BLD-Final | 5/7/2019 | 5/8/2019 | 5/8/2019 | A | DONE |
Tony Young
|
|
|
Alex Phone #: ###-####
|
DOC - Permit Finaled | 5/8/2019 | 5/8/2019 | 5/8/2019 | P | PASS |
Tony Young
|
|
|
done
|
Routing Walk-In (BLD) | 4/22/2019 | 4/22/2019 | 4/22/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/22/2019 | | 4/22/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 4/22/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/22/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/22/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 4/22/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/22/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 4/22/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 4/10/2019 | 4/10/2019 | 4/10/2019 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 4/10/2019 | 4/10/2019 | 4/10/2019 | P | FAIL |
Brian McGowan
|
|
|
Home was built in 1953, no roof design was provided. I requested layout and engineering approval for adding the solar panels.
|
Routing - PLAN CHECK | 4/10/2019 | | 4/10/2019 | | FAIL |
Brian McGowan
|
|
|
Home was built in 1953, no roof design was provided. I requested layout and engineering approval for adding the solar panels.
|
1st review completed | | | 4/10/2019 | | FAIL |
Brian McGowan
|
|
|
Home was built in 1953, no roof design was provided. I requested layout and engineering approval for adding the solar panels.
|
Application received | | 4/10/2019 | | | |
|
|
|
|