL “C” CHANNEL BEAMS, INSTALLING NEW DRAINABLE EIFS FOR THE EXTERIOR FINISH OF THE DUCT CHASE, INSTALLING A NEW METAL ROOF COVERING OVER THE ROOF DECK OF THE DUCT CHASE, CONSTRUCTING A NEW SCREEN WALL ON THE ROOF, AND INSTALLING NEW INSULATED DUCTS. SPECIAL INSPECTION FOR ANCHORS POST-INSTALLED IN HARDENED MASONRY AND FOR WELDING.) The fire sprinkler system is used to allow an Ambulatory Care Facility within this building. To remodel a 2,176 square foot area located on the 3rd story of an existing medical office building. The existing Ambulatory Care Facility will be expanded to include a new 1,262 square foot EP lab that is located within the remodel area. After the expansion, the Ambulatory Care facility will have a total floor area of about 5,529 square feet and will be separated from the rest of the story by a minimum 1-hr fire partition/smoke barrier. This permit is intended to establish a Certificate of Occupancy for the 1,262 square foot EP lab only within the expanded Ambulatory Care Facility. Work is to include interior nonbearing walls with adhered lead sheet gypsum board, a staff toilet room accessible to the disabled, a staff changing room accessible to the disabled, a staff dressing/locker room accessible to the disabled, 1-hr fire partitions, 1-hr smoke barrier walls and floors, a lead shielded sliding door, side-hinged lead shielded swinging doors, side-hinged swinging doors, interior leaded windows, a 2-hr mechanical shaft from the 3rd story through the 4th story, a new roof top HVAC unit, a suspended Unistrut grid for supporting overhead equipment, suspended acoustical ceilings, a suspended gypsum board ceiling, medical equipment, new medical gas piping in the pedestrian walkway from the main hospital, millwork, and finishes. Special Inspection is required for welding, bolting, and for post-installed anchors in hardened concrete. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 7/26/20208/11/2020 DONE
MAILED 8-14-2020
Permanent Occupancy  7/16/2020 DONE
BLD-Final7/13/20207/14/20207/14/2020APASS
DetailsMike Jordan
SCREENED // Cecil Phone #: ###-####. . Ok for perm occ.
FIRE-Final Inspection6/29/20206/30/20206/30/2020APASS
DetailsTroy Cobbley
Life safety, fire alarm and fire sprinkler passed.

screened // cecil Phone #: ###-####
FIRE-Final Inspection6/18/20206/19/20206/19/2020AFAIL
DetailsTroy Cobbley
Need project related fire alarm done prior to a life safety.

Screened- Cezal Phone #: ###-####
BLD-Ceiling Grid Inspection6/11/20206/12/20206/12/2020APASS
DetailsMike Jordan
Screened- Pezil Phone #: ###-####
BLD-Framing/Rough-in6/2/20206/2/20206/2/2020PPASS
DetailsMike Jordan
screened // Cecil Phone #: ###-####
CHANGE STATUS TO (ISS)  4/20/2020 DONE
Plan assigned to (CJW)3/20/20203/20/20204/16/2020 PASS
DetailsCarl Westfall
plan mod - St. Als - MOB #6 - exterior ducts (need to know time from KPFF)
Routing - PLAN CHECK4/15/2020 4/16/2020 PASS
DetailsCarl Westfall
Plan Reviewer's activity  4/16/2020 PASS
Plan mod review approved
Permit Ready to Issue  4/16/2020 DONE
PLAN MOD MET
Plan resubmittals received  4/15/2020 DONE
Plan resubmittals requested  4/13/2020 DONE
Routing Off Site - STRUCTURAL3/25/2020 4/10/2020 PASS
DetailsCarl Westfall
Cory Harelson (KPFF)
Routing - Design Review3/25/2020 3/26/2020 PASS
DetailsKayCee Babb
Per DRH20-00109
Routing - FIRE3/25/20203/25/20203/25/2020 PASS
DetailsMark Stumbaugh
No review needed Plan Mod for Mark Stumbaugh
Routing - PLANNING3/25/2020 3/25/2020 PASS
DetailsJeff Lowe
this is reviewed under DRH20-00109
Routing - PLAN CHECK3/24/2020 3/25/2020 PEND
DetailsCarl Westfall
Routed drawings
Routing - MECHANICAL3/25/2020 3/25/2020 PASS
DetailsTroy James
Routing - PLAN CHECK3/20/2020 3/23/2020 FAIL
DetailsCarl Westfall
Plan intake review approved. IBC plan review failed. Approved roof sheathing required
Plan Modification Accepted  3/20/2020 DONE
Aurora with Lombard Conrad Arch. Opening up for plan modification. Plan Mod does not affect value of work being done.

