Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD19-01134
StatusFinaled
Name HOFF DESIGN BUILD
Site Address 5835 W TARGEE ST
Project NameWalker Addition
Customer Number 
ePlanReviewNo
Description
Permit for a 675sq' addition that adds another Bedroom, family room and dining space and reconfigures an existing full Bath. All work per plans, notations, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/20/20198/21/20198/21/2019PPASS
DetailsMike Jordan
hOFF Phone #: ###-#### please call ahead
DOC - Permit Finaled8/21/20198/21/20198/21/2019PPASS
DetailsMike Jordan
BLD-Energy code compliance6/14/20196/17/20196/17/2019APASS
DetailsMike Jordan
Phone #: ###-####
BLD-Framing/Rough-in6/13/20196/14/20196/14/2019PPASS
DetailsMike Jordan
Tracy- as late as possible Phone #: ###-####
Routing - MECHANICAL6/14/2019 6/14/2019 PASS
DetailsTroy James
New manual j report. The condenser may not have the capacity to satisfy cooling. The contractor has been made aware of the potential that the condenser may not satisfy the cooling.
BLD-Framing/Rough-in6/13/20196/13/20196/13/2019PNR
DetailsMike Jordan
Tracy Phone #: ###-####. Mech. rough in inspection has failed.
BLD-Wall Bracing6/13/20196/13/20196/13/2019PPASS
DetailsMike Jordan
Ok to cover exterior only.
BLD-Conference6/12/20196/12/20196/12/2019PDONE
DetailsMike Jordan
Tracy Phone #: ###-####- please call access
BLD-Foundation4/30/20194/30/20194/30/2019PPASS
DetailsDave Hannah
Eric Phone #: ###-####
BLD-Footing4/19/20194/22/20194/22/2019APASS
DetailsMike Jordan
Eric Phone #: ###-####
OVERRIDE  4/10/2019  
Routing Walk-In (Zoning)4/10/20194/10/20194/10/2019APASS
DetailsNicolette Womack
Routing Walk-In (BLD)4/10/20194/10/20194/10/2019ADONE
DetailsJosh Bogle
Routing - PLAN CHECK4/10/2019 4/10/2019 PASS
DetailsJosh Bogle
1st review completed  4/10/2019 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  4/10/2019 DONE
DetailsJosh Bogle
Case Summary (BLD)  4/10/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  4/10/2019 DONE
DetailsJosh Bogle
Permit Ready to Issue  4/10/2019 DONE
Issue PAID IN FULL permit  4/10/2019 DONE
Application received 4/10/2019   
Routing - MECHANICAL6/14/2019