BLD-Final | 6/30/2020 | 7/1/2020 | 7/1/2020 | A | FAIL |
Tell Riley
|
|
|
Mike Phone #: ###-####//CN notice issued for barrier gate, and window alarm requirements listed on plans and description//
|
BLD-Footing | 4/25/2019 | 4/26/2019 | 4/26/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Mike Meske
|
Routing Walk-In (BLD) | 4/11/2019 | 4/11/2019 | 4/11/2019 | P | PASS |
Jenny Nelson
|
|
|
|
Plan assigned to (JAB) Josh | 4/10/2019 | 4/10/2019 | 4/11/2019 | | PASS |
Josh Bogle
|
|
|
4/15 pool, paper - 1st done
|
Inspection Record Card- Bld | | | 4/11/2019 | | DONE |
Jenny Nelson
|
|
|
|
Case Summary (BLD) | | | 4/11/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/11/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 4/11/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/11/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 4/10/2019 | 4/10/2019 | 4/10/2019 | P | FAIL |
Josh Bogle
|
|
|
Need ICC-ES Report or equal for the liner to be installled
|
Routing - PLAN CHECK | 4/10/2019 | | 4/10/2019 | | FAIL |
Brian McGowan
|
|
|
Need ICC-ES Report or equal for the liner
|
Routing - PLAN CHECK | 4/10/2019 | | 4/10/2019 | | FAIL |
Josh Bogle
|
|
|
no siite plan, no build plan, no barriers noted
|
1st review completed | | | 4/10/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 4/9/2019 | 4/9/2019 | 4/9/2019 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 4/9/2019 | 4/9/2019 | 4/9/2019 | P | PASS |
Josh Bogle
|
|
|
aoplicant dropped plans off, level two review
|
Application received | | 4/9/2019 | | | |
|
|
|
|