See email in documents.
FIRE-Conference2/4/20202/4/20202/4/2020PDONE
DetailsTroy Cobbley
Life safety passed for Storage Room 309.

Cecil Phone #: ###-####
BLD-Framing/Rough-in11/14/201911/15/201911/15/2019APASS
DetailsMike Jordan
Cecil Phone #: ###-####
BLD-Framing/Rough-in10/1/201910/2/201910/2/2019APASS
DetailsMike Jordan
Cecel Phone #: ###-####. Pre rock on 2hr. fire wall at soffit.
Print Occupancy Form  9/27/2019 DONE
Issue PAID IN FULL permit  9/27/2019 DONE
Plan assigned to (CJW)7/30/20198/21/20199/25/2019 PASS
DetailsCarl Westfall
(1st done) 08/14/19 (L-3 - 15 days) (eplan - 40 sheets) St Al's - EP Lab (waiting for fire)
PLANS/APPL TAKEN TO FRONT DESK  9/25/2019 DONE
Permit Ready to Issue  9/25/2019 DONE
MET BBYINGTON@KREIZENBECK.COM
Need
GC Form
Revsied Cert of Value
Routing - FIRE9/17/20199/17/20199/24/2019 PASS
DetailsMark Stumbaugh
09/23 (resubmittal) SARMC EP Lab, ePlan
Routing Off Site - STRUCTURAL9/17/2019 9/23/2019 PASS
DetailsCarl Westfall
Cory Harelson (KPFF)
Routing - PLAN CHECK9/16/2019 9/18/2019 PASS
DetailsCarl Westfall
Passed pending structural. Received the Emailed drawings from the applicant and uploaded them. Started the routing to other agencies.
Telephone call  9/17/2019 DONE
Called the Applicant. Explained what needed to be seen on the drawings. Told her to Email the revised drawings to me and I would upload them.
Plan resubmittals received  9/16/2019 DONE
Routing - PLAN CHECK9/3/2019 9/4/2019 FAIL
DetailsCarl Westfall
Failed the resubmittal plan intake review. Routed back to the applicant.
Route to Impact Fee Review8/23/20198/26/20198/26/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE7/30/20197/30/20198/23/2019 FAIL
DetailsMark Scharfen
08/23-SARMC EP Lab 520 review complete. Uploade and emailed architect rev_fire 08.23.2019.pdf
1st review completed  8/23/2019 DONE
Time frame was not met because Fire did not get their review done in time.
Plan resubmittals requested  8/23/2019 DONE
Routing PW Environmental7/31/2019 8/14/2019 PASS
DetailsRick Christenson
Routing - PLAN CHECK7/30/2019 8/13/2019 FAIL
DetailsCarl Westfall
Routing Off Site - STRUCTURAL7/30/2019 8/12/2019 FAIL
DetailsCarl Westfall
Cory Harelson (KPFF)
Routing - MECHANICAL7/30/2019 8/5/2019 PASS
DetailsTroy James
Routing - Addressing7/30/2019 8/2/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS7/30/2019 7/31/2019 PASS
DetailsAngela Hardy
Routing - PLUMBING7/30/2019 7/31/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC and NFPA 99
Routing - PLANNING7/30/2019 7/31/2019 PASS
DetailsStephanie Leonard
Intake Approval  7/25/2019 PASS
Application received  4/3/2019 DONE
Application submitted via PDS Online on Apr 3 2019 4:16PM
Second Notice 8/21/2020