BLD-Final | 7/2/2019 | 7/3/2019 | 7/3/2019 | A | PASS |
Dave Hannah
|
|
|
Dan Phone #: ###-####
|
DOC - Permit Finaled | 7/3/2019 | 7/3/2019 | 7/3/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 5/22/2019 | 5/23/2019 | 5/23/2019 | P | PASS |
Tony Young
|
|
|
Dan Phone #: ###-####
|
BLD-Framing/Rough-in | 5/21/2019 | 5/21/2019 | 5/21/2019 | P | PART |
Tony Young
|
|
|
Dan Phone #: ###-####,, ok to insulate office,, need to verify seal pack at energy code
|
BLD-Conference | 5/3/2019 | 5/6/2019 | 5/6/2019 | A | PASS |
Tony Young
|
|
|
Dan Phone #: ###-####,, general ?s,, ok
|
BLD-Conference | 4/18/2019 | 4/22/2019 | 4/22/2019 | A | DONE |
Tony Young
|
|
|
inpection cancel due to a customers emergency//Dan Phone #: ###-####
|
Routing Walk-In (BLD) | 4/5/2019 | 4/5/2019 | 4/5/2019 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 4/4/2019 | 4/4/2019 | 4/5/2019 | | PASS |
Josh Bogle
|
|
|
4/10 addition, paper - 1st done
|
Routing - PLAN CHECK | 4/5/2019 | | 4/5/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 4/5/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/5/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/5/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 4/5/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/5/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 4/4/2019 | 4/4/2019 | 4/4/2019 | A | PASS |
KayCee Babb
|
|
|
Hillside- trying to locate Melissa or Jason for prescreen.
Planning passed.
|
Routing Walk-In (BLD) | 4/4/2019 | 4/4/2019 | 4/4/2019 | A | FAIL |
Josh Bogle
|
|
|
took in as a level two pending receipt of ES report for spray foam
|
Routing - PLAN CHECK | 4/4/2019 | | 4/4/2019 | | FAIL |
Josh Bogle
|
|
|
ES report required for spray foam
|
1st review completed | | | 4/4/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 4/4/2019 | | | |
|
|
|
|