BLD-Final | 3/13/2020 | 3/16/2020 | 3/16/2020 | A | PASS |
Jim Storey
|
|
|
Marcus Phone #: ###-####
|
Print Occupancy Form | | | 3/16/2020 | | DONE |
|
|
|
|
Permanent Occupancy | | | 3/16/2020 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/13/2020 | 3/13/2020 | 3/13/2020 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, annual inspection for fire sprinklers is current, fire panel is normal with 2 lines of communication, fire extinguishers are placed with current inspection tags. Final life fire safety inspection is complete, signature card not available at time of inspection.
Marcus Phone #: ###-####
|
Permit Ready to Issue | | | 2/5/2020 | | DONE |
|
|
|
DO NOT ISSUE- plan mod
|
CHANGE STATUS TO (ISS) | | | 2/5/2020 | | DONE |
|
|
|
|
Plan assigned to (JG) | 10/29/2019 | 10/29/2019 | 2/4/2020 | | PASS |
Javier Guzman
|
|
|
01/28 3rd rev com, Northwest Building Systems paper
|
Routing - PLAN CHECK | 1/22/2020 | | 2/4/2020 | | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 2/4/2020 | | DONE |
|
|
|
|
Routing - MECHANICAL | 1/22/2020 | | 1/24/2020 | | PASS |
Chad Schwendiman
|
|
|
|
Plan resubmittals received | | | 1/22/2020 | | DONE |
|
|
|
two copies of sheets M1.0 and sheet 1 taken to javier
|
Routing - PLAN CHECK | 1/7/2020 | | 1/7/2020 | | FAIL |
Javier Guzman
|
|
|
need eng mech plans
|
Routing - MECHANICAL | 1/7/2020 | | 1/7/2020 | | FAIL |
Chad Schwendiman
|
|
|
Need plans stamped and signed my a Idaho Licensed Mechanical Engineer, Need a make air design for 28,000 cfm.
|
Plan Reviewer's activity | | | 1/6/2020 | | DONE |
Michael Hanson
|
|
|
Applicant stated he was moving the welding operation to the smaller space previously "dry storage" to eliminate the ventilation requirements. I asked him to provide (2) updated plans for plan modification review.
|
Plan resubmittals received | | | 1/6/2020 | | DONE |
|
|
|
two copies of plan sheets M1.0 taken to javier
|
Routing - PLAN CHECK | 10/29/2019 | | 11/12/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing - FIRE | 10/30/2019 | 10/30/2019 | 11/6/2019 | | PASS |
Mark Stumbaugh
|
|
|
No additional review required
|
Routing - MECHANICAL | 10/29/2019 | | 10/31/2019 | | FAIL |
Chad Schwendiman
|
|
|
emailed Mechanical plan review comments to applicant and engineer. Up loaded to documents as well.
|
Plan Reviewer's activity | | | 10/29/2019 | | DONE |
Javier Guzman
|
|
|
Mechanical plans for the shop area sent to mechanical for review, this will require a mechanical permit and will need mechanical review only. BLD19-01125 will not need to be altered and is pending mechanical approval.
|
Plan Modification Accepted | | | 10/29/2019 | | DONE |
|
|
|
adding 2 intake venthilators. Submitted 2 copies of sheet M1.0
|
BLD-Final | 7/1/2019 | 7/2/2019 | 7/2/2019 | A | NR |
Jim Storey
|
|
|
Jerad Phone #: ###-####
|
FIRE-Final Inspection | 7/1/2019 | 7/1/2019 | 7/1/2019 | P | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for list of corrections that include repairing exit signs and emergency lights, adding exit signs and emergency ?lights, providing annual inspection for the fire extinguishers, adding/approval of the two exterior rooms under the east side canopy, repairing the fire alarm panel...ect
Jerad Phone #: ###-####
|
FIRE-Final Inspection | 6/10/2019 | 6/11/2019 | 6/11/2019 | A | FAIL |
Jim Page
|
|
|
Under a previous tenant notes (BLD17-01333) it was noted that some overhead doors did not have fire sprinkler protection under the roll up type doors which is required by NFPA13. The heads were added but no permit was issued. A permit needs to be issued, inspected and passed before life fire safety inspection for this permit can be completed. Reference notes under BLD17-01333 for defecincies that were noted on 7/12/2017 and 4/19/2018.
Ross Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/4/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/24/2019 | | DONE |
|
|
|
ALL MET
|
Print Occupancy Form | | | 5/24/2019 | | DONE |
|
|
|
|
Telephone call | | | 5/24/2019 | | DONE |
|
|
|
LEFT MESSAGE FOR ROSS THAT PERMIT IS READY
|
Plan assigned to (JG) | 4/12/2019 | 4/12/2019 | 5/23/2019 | | PASS |
Javier Guzman
|
|
|
2nd rev, 04/16 L2 Occ Eval Northwest Building Systems paper
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/23/2019 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/23/2019 | | DONE |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 5/17/2019 | | 5/23/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing - FIRE | 5/17/2019 | 5/17/2019 | 5/21/2019 | | PASS |
Mark Scharfen
|
|
|
05.21.2019-Completed fire review. Reviewed new docuements, uploaded rev_fire 05.21.2019.pdf. Passed review.
|
Plan resubmittals received | | | 5/17/2019 | | DONE |
|
|
|
Two copies of each C1.0 Site & Floorplan and Metal Welding and cutting binders. Stamped and taken to the plan reviewer.
|
1st review completed | | | 4/17/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 4/9/2019 | | 4/17/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing - FIRE | 4/12/2019 | 4/12/2019 | 4/16/2019 | | FAIL |
Mark Scharfen
|
|
|
IFC 1st review 04.16.2019.pdf uploaded and emailed to applicant.
|
Routing PW Environmental | 4/12/2019 | | 4/15/2019 | | PASS |
Rick Christenson
|
|
|
|
Plan assigned to (CJW) | 4/9/2019 | | 4/12/2019 | | DEFR |
Carl Westfall
|
|
|
occupancy
|
Routing - PUBLIC WORKS | 4/9/2019 | | 4/11/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Addressing | 4/9/2019 | | 4/10/2019 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/9/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/9/2019 | | DONE |
|
|
|
|
Intake Approval | | | 4/9/2019 | | PASS |
|
|
|
|
First Notice | | 3/26/2020 | | | |
|
|
|
|
Application received | | 4/9/2019 | | | |
|
|
|
|