BLD-Final | 8/8/2019 | 8/8/2019 | 8/8/2019 | P | PASS |
Brandon Shaw
|
|
|
Chris home owner called the inspection in Phone #: ###-####
|
DOC - Permit Finaled | 8/8/2019 | 8/8/2019 | 8/8/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 6/24/2019 | 6/25/2019 | 6/25/2019 | A | FAIL |
Jim Storey
|
|
|
If no one home just walk down the driveway to the back corner of house and inspect, permit is attached to wall under the cover. Phone #: ###-#### Inspection requested via web by Preston Reynolds repair leaking roof at valley cut in
|
BLD-Final | 5/29/2019 | 5/29/2019 | 5/29/2019 | A | NH |
Brandon Shaw
|
|
|
Phone #: 2084420076 >> Inspection requested via mobile web by Jay Reynolds
|
BLD-Framing/Rough-in | 5/15/2019 | 5/16/2019 | 5/16/2019 | A | PASS |
Jim Storey
|
|
|
Framing is ready now. hoping for early inspection Phone #: ###-#### Inspection requested via web by Jay Reynolds transpher bearing at post base.
|
BLD-Foundation | 5/9/2019 | 5/10/2019 | 5/10/2019 | A | PASS |
Jim Storey
|
|
|
Jay Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/8/2019 | | DONE |
|
|
|
Emailed- preston@rbcidaho.com
|
Inspection Record Card- Bld | | | 5/8/2019 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 4/10/2019 | 4/10/2019 | 5/6/2019 | | PASS |
Josh Bogle
|
|
|
4/16 patio cover, ePlan - 1st done
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/6/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 5/6/2019 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 5/6/2019 | | 5/6/2019 | | PASS |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 5/6/2019 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 4/25/2019 | | 4/25/2019 | | FAIL |
Josh Bogle
|
|
|
code references not current, attachment to the house lacks detail
|
1st review completed | | | 4/16/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/10/2019 | | 4/16/2019 | | FAIL |
Josh Bogle
|
|
|
plans lacked a few required structural details
|
Application received | | | 4/10/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 10 2019 10:28AM
|
Intake Approval | | | 4/10/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/10/2019 | | DONE |
|
|
|
no fees taken at intake
|
Routing - PLANNING | 4/10/2019 | | 4/10/2019 | | PASS |
Ethan Mansfield
|
|
|
|