Second Notice | | 9/29/2019 | 9/26/2019 | | DONE |
|
|
|
This permit finaled on the web by Michele Rodgers
|
First Notice | 9/4/2019 | 9/4/2019 | 9/19/2019 | | DONE |
Tony Young
|
|
|
mailed 9-20-19
|
BLD-Final | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | PASS |
Tony Young
|
|
|
building final inspection please call 30 minutes ahead so I can meet you at the site. Mike Teeter ###-####
thanks Mike Phone #: ###-#### Inspection requested via web by Mike Teeter
|
DOC - Permit Finaled | 9/4/2019 | 9/4/2019 | 9/4/2019 | P | PASS |
Tony Young
|
|
|
|
FIRE-Final Inspection | 9/4/2019 | 9/4/2019 | 9/4/2019 | P | PASS |
Jim Page
|
|
|
No fire sprinkler modifications, no fire alarm modifications, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for are of work complete.
per 415
|
BLD-Final | 8/28/2019 | 8/29/2019 | 8/29/2019 | P | PEND |
Tony Young
|
|
|
if you could please call 30 minutes ahead of time for the inspection that would be greatly appreciated Mike Teeter ###-####
Thanks Mike Teeter Phone #: ###-#### Inspection requested via web by Mike Teeter
|
BLD-Final | 8/27/2019 | 8/28/2019 | 8/28/2019 | A | PEND |
Tony Young
|
|
|
if you could please call 30 minutes ahead of time for the inspection that would be greatly appreciated Mike Teeter ###-####
Thanks Mike Teeter Phone #: ###-#### Inspection requested via web by Mike Teeter,, needs trades, final letter from engineer
|
BLD-Other | 6/18/2019 | 6/18/2019 | 6/19/2019 | P | PART |
Tony Young
|
|
|
Tom- shear nail front tower on roof Phone #: ###-####,, pending special inspection
|
BLD-Wall cover | 6/17/2019 | 6/17/2019 | 6/18/2019 | P | PART |
Tony Young
|
|
|
nails on roof // Tom Phone #: ###-####,, hold down straps,, lower roof sheathing ok
|
BLD-Wall cover | 6/13/2019 | 6/14/2019 | 6/14/2019 | A | PART |
Tony Young
|
|
|
shear nailing, exterior right tower // Tom Phone #: ###-####,, work in progress.. ok
|
BLD-Framing/Rough-in | 6/12/2019 | 6/13/2019 | 6/13/2019 | A | PART |
Tony Young
|
|
|
Tom Phone #: ###-####,, front facia framing on east side ok,, work in progress,, also will have special inspection
|
BLD-Framing/Rough-in | 5/28/2019 | 5/29/2019 | 5/30/2019 | P | PART |
Tony Young
|
|
|
Tom Phone #: ###-####,, front area for sign,, special inspector on site,, pending report
|
Issue PAID IN FULL permit | | | 5/9/2019 | | DONE |
|
|
|
emailed michele@mjtconstruction.com to sign permit
|
Inspection Record Card- Bld | | | 5/9/2019 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 4/11/2019 | 4/11/2019 | 5/8/2019 | | PASS |
Joe Bruce
|
|
|
05/07 (2nd Rev) 04/23 (L2) Albertsons ePlan (Bldg, Fire, DR)
|
Routing Off Site - STRUCTURAL | 5/1/2019 | | 5/8/2019 | | PASS |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/8/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/8/2019 | | DONE |
|
|
|
Need GC-met
Need Rev Val-met
|
Routing - PLAN CHECK | 5/1/2019 | | 5/7/2019 | | PASS |
Joe Bruce
|
|
|
|
Routing - Design Review | 5/1/2019 | | 5/2/2019 | | PASS |
KayCee Babb
|
|
|
Per DRH19-00089 and sheets A0.1 and A3.2 submitted April 30, 2019. To comply with all conditions of approval and redlines, including providing 14 bicycle parking stalls on site.
|
Plan resubmittals received | | | 5/1/2019 | | DONE |
Joe Bruce
|
|
|
|
Route to Impact Fee Review | 4/23/2019 | 4/26/2019 | 4/24/2019 | | PASS |
Karina Myles
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 4/11/2019 | 4/11/2019 | 4/23/2019 | | PASS |
Mark Scharfen
|
|
|
IFC Review complete 04.23.2019. No report needed.
|
1st review completed | | | 4/23/2019 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 4/23/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 4/11/2019 | | 4/23/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing Off Site - STRUCTURAL | 4/11/2019 | | 4/22/2019 | | FAIL |
Joe Bruce
|
|
|
ahj
|
Routing - MECHANICAL | 4/11/2019 | | 4/11/2019 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 4/11/2019 | | 4/11/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/11/2019 | | 4/11/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Design Review | 4/11/2019 | | 4/11/2019 | | FAIL |
KayCee Babb
|
|
|
Project shall comply with all conditions of approval associated with DRH19-00089, including: painted crosswalks shall be the full width of the curb ramps and enter the parking lot aisle at a perpendicular manner, not angled - pathway through the landscape terminal may be used in addition to required crosswalk; show bicycle parking on site plan that meets dimensional standards; both entries require a minimum 3' canopy or recessed entry - clearly indicate on site plan the depth of the canopy over the western most entry.
|
Intake Approval | | | 4/10/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 4/5/2019 | | FAIL |
Joe Bruce
|
|
|
1) Plan sheet, A3.2 do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block. Verify ALL plan sheets have the required space for city approval stamp.
2) The incorrect mechanical code is listed on the "Project Information" - See sheet G0.1. The city of Boise has adopted the 2012 International Mechanical Code. Please revise the drawings to reflect the updated code.
3) The building type III-N is not an applicable construction type within the 2015 International Building Code. Please classify the construction type of the building that aligns with the 2015 IBC.
4) Sheet S0.1 "Special Inspection" drawing states the incorrect building code and code references in Chapter 17. The City of Boise has adopted the 2015 International Building Code. Please update the referenced code sections on this sheet and utilize the 2015 IBC for special inspections.
|
Application received | | | 4/4/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 4 2019 10:56AM
|