Permit Information
Permit NumberBLD19-01106
StatusFinaled
Name AURIC SOLAR
Site Address 6240 W BUTTE ST
Project Name176972-Harrington PV
Customer Number 
ePlanReviewYes
Description
Permit for 175sq' of roof-mounted, grid-tied Photo-voltaic panels with micro-inverters; 10 panels in 1 array. There will be collar-tie work to strengthen the existing roof structure per engineer’s roof evaluation. All racking, modules, and other listed equipment must be installed by a certified installer. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/17/20195/17/20195/17/2019APASS
DetailsJim Sly
Homeowner will be home to give access if needed. Phone #: ###-#### Inspection requested via web by Rob Maes
DOC - Permit Finaled5/17/20195/17/20195/17/2019PPASS
DetailsJim Sly
BLD-Final5/14/20195/17/20195/17/2019PCANC
DetailsJim Sly
Homeowner will be home to give access to backyard where the plans are enclosed. If there are any concerns please reach out: ###-#### Phone #: ###-#### >> Inspection requested via web by Rob Maes Inspection cancelled from web by: Rob Maes
BLD-Final5/13/20195/14/20195/14/2019PNR
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Rob Maes
Need Electr. final.
BLD-Final5/13/20195/14/20195/13/2019ACANC
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by Rob Maes Inspection cancelled from web by: Rob Maes
BLD-Framing/Rough-in5/3/20195/3/20195/3/2019APASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Rob Maes
Collar ties in attic......OK.
Issue PAID IN FULL permit  4/19/2019 DONE
emailed idahopermits@auricsolar.com to sign permit and send back
Plan assigned to (JAB) Josh4/10/20194/10/20194/18/2019 PASS
DetailsJosh Bogle
4/16 PV, ePlan - 1st done
Routing - PLAN CHECK4/18/2019 4/18/2019 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  4/18/2019 DONE
DetailsJosh Bogle
ESC no - Energy no
Permit Ready to Issue  4/18/2019 DONE
Routing - PLAN CHECK4/10/2019 4/16/2019 FAIL
DetailsJosh Bogle
no roof structure details
Routing - PLANNING4/10/2019 4/16/2019 PASS
DetailsColleen T Carroll
1st review completed  4/16/2019 FAIL
DetailsJosh Bogle
Intake Approval  4/10/2019 PASS
Recd Pcfee & Taken To Pln CK  4/10/2019 DONE
no fees taken at intake
Application received  4/8/2019 DONE
Application submitted via PDS Online on Apr 8 2019 1:47PM