Description
**HILLSIDE** **WUI FOOTHILLS ZONE A** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2,254 sq. ft., two story (garage and mechanical room basement level, all living upper level) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 522 sq. ft. of covered patio/porch and a 1,279-sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning. JJNA letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final. SPRINKLERS ARE REQUIRED. LGM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Other3/4/20203/5/20203/5/2020APASS
DetailsTony Young
Dillion Phone #: ###-####// 415 to nominate for energy award
DOC - Permit Finaled3/5/20203/5/20203/5/2020PPASS
DetailsTony Young
BLD-Final3/4/20203/4/20203/4/2020PPASS
DetailsTony Young
Dillion Phone #: ###-####
BLD-Blower Door Test Results3/4/20203/4/20203/4/2020PPASS
DetailsTony Young
Dillion Phone #: ###-####// 1,6
BLD-Final3/2/20203/4/20203/4/2020APASS
DetailsTony Young
Dillon Phone #: ###-####
PubWorks Occupancy Approval3/4/20203/4/20203/4/2020 DONE
DetailsMelissa Jannusch
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Final2/28/20203/2/20203/2/2020PPART
DetailsTony Young
Dillon Phone #: ###-####,, walk through,, needs hillside pass,, handrail finished,, fire seperation sealed,, cable railing letter of ok from the engineer
BLD-Energy code compliance11/20/201911/21/201911/21/2019APASS
DetailsTony Young
Dillon Phone #: ###-####
BLD-Energy code compliance11/20/201911/20/201911/20/2019PNR
DetailsTony Young
Dillon Phone #: ###-####,, needs plumbing, fire sprinklers prior to cover
BLD-Framing/Rough-in11/7/201911/8/201911/8/2019PPART
DetailsTony Young
Dillon Phone #: ###-####,, walls ok to insulate,, needs fire sprinklers and plumbing pass prior to energy code inspection,, insulation will be used for fireblocking
BLD-Framing/Rough-in11/5/201911/7/201911/8/2019PDEFR
DetailsTony Young
Dillon Phone #: ###-####
BLD-Wall cover11/4/201911/5/201911/5/2019APART
DetailsTony Young
soffits work in progress,, ok after ele rough in
BLD-Conference11/4/201911/4/201911/4/2019PPART
DetailsTony Young
Dillon Phone #: ###-####,, ok to do the base layer of foam in the attic
BLD-Wall Bracing10/7/201910/8/201910/8/2019APASS
DetailsTony Young
Dillon Phone #: ###-####
BLD-Wall Bracing10/4/201910/7/201910/7/2019ANR
DetailsTony Young
Dillon Phone #: ###-####,, re-do
BLD-Footing9/4/20199/5/20199/5/2019APART
DetailsTony Young
Andy Phone #: ###-####,, footings on the west side of the house,,
BLD-Wall Bracing8/30/20198/30/20198/30/2019PPEND
DetailsTony Young
ready by noon // Andy Phone #: ###-####,, 3:23,, already poured footings
BLD-Foundation8/26/20198/26/20198/26/2019PPASS
DetailsTony Young
wall // Andy Phone #: ###-####
BLD-Footing8/21/20198/22/20198/22/2019APART
DetailsTony Young
Andy Phone #: ###-####,, upper house footings
BLD-Footing8/20/20198/21/20198/21/2019ANR
DetailsTony Young
Andy Phone #: ###-####,, needs soils approval 1st
PubWorks Subgrade Approval8/21/20198/21/20198/21/2019 DONE
DetailsMelissa Jannusch
HOME AND GARAGE FOOTINGS A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

BLD-Footing8/19/20198/20/20198/20/2019PNR
DetailsTony Young
Andy Phone #: ###-####
BLD-Foundation7/15/20197/16/20197/16/2019APART
DetailsTony Young
Andy Phone #: ###-####,, garage walls ok,,
BLD-Footing7/3/20197/8/20197/8/2019APASS
DetailsMike Jordan
Andy Phone #: ###-####. Garage footings only ok for concrete.
BLD-Footing7/2/20197/3/20197/3/2019PNR
DetailsTony Young
Andy Phone #: ###-####,, work in progress,,
PubWorks Subgrade Approval6/21/20196/21/20196/21/2019 DONE
DetailsJason C. Taylor
***GARAGE FOOTINGS ONLY***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
OVERRIDE  6/13/2019  
Issue PAID IN FULL permit  6/13/2019 DONE
emailed schidaho@hotmail.com to sign prmits and send back
Inspection Record Card- Bld  6/13/2019 DONE
Inspection Record Card- Bld  6/13/2019 DONE
Permit Ready to Issue  6/13/2019 DONE
Plan assigned to (J_N)4/12/20194/12/20196/12/2019 DONE
DetailsJenny Nelson
05/01 sfd L2 ePlan. 3rd review, update soffit assembly, update vent specification. 2nd review, clarify soffits. 1st complete 4/18, foundation plan, cable guard engineering, soffit es report, geotechnical report
Routing - PLAN CHECK6/12/2019 6/12/2019 FAIL
DetailsJenny Nelson
5/8 type x needed under Nichi soffit material, specify vents that comply with wui
Routing - PLAN CHECK6/12/2019 6/12/2019 PASS
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  6/12/2019 DONE
DetailsJenny Nelson
Routing - FIRE6/5/20196/5/20196/6/2019 PASS
DetailsLee G Meredith
06/18 N Lancaster Pl Resubmittal LM

Sprinklers are being installed, as noted on Index page.
Routing - PLAN CHECK6/5/2019 6/5/2019 FAIL
DetailsJenny Nelson
Clarify soffit material
Routing PW Grading-Hillside6/4/2019 6/4/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Routing PW Grading-Hillside4/12/2019 4/22/2019 FAIL
DetailsMelissa Jannusch
Please upload full geotechnical engineering report
1st review completed  4/22/2019 FAIL
DetailsJenny Nelson
Routing - PLAN CHECK4/12/2019 4/18/2019 FAIL
DetailsJenny Nelson
Need foundation plan, need engineering for cable guards, ES report for proposed soffit material, geotechnical report
Routing - PLANNING4/12/2019 4/18/2019 PASS
DetailsLeon Letson
Route to Impact Fee Review4/12/20194/15/20194/15/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL4/12/2019 4/15/2019 PASS
DetailsTroy James
Routing - FIRE4/12/20194/12/20194/12/2019 FAIL
DetailsLee G Meredith
04/25 3156 N Lancaster Pl. Residential

4-12-19 Sprinklers currently required. Inadequate flow and access distance exceeded. Emailed applicant.

6-3-19 Sent revised review comments and subdivision requirements to applicant and requested resubmittal to indicate sprinklers will be provided.
Routing - Erosion and Sediment4/12/2019 4/12/2019 PASS
DetailsMichael Zawacki
Foothills lot. Site prep inspection required.
Routing - Addressing4/12/2019 4/12/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS4/12/2019 4/12/2019 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  4/12/2019 DONE
Recd Pcfee & Taken To Pln CK  4/12/2019 DONE
Intake Approval  4/12/2019 PASS
Application received  4/11/2019 DONE