BLD-Final | 12/3/2019 | 12/5/2019 | 12/5/2019 | A | PASS |
Brandon Shaw
|
|
|
garage key code 3283 Phone #: ###-#### Inspection requested via web by David Wipper
|
DOC - Permit Finaled | 12/5/2019 | 12/5/2019 | 12/5/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 12/5/2019 | 12/5/2019 | 12/5/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 3.33
|
PubWorks Occupancy Approval | 12/3/2019 | 12/3/2019 | 12/3/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Other | 10/10/2019 | 10/10/2019 | 10/10/2019 | P | PASS |
Brandon Shaw
|
|
|
Larry- soffit inspection Phone #: ###-####
|
BLD-Other | 9/26/2019 | 9/26/2019 | 9/26/2019 | P | FAIL |
Brandon Shaw
|
|
|
As per plans- 5/8 type X and hardyboard to be used at all soffits and under front deck...
|
BLD-Energy code compliance | 9/17/2019 | 9/18/2019 | 9/18/2019 | P | PASS |
Brandon Shaw
|
|
|
See FIR19-00506 for sprinkler cover approval... Ok to cover...
|
BLD-Framing/Rough-in | 9/13/2019 | 9/16/2019 | 9/16/2019 | P | PEND |
Brandon Shaw
|
|
|
Corrections are SAT... OK to insulate, Pending Fire Sprinkler Pressure re-test...
|
BLD-Framing/Rough-in | 9/11/2019 | 9/12/2019 | 9/12/2019 | P | FAIL |
Brandon Shaw
|
|
|
Per plans- 6x6 DF #1 posts to bear down to foundation, supporting glue lam at garage... Per shear inspections walk thru, #3 shear walls to be blocked... Per plans- Stairway header to be (2)1.75x 18" LvL Provide Engineering for as built... Per plans- 2x Ledger to be attached with (2) 1/4x 4 1/2" SDS screws...
|
BLD-Wall Bracing | 8/23/2019 | 8/26/2019 | 8/26/2019 | A | PASS |
Brandon Shaw
|
|
|
Larry Phone #: ###-####
|
BLD-Foundation | 7/2/2019 | 7/3/2019 | 7/3/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | PART |
Tony Young
|
|
|
Late inspection will be good. want to pour in the morning Phone #: ###-#### Inspection requested via web by Ben Sears,, work in progress,, ok
|
PubWorks Subgrade Approval | 6/25/2019 | 6/25/2019 | 6/25/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 6/12/2019 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/12/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/12/2019 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 6/4/2019 | | 6/12/2019 | | DONE |
Michael Hanson
|
|
|
1st review completed - 05/30 sfd L2 ePlan - See hillside comments in ePlan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/12/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 6/12/2019 | | DONE |
|
|
|
Met
|
Routing PW Grading-Hillside | 6/11/2019 | | 6/11/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
1st review completed | | | 6/5/2019 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required.
|
Routing - PLAN CHECK | 5/13/2019 | | 6/5/2019 | | PASS |
Michael Hanson
|
|
|
|
Plan assigned to (RDP) | 5/13/2019 | 5/13/2019 | 6/4/2019 | | DEFR |
Rob Patrick
|
|
|
05/30 sfd L2 ePlan
|
Routing - MECHANICAL | 5/13/2019 | | 5/15/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Route to Impact Fee Review | 5/13/2019 | 5/16/2019 | 5/14/2019 | | PASS |
Karina Myles
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 5/13/2019 | 5/13/2019 | 5/14/2019 | | PASS |
Lee G Meredith
|
|
|
An NFPA 13D sprinkler system is required per PUD12-00016, as noted on the Site Plan.
|
Routing PW Grading-Hillside | 5/13/2019 | | 5/14/2019 | | FAIL |
Melissa Jannusch
|
|
|
Provide engineering for a 7 foot wall
|
Routing - Erosion and Sediment | 5/13/2019 | | 5/14/2019 | | PASS |
Michael Zawacki
|
|
|
Foothills lot, site prep inspection required.
|
Routing - PLANNING | 5/13/2019 | | 5/14/2019 | | PASS |
Brent Moore
|
|
|
|
Routing - Addressing | 5/13/2019 | | 5/14/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 5/13/2019 | | 5/13/2019 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/13/2019 | | DONE |
|
|
|
|
Intake Approval | | | 5/13/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/13/2019 | | DONE |
|
|
|
|
Application received | | | 4/6/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 6 2019 11:50AM
|