Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD19-01222
StatusFinaled
Name RRC CONTRACTORS
Site Address 6401 S EISENMAN RD Unit: UNIT 101
Project NameAll Valley Fire - 2nd Story
Customer Number 
ePlanReviewYes
Description
(ALL VALLEY FIRE – EXPANDED 2ND STORY – QUARRY BUSINESS PARK – NEAR SOUTH END) The fire sprinkler system is used for building area increase, for story increase, for fire area, and for fire flow. To construct a 684 square foot addition to the existing 1,253 square foot 2nd story within a tenant space having 4,020 square feet on the 1st story. After the expansion, the 2nd story will have a total floor area of about 1,937 square feet and this tenant space will have a total floor area of about 5,957 square feet. Work is to include reinforced concrete footings, parallel strand wood columns, wood shear walls, hold downs, laminated veneer wood beams, wood I joists, wood ledgers, wood structural decking, interior walls, stair stringers, and stair treads. Portions of the existing concrete floor slab will be removed for the installation of new footings. Special Inspection is required for soils and concrete (including anchors post-installed in hardened concrete). The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. This permit is intended to establish a new Certificate of Occupancy for the entire tenant space including the new 684 square foot 2nd story floor area. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 4/8/20205/26/2020 DONE
This permit finaled on the web by derek cooper
Third Notice 3/10/20204/3/2020 DONE
mailed 4-6-2020
Second Notice 2/17/20203/5/2020 DONE
mailed 3-6-20
First Notice1/9/20201/9/20202/7/2020 DONE
DetailsJim Storey
mailed 2-10-20
BLD-Final1/9/20201/9/20201/9/2020PPASS
DetailsJim Storey
Zack Phone #: ###-####
DOC - Permit Finaled1/9/20201/9/20201/9/2020PPASS
DetailsJim Storey
FIRE-Final Inspection1/9/20201/9/20201/9/2020PPASS
DetailsJim Page
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work complete, signature card not available at time of inspection.

Zack Phone #: ###-####
BLD-Aging Inspection11/27/201911/27/201912/4/2019 PASS
DetailsJim Storey
wip handrailling pending for final insp
BLD-Framing/Rough-in7/16/20197/16/20197/16/2019PPART
DetailsJim Storey
Zach Phone #: ###-#### framing stairs and floor ok
BLD-Foundation6/27/20196/27/20196/27/2019PPASS
DetailsJim Storey
Zach - suite 101- rebar inspection Phone #: ###-####
Print Occupancy Form  6/17/2019 DONE
Issue PAID IN FULL permit  6/17/2019 DONE
Plan assigned to (CJW)5/9/20195/9/20196/5/2019 PASS
DetailsCarl Westfall
(1st done) 05/27/19 (L-3 - 15 days) (eplan - 9 sheets) All Valley Fire (routed to applicant)
PLANS/APPL TAKEN TO FRONT DESK  6/5/2019 DONE
Permit Ready to Issue  6/5/2019 DONE
ALL MET
NEED
GC form
Revised Certificate of Value
Route to Impact Fee Review6/3/20196/6/20196/4/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Routing - PLAN CHECK6/3/2019 6/4/2019 PASS
DetailsCarl Westfall
Routing Off Site - STRUCTURAL6/4/2019 6/4/2019 PASS
DetailsCarl Westfall
Chris Holladay (AHJ)
1st review completed  6/3/2019 DONE
Plan resubmittals requested  6/3/2019 DONE
Plan resubmittals received  6/3/2019 DONE
Routing - PLAN CHECK5/9/2019 6/3/2019 FAIL
DetailsCarl Westfall
Structural did not approved the drawings
Routing Off Site - STRUCTURAL5/29/2019 5/30/2019 FAIL
DetailsCarl Westfall
Chris Holladay (AHJ)
Routing - FIRE5/9/20195/9/20195/28/2019 PASS
DetailsMark Scharfen
05.28.2019-completed fire review. Uploaded Rev_fire 05.28.2019.pdf. Passed review.
Routing - PLANNING5/9/2019 5/10/2019 PASS
DetailsDavid Moser
interior remodel - CUP06-00039
Routing - Addressing5/9/2019 5/9/2019 PASS
DetailsDoug Chausow
Suite 101
Routing - PUBLIC WORKS5/9/2019 5/9/2019 PASS
DetailsAngela Hardy
Intake Approval  5/7/2019 PASS
Intake Approval  5/2/2019 FAIL
DetailsJoe Bruce
3) Form #310 “Statement of Special Inspections” was provided, but is not signed by the owner of record. It appears to be signed by Jeff Likes and not the owner. The owner has signed the registered design professional form. Please have the owner sign this document and upload.
Intake Approval  5/1/2019 FAIL
DetailsJoe Bruce
Please provide the additional items to complete your prescreen:

3) Form #310 “Statement of Special Inspections” was provided, but is not signed by the owner of record. It appears to be signed by Jeff Likes and not the owner. The owner has signed the registered design professional form. Please have the owner sign this document and upload. -

6) Form #310 - The revised (uploaded) document only includes the front page. All pages must be included when uploaded.
Intake Approval  4/29/2019 FAIL
DetailsJoe Bruce
Please provide the additional items to complete your prescreen:

3) Form #310 “Statement of Special Inspections” was provided, but is not signed by the owner of record. Provide a signature on this form by the owner.
4) No fire extinguishers could be located on the resubmittal. - Fire Extinguishers: Even though the fire extinguishers are existing, show their locations on the plan to verify code compliance. The added fire area of the mezzanine might require an additional fire extinguisher to be installed.
5) The lighting compliance certificate utilizes and old version of the IECC. The City of Boise has adopted the 2015 IECC. Revised the lighting compliance certificate to show the current code.
Intake Approval  4/25/2019 FAIL
DetailsJoe Bruce
Please provide the following to complete your prescreen:
1) Due to the structural scope of this the new mezzanine, this project will be routed as a #520 Major TI and will have a 20 working day review timeframe. The following additional items are required from the Major TI Submittal Checklist:
- Site Specific Fire Flow at the fire hydrant letter is required from Suez Water.
- Please submit your plans to ACHD for impact fee review. If no fees are due for this project scope, please email the letter from ACHD to me so I can upload this into the case. If fees are due, a receipt of the fee payment will need to be submitted at time of permit issuance.

2) Sheet G1.1 references the wrong mechanical code. The City of Boise has adopted the 2012 IMC. Revise drawings to show correct mechanical code or remove this code reference from the drawings.
3) Provide form #310 “Statement of Special Inspections” completed by the design engineer for the items noted in the structural notes which require a special inspector to perform inspection per chapter 17 of the 2015 IBC. (Concrete, Bolts, Steel, and Chemical Anchors)
4) Fire Extinguishers: Even though the fire extinguishers are existing, show their locations on the plan to verify code compliance. The added fire area of the mezzanine might require an additional fire extinguisher to be installed.
5) The switching requirements, daylight area switching, and automatic light control information could not be found on sheet A2.1. Provide a switching plan with occupancy/daylight sensors as required by section C405 of the 2015 IECC.
Application received  4/16/2019 DONE
Application submitted via PDS Online on Apr 16 2019 4:16PM