BLD-Other | 5/20/2019 | 5/20/2019 | 5/20/2019 | P | PART |
Tony Young
|
|
|
dry wall for patio // Eric Phone #: ###-####,, soffit ok,, work in progress,, ok
|
BLD-Framing/Rough-in | 5/16/2019 | 5/16/2019 | 5/17/2019 | P | PASS |
Brandon Shaw
|
|
|
Erik Phone #: ###-####
|
BLD-Footing | 5/6/2019 | 5/7/2019 | 5/7/2019 | A | DONE |
Tony Young
|
|
|
Eric Phone #: ###-####,, 480 looked at it
|
PubWorks Subgrade Approval | 5/7/2019 | 5/7/2019 | 5/7/2019 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. A footing inspection may now be scheduled with the Building Department.
|
BLD-Footing | 5/6/2019 | 5/6/2019 | 5/6/2019 | P | PEND |
Tony Young
|
|
|
Eric Phone #: ###-####
|
BLD-Footing | 5/1/2019 | 5/1/2019 | 5/1/2019 | P | NR |
Brandon Shaw
|
|
|
Need soil sbubgrade submitted and approved by PW...
|
Issue PAID IN FULL permit | | | 5/1/2019 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 4/26/2019 | 4/26/2019 | 4/30/2019 | | PASS |
Josh Bogle
|
|
|
5/2 patio cover, paper
|
Routing - PLAN CHECK | 4/26/2019 | | 4/30/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 4/30/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/30/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/30/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 4/30/2019 | | DONE |
|
|
|
called Renaissance Remodeling and inform Kevin the fees due when picking up permit.
|
Routing - Erosion and Sediment | 4/26/2019 | | 4/29/2019 | | PASS |
Andy J. Long
|
|
|
Minimal exterior disturbance and excavation in scope of work. No ESC permit required.
|
Routing Walk-In (Zoning) | 4/26/2019 | 4/26/2019 | 4/26/2019 | A | PASS |
Katelyn Menuge
|
|
|
|
Routing Walk-In (BLD) | 4/26/2019 | 4/26/2019 | 4/26/2019 | A | PASS |
Josh Bogle
|
|
|
took in as a level two and routed
|
Routing PW Grading-Hillside | 4/26/2019 | | 4/26/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing Walk-In (BLD) | 4/17/2019 | 4/17/2019 | 4/17/2019 | P | FAIL |
Jenny Nelson
|
|
|
came in to talk about fire code before he submits plans since this is in the hillside
|
1st review completed | | | 4/17/2019 | | DONE |
Jenny Nelson
|
|
|
|
Application received | | 4/16/2019 | | | |
|
|
|
|