BLD-Aging Inspection | 5/6/2020 | 5/6/2020 | 5/7/2020 | | PEND |
Tell Riley
|
|
|
|
BLD-Aging Inspection | 5/5/2020 | 5/5/2020 | 5/5/2020 | | FAIL |
Tell Riley
|
|
|
no inspections requested//
|
Issue PAID IN FULL permit | | | 6/21/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/21/2019 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 4/24/2019 | 4/24/2019 | 6/20/2019 | | PASS |
Josh Bogle
|
|
|
4/30 repair, ePlan - 1st done
|
Routing - PLAN CHECK | 6/20/2019 | | 6/20/2019 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 6/20/2019 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 4/24/2019 | | 4/26/2019 | | FAIL |
Josh Bogle
|
|
|
plan lacked information - see e-mail to Trent
|
1st review completed | | | 4/26/2019 | | FAIL |
Josh Bogle
|
|
|
|
Intake Approval | | | 4/24/2019 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/24/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/24/2019 | | DONE |
|
|
|
|
Intake Approval | | | 4/23/2019 | | FAIL |
|
|
|
4-23-2019 Previous corrections not met. Please submit a floor plan of the area being repair.
|
Intake Approval | | | 4/17/2019 | | FAIL |
|
|
|
We need to see drawings of the work you are going to do. Please show a floor plan and the location, type, size, etc.
|
Application received | | | 4/9/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 9 2019 12:22PM
|