Third Notice | | 4/8/2020 | 5/26/2020 | | DONE |
|
|
|
This permit finaled on the web by derek cooper
|
Third Notice | | 3/10/2020 | 4/3/2020 | | DONE |
|
|
|
mailed 4-6-2020
|
Second Notice | | 2/17/2020 | 3/5/2020 | | DONE |
|
|
|
mailed 3-6-20
|
First Notice | 1/9/2020 | 1/9/2020 | 2/7/2020 | | DONE |
Jim Storey
|
|
|
mailed 2-10-20
|
BLD-Final | 1/9/2020 | 1/9/2020 | 1/9/2020 | P | PASS |
Jim Storey
|
|
|
Zack Phone #: ###-####
|
DOC - Permit Finaled | 1/9/2020 | 1/9/2020 | 1/9/2020 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 1/9/2020 | 1/9/2020 | 1/9/2020 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work complete, signature card not available at time of inspection.
Zack Phone #: ###-####
|
BLD-Aging Inspection | 11/27/2019 | 11/27/2019 | 12/4/2019 | | PASS |
Jim Storey
|
|
|
wip handrailling pending for final insp
|
BLD-Framing/Rough-in | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PART |
Jim Storey
|
|
|
Zach Phone #: ###-#### framing stairs and floor ok
|
BLD-Foundation | 6/27/2019 | 6/27/2019 | 6/27/2019 | P | PASS |
Jim Storey
|
|
|
Zach - suite 101- rebar inspection Phone #: ###-####
|
Print Occupancy Form | | | 6/17/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/17/2019 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 5/9/2019 | 5/9/2019 | 6/5/2019 | | PASS |
Carl Westfall
|
|
|
(1st done) 05/27/19 (L-3 - 15 days) (eplan - 9 sheets) All Valley Fire (routed to applicant)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/5/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/5/2019 | | DONE |
|
|
|
ALL MET
NEED
GC form
Revised Certificate of Value
|
Route to Impact Fee Review | 6/3/2019 | 6/6/2019 | 6/4/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 6/3/2019 | | 6/4/2019 | | PASS |
Carl Westfall
|
|
|
|
Routing Off Site - STRUCTURAL | 6/4/2019 | | 6/4/2019 | | PASS |
Carl Westfall
|
|
|
Chris Holladay (AHJ)
|
1st review completed | | | 6/3/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 6/3/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/3/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/9/2019 | | 6/3/2019 | | FAIL |
Carl Westfall
|
|
|
Structural did not approved the drawings
|
Routing Off Site - STRUCTURAL | 5/29/2019 | | 5/30/2019 | | FAIL |
Carl Westfall
|
|
|
Chris Holladay (AHJ)
|
Routing - FIRE | 5/9/2019 | 5/9/2019 | 5/28/2019 | | PASS |
Mark Scharfen
|
|
|
05.28.2019-completed fire review. Uploaded Rev_fire 05.28.2019.pdf. Passed review.
|
Routing - PLANNING | 5/9/2019 | | 5/10/2019 | | PASS |
David Moser
|
|
|
interior remodel - CUP06-00039
|
Routing - Addressing | 5/9/2019 | | 5/9/2019 | | PASS |
Doug Chausow
|
|
|
Suite 101
|
Routing - PUBLIC WORKS | 5/9/2019 | | 5/9/2019 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 5/7/2019 | | PASS |
|
|
|
|
Intake Approval | | | 5/2/2019 | | FAIL |
Joe Bruce
|
|
|
3) Form #310 “Statement of Special Inspections” was provided, but is not signed by the owner of record. It appears to be signed by Jeff Likes and not the owner. The owner has signed the registered design professional form. Please have the owner sign this document and upload.
|
Intake Approval | | | 5/1/2019 | | FAIL |
Joe Bruce
|
|
|
Please provide the additional items to complete your prescreen:
3) Form #310 “Statement of Special Inspections” was provided, but is not signed by the owner of record. It appears to be signed by Jeff Likes and not the owner. The owner has signed the registered design professional form. Please have the owner sign this document and upload. -
6) Form #310 - The revised (uploaded) document only includes the front page. All pages must be included when uploaded.
|
Intake Approval | | | 4/29/2019 | | FAIL |
Joe Bruce
|
|
|
Please provide the additional items to complete your prescreen:
3) Form #310 “Statement of Special Inspections” was provided, but is not signed by the owner of record. Provide a signature on this form by the owner.
4) No fire extinguishers could be located on the resubmittal. - Fire Extinguishers: Even though the fire extinguishers are existing, show their locations on the plan to verify code compliance. The added fire area of the mezzanine might require an additional fire extinguisher to be installed.
5) The lighting compliance certificate utilizes and old version of the IECC. The City of Boise has adopted the 2015 IECC. Revised the lighting compliance certificate to show the current code.
|
Intake Approval | | | 4/25/2019 | | FAIL |
Joe Bruce
|
|
|
Please provide the following to complete your prescreen:
1) Due to the structural scope of this the new mezzanine, this project will be routed as a #520 Major TI and will have a 20 working day review timeframe. The following additional items are required from the Major TI Submittal Checklist:
- Site Specific Fire Flow at the fire hydrant letter is required from Suez Water.
- Please submit your plans to ACHD for impact fee review. If no fees are due for this project scope, please email the letter from ACHD to me so I can upload this into the case. If fees are due, a receipt of the fee payment will need to be submitted at time of permit issuance.
2) Sheet G1.1 references the wrong mechanical code. The City of Boise has adopted the 2012 IMC. Revise drawings to show correct mechanical code or remove this code reference from the drawings.
3) Provide form #310 “Statement of Special Inspections” completed by the design engineer for the items noted in the structural notes which require a special inspector to perform inspection per chapter 17 of the 2015 IBC. (Concrete, Bolts, Steel, and Chemical Anchors)
4) Fire Extinguishers: Even though the fire extinguishers are existing, show their locations on the plan to verify code compliance. The added fire area of the mezzanine might require an additional fire extinguisher to be installed.
5) The switching requirements, daylight area switching, and automatic light control information could not be found on sheet A2.1. Provide a switching plan with occupancy/daylight sensors as required by section C405 of the 2015 IECC.
|
Application received | | | 4/16/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 16 2019 4:16PM
|