Third Notice | | 7/14/2020 | 8/11/2020 | | DONE |
|
|
|
mailed 8-14-2020
|
Third Notice | | 5/12/2020 | 7/9/2020 | | DONE |
|
|
|
mailed 7-9-2020
|
Second Notice | | 4/16/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020
|
First Notice | | 3/30/2020 | 4/6/2020 | | DONE |
|
|
|
mailed 4-6-2020
|
Permanent Occupancy | | | 3/20/2020 | | DONE |
|
|
|
|
BLD-Final | 3/19/2020 | 3/19/2020 | 3/19/2020 | P | PASS |
Mike Jordan
|
|
|
wayne Phone #: ###-####. All isuues resolved. Ok for perm occ.
|
BLD-Final | 3/19/2020 | 3/19/2020 | 3/19/2020 | A | PART |
Mike Jordan
|
|
|
Ok for temp occ. Provide ADA restroom signs and toilet flusher needs to be on turning side.
|
BLD-Final | 3/18/2020 | 3/19/2020 | 3/19/2020 | A | NR |
Mike Jordan
|
|
|
Wayne Phone #: ###-####
|
FIRE-Final Inspection | 3/18/2020 | 3/18/2020 | 3/18/2020 | P | PASS |
Troy Cobbley
|
|
|
life safety passed.
Wayne Phone #: ###-####
|
FIRE-Final Inspection | 3/12/2020 | 3/13/2020 | 3/13/2020 | A | FAIL |
Troy Cobbley
|
|
|
Provide all smalll documents, remove dead bolt at Kitchen exit door, remove dead bolt at exit door near Rest Rooms and provide approved single action hardware, provide correct address, post occupant load sign, provide alarm system for the CO if required.
Wayne Phone #: ###-####
|
FIRE-Final Inspection | 3/12/2020 | 3/12/2020 | 3/12/2020 | P | FAIL |
Troy Cobbley
|
|
|
I tried calling contact but they did no pick up. I went to job site and found both the front and rear doors locked. No inspection performed. Will need to be rescheduled.
Call for access- Wayne Phone #: ###-####
|
BLD-Final | 3/10/2020 | 3/10/2020 | 3/10/2020 | P | NR |
Mike Jordan
|
|
|
Wayne Phone #: ###-####. Needs life/safety and CDHD.
|
Print Occupancy Form | | | 3/10/2020 | | DONE |
|
|
|
reprint
|
BLD-Ceiling Grid Inspection | 2/7/2020 | 2/10/2020 | 2/10/2020 | A | NR |
Mike Jordan
|
|
|
Wayne- call for access Phone #: ###-####. Received smoke and flame spread values for tiles. Also need documentation on how tiles are to be installed.
|
BLD-Ceiling Grid Inspection | 2/3/2020 | 2/3/2020 | 2/3/2020 | P | NR |
Mike Jordan
|
|
|
wayne Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 12/30/2019 | 12/30/2019 | 12/30/2019 | P | NR |
Mike Jordan
|
|
|
wayne - call for access Phone #: ###-####. Needs MEP's first.
|
BLD-Framing/Rough-in | 10/1/2019 | 10/2/2019 | 10/2/2019 | A | PASS |
Mike Jordan
|
|
|
Wayne- please call for access Phone #: ###-####. All issues were resolved.
|
BLD-Framing/Rough-in | 9/25/2019 | 9/25/2019 | 9/25/2019 | P | FAIL |
Mike Jordan
|
|
|
Wayne Phone #: ###-####. Interior wood framed walls. Needs to foam seal all penetrations through top plates with red foam. Fire block concelaed space at top of double wall behind point of sales.
|
BLD-Framing/Rough-in | 9/19/2019 | 9/19/2019 | 9/19/2019 | A | NR |
Mike Jordan
|
|
|
Needs plumbing r.i. inspection first.
|
BLD-Framing/Rough-in | 9/18/2019 | 9/19/2019 | 9/19/2019 | A | NH |
Mike Jordan
|
|
|
wayne Phone #: ###-####. No access.
|
Meeting | | | 8/15/2019 | | DONE |
|
|
|
change of gc do to retirement, no fee per tisha. see documents.
Rods Home Improvement LLP to Construction Services & Repairs INC
|
(F) Reprint permit | | | 8/15/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/28/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/28/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 6/28/2019 | | DONE |
|
|
|
|
Routing - FIRE | 6/18/2019 | 6/18/2019 | 6/26/2019 | | PASS |
Mark Scharfen
|
|
|
06.26.2019-Completed fire review, uploaded rev_fire 06.26.2019.pdf.
|
Plan assigned to (CJW) | 5/22/2019 | 6/14/2019 | 6/26/2019 | | PASS |
Carl Westfall
|
|
|
(1st done) 06/07/19 (L-3 - 15 days) (eplan - 28 sheets) Flying Pie Pizzaria (routed to staff)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/26/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/26/2019 | | DONE |
|
|
|
emailed florian@flyingpie.org the fees due-let her know the GC will have to sign permit-attached sign off card in approved docs
met-Need GC
met-Need Rev Val
|
Routing - PLANNING | 6/18/2019 | | 6/21/2019 | | PASS |
Leon Letson
|
|
|
|
Routing - MECHANICAL | 6/18/2019 | | 6/19/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 6/18/2019 | | 6/19/2019 | | PASS |
Carl Westfall
|
|
|
2nd IBC plan review approved
|
Plan resubmittals received | | | 6/18/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 6/11/2019 | 6/14/2019 | 6/12/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 5/22/2019 | 5/22/2019 | 6/11/2019 | | FAIL |
Mark Scharfen
|
|
|
06.11.2019-Completed fire review. Uploaded rev_fire 06.11.2019.pdf and emailed to architect.
|
1st review completed | | | 6/11/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 6/11/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/22/2019 | | 6/10/2019 | | FAIL |
Carl Westfall
|
|
|
1st IBC plan review completed
|
Routing PW Environmental | 5/23/2019 | | 5/29/2019 | | PASS |
Rick Christenson
|
|
|
|
Routing - MECHANICAL | 5/22/2019 | | 5/28/2019 | | FAIL |
Troy James
|
|
|
See Eplan
|
Routing - PUBLIC WORKS | 5/22/2019 | | 5/23/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLUMBING | 5/22/2019 | | 5/22/2019 | | PASS |
Daryl Spivey
|
|
|
per plan and ISPC.
|
Routing - PLANNING | 5/22/2019 | | 5/22/2019 | | FAIL |
Leon Letson
|
|
|
Additional information required regarding number of new seats and available parking for the project.
|
Routing - Addressing | 5/22/2019 | | 5/22/2019 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 5/20/2019 | | PASS |
|
|
|
|
Intake Approval | | | 4/25/2019 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following:
• The form #304 is incomplete, fill out the owner information section
• Seems there are a few scaled measurements of the floor plan A101, detail 3 on plan sheet A401, that are incorrect, revise
• Provide section details of the suspended ceiling
• Per ePlan submittal standards reserve the bottom right corner for City electronic stamps. Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block on all electrical, mechanical and plumbing plan sheets (see https://pds.cityofboise.org/media/464072/pdox86_electronic_standards_full_050718.pdf )
• Provide engineering calculations for the new 784 lbs. RTU and the New 804 lbs. MAU or a stamped letter from engineer stating the existing roof can support the new roof equipment.
|
Application received | | | 4/12/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 12 2019 7:58AM
|
Third Notice | | 8/16/2020 | | | |
|
|
|
|