Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD19-01149
StatusFinaled
Name BLUE RAVEN SOLAR LLC
Site Address 2750 S BARNSIDE WAY
Project NameJohn Batterton PV
Customer Number 
ePlanReviewYes
Description
MODIFICATION OF PANEL MANUFACTURER 5/23/19 **jab** Permit for 385sq' of roof-mounted, grid-tied Photo-voltaic panels with micro-inverters; 22 panels in 1 array. No work needed to the existing roof structure per engineer’s roof evaluation. All racking, modules, and other listed equipment must be installed by a certified installer. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/6/20196/7/20196/7/2019PPASS
DetailsBrandon Shaw
Inspection requested via web by BRS Permitting
DOC - Permit Finaled6/7/20196/7/20196/7/2019PPASS
DetailsBrandon Shaw
CHANGE STATUS TO (ISS)  5/29/2019 DONE
Plan assigned to (JAB) Josh5/16/20195/16/20195/23/2019 PASS
DetailsJosh Bogle
5/22 PV mod, ePlan - 1st done
Routing - PLAN CHECK5/23/2019 5/23/2019 FAIL
DetailsJosh Bogle
no spec sheet provided for new panel
Routing - PLAN CHECK5/23/2019 5/23/2019 PASS
DetailsJosh Bogle
Permit Ready to Issue  5/23/2019 DONE
BLD-Framing/Rough-in5/15/20195/16/20195/17/2019PCANC
DetailsBrandon Shaw
If possible, please reach out to the number above before heading out to the jobsite. Phone #: ###-#### Inspection requested via web by BRS Permitting
Plan Modification Accepted  5/16/2019 DONE
solar panel change
Permit Ready to Issue  4/26/2019 DONE
Issue PAID IN FULL permit  4/26/2019 DONE
emailed permitting.department@blueravensolar.com to sign building permit
Plan assigned to (JAB) Josh4/10/20194/10/20194/25/2019 PASS
DetailsJosh Bogle
4/16 PV, ePlan - 1st done
Routing - PLAN CHECK4/25/2019 4/25/2019 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  4/25/2019 DONE
DetailsJosh Bogle
ESC no - Energy no
Routing - PLANNING4/10/2019 4/23/2019 PASS
DetailsSue Cummings
Requires HOA approval prior to obtaing a building permit. HOA approval submitted. O.K. now
1st review completed  4/16/2019 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK4/10/2019 4/16/2019 FAIL
DetailsJosh Bogle
no Plan Review pending Planning approval
Application received  4/10/2019 DONE
Application submitted via PDS Online on Apr 10 2019 2:44PM
Plans ACCEPTED BY PLAN TECH  4/10/2019  
Recd Pcfee & Taken To Pln CK  4/10/2019 DONE
Intake Approval  4/10/2019 PASS