BLD-Final | 10/31/2019 | 10/31/2019 | 10/31/2019 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
DOC - Permit Finaled | 10/31/2019 | 10/31/2019 | 10/31/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 10/31/2019 | 10/31/2019 | 10/31/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.78
|
PubWorks Occupancy Approval | 10/31/2019 | 10/31/2019 | 10/31/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Brandon Shaw
|
|
|
LES Phone #: ###-####
|
BLD-Framing/Rough-in | 7/3/2019 | 7/5/2019 | 7/5/2019 | A | PART |
Brandon Shaw
|
|
|
Pending corrections- Straps at break in double top plates, drill and install hold downs per plans, point laod to bear down to foundation... See red crayon...
|
BLD-Wall Bracing | 6/11/2019 | 6/11/2019 | 6/11/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress... Hold downs to be installed by framing rough-in...
|
BLD-Foundation | 5/16/2019 | 5/17/2019 | 5/17/2019 | A | CANC |
Brandon Shaw
|
|
|
Jerry Phone #: ###-####
|
BLD-Wall Bracing | 5/16/2019 | 5/16/2019 | 5/17/2019 | P | PASS |
Brandon Shaw
|
|
|
Foundation... Work in progress...
|
BLD-Footing | 5/15/2019 | 5/15/2019 | 5/15/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
PubWorks Subgrade Approval | 5/15/2019 | 5/15/2019 | 5/15/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 5/3/2019 | | DONE |
|
|
|
emailed permit to- kdavis@boisehunterhomes.com to signed permit
|
Inspection Record Card- Bld | | | 5/3/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 4/15/2019 | | |
|
|
|
|
Route to Impact Fee Review | 4/12/2019 | 4/15/2019 | 4/15/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plan assigned to (J_N) | 4/12/2019 | 4/12/2019 | 4/15/2019 | | DONE |
|
|
|
05/01 sfd L2 ePlan. 1st complete 4/15, waiting for hillside
|
Routing - PLAN CHECK | 4/12/2019 | | 4/15/2019 | | PASS |
Jenny Nelson
|
|
|
|
Routing PW Grading-Hillside | 4/12/2019 | | 4/15/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
1st review completed | | | 4/15/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/15/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 4/15/2019 | | DONE |
|
|
|
|
Routing - FIRE | 4/12/2019 | 4/12/2019 | 4/12/2019 | | PASS |
Lee G Meredith
|
|
|
04/25 2427 S Trapper Residential Hillside
No sprinklers required. LGM
|
Routing - Erosion and Sediment | 4/12/2019 | | 4/12/2019 | | PASS |
Michael Zawacki
|
|
|
Foothills lot.
|
Intake Approval | | | 4/12/2019 | | PASS |
|
|
|
|
Routing - MECHANICAL | 4/12/2019 | | 4/12/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 4/12/2019 | | 4/12/2019 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 4/12/2019 | | 4/12/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/12/2019 | | 4/12/2019 | | PASS |
Morgan Webb
|
|
|
|
Application received | | | 4/11/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 11 2019 8:30AM
|