Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-01227
StatusFinaled
Name ABOVE ALL PLUMBING & CONTRACTING IN
Site Address 3525 W STATE ST
Project NamePigment hair salon T.I.
Customer Number 
ePlanReviewYes
Description
(PIGMENT) Permit to remodel an existing 1,306 sqft. business space. This building is not fire sprinkled. Work to include: demo select interior walls, new interior non-load bearing walls, 6 new hair stations, 3 new hair wash stations, 1 new accessible bathroom, 1 new reception desk, new structural beam see engineering, new RTU see engineering, mechanical work, electrical work, and plumbing work. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  3/2/2020 DONE
Print Statement  1/16/2020 DONE
Third Notice 11/30/201912/30/2019 DONE
mailed 1-1-20 with first follow up
First Follow up  12/30/2019 DONE
Third Notice 10/30/201911/25/2019 DONE
mailed 12-2-19
Third Notice 9/23/201910/25/2019 DONE
mailed 11-1-19
Second Notice 8/15/20199/18/2019 DONE
mailed 9-19-19
First Notice 8/9/20198/5/2019 DONE
mailed 8-5-2019
Print Occupancy Form  7/30/2019 DONE
Permanent Occupancy  7/30/2019 DONE
BLD-Final7/2/20197/3/20197/3/2019APASS
DetailsTony Young
kevin Phone #: ###-####,, ok for occupancy now
BLD-Final6/27/20196/28/20196/28/2019APART
DetailsTony Young
Kevin Phone #: ###-####,, temp occupancy ok,, needs floor elevations, remove dead bolts
FIRE-Final Inspection6/27/20196/28/20196/28/2019APASS
DetailsMark Scharfen
Passed fire life safety.

Kevin Phone #: ###-####
BLD-Final6/26/20196/27/20196/27/2019PNR
DetailsTony Young
Kevin Phone #: ###-####,, need trades ,, f/l/s
BLD-Framing/Rough-in6/13/20196/14/20196/14/2019APASS
DetailsTony Young
kevin Phone #: ###-####
Fees Due Hold6/11/2019 6/13/2019 DONE
DetailsGemma Flores
Permit Ready to Issue  5/31/2019 DONE
MET
Need ACHD (bldg4inspection@gmail.com)

MET
need GC
Need rev cert of val
Print Occupancy Form  5/31/2019 DONE
Issue PAID IN FULL permit  5/31/2019 DONE
Print Occupancy Form  5/31/2019 DONE
(F) Reprint permit  5/31/2019 DONE
Plan assigned to (M_H)5/2/2019 5/30/2019 DONE
DetailsMichael Hanson
1st review completed - 05/24 #520 ePlan - Pigment
Routing - PLAN CHECK5/30/2019 5/30/2019 PASS
DetailsMichael Hanson
Routing - Design Review5/30/2019 5/30/2019 PASS
DetailsJosh Wilson
PLANS/APPL TAKEN TO FRONT DESK  5/30/2019 DONE
DetailsMichael Hanson
Route to Impact Fee Review5/23/20195/26/20195/24/2019 PASS
DetailsKarina Myles
Review requested for Commercial Permit
Routing - FIRE5/2/20195/2/20195/23/2019 PASS
DetailsMark Scharfen
Completed fire review and uploaded rev_fire 05.23.2019.pdf
Routing - PLAN CHECK5/2/2019 5/23/2019 FAIL
DetailsMichael Hanson
See BLD plan review report in ePlan for corrections required.
1st review completed  5/23/2019 DONE
DetailsMichael Hanson
PRINT Activities  5/15/2019 DONE
Routing - PLUMBING5/2/2019 5/7/2019 PASS
DetailsDan Ediger
Per notes, plans and ISPC
Routing - MECHANICAL5/2/2019 5/3/2019 PASS
DetailsChad Schwendiman
Routing - Design Review5/2/2019 5/2/2019 FAIL
DetailsJosh Wilson
Ok to replace roof-top unit per Sheet A2.4... Sheet M-1 shows a new ground level unit... clarify this discrepancy
Routing - Addressing5/2/2019 5/2/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS5/2/2019 5/2/2019 PASS
DetailsMorgan Webb
Intake Approval  4/29/2019 PASS
Intake Approval  4/22/2019 FAIL
DetailsMichael Hanson
Provide information for new rooftop unit (size, operating weight, height, etc...)
Reply back with confirmation to delete current HVAC plan showing new unit on pad with ductwork up the outside of the building.
If the new RTU is larger in size than current it will require design review approval.
If the new RTU is heavier it will require structural analysis letter from structural engineer confirming current structural can support the additional weight.
Intake Approval  4/19/2019 FAIL
DetailsMichael Hanson
Provide planning and zoning approval letter for exterior mechanical work.
Provide site specific fire flow letter
Provide new structural engineering coversheet as stamp on current document is not legible.
Application received  4/17/2019 DONE
Application submitted via PDS Online on Apr 17 2019 2:43AM