Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-01233
StatusFinaled
Name CM COMPANY
Site Address 7009 W FRANKLIN RD
Project NameBishop Kelly High Kitchen
Customer Number 
ePlanReviewYes
Description
(BISHOP KELLY HIGH SCHOOL KITCHEN REMODEL) // 09/20/19 PLAN MOD TO REMOVE ALTERNATE #1 FROM PLANS. ACCESSIBLE UPGRADES TO SINGLE USER RESTROOM WILL BE COMPLETED IN PHASE II UNDER FUTURE PERMIT, BY 10/02/2020. SEE ATTACHED LETTER. JAR // Permit to remodel existing kitchen. Work to include: relocating cookline and hood; adding sinks; new walk in cooler and freezer; structural bracing to support new openings in masonry wall and roof top units; new lighting and power; mechanical work including new roof top units; plumbing; and new interior finishes in compliance with Ch. 8 of the 2015 IBC. Permit drawings include Bid Alternate #1. If this alternate is not accepted, revised drawings need to be submitted as a Plan Modification with Alternate #1 removed from plans. This is a scope of work permit only with a certificate of completion to be issued upon completion and approval of the project. This building is fully Fire Sprinklered for area increase and E occupancy with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 11/4/201911/4/2019 DONE
This permit finaled on the web by Jackie Phelps
First Notice10/21/201910/21/201910/25/2019 DONE
DetailsMike Jordan
mailed 11-1-19
BLD-Final10/18/201910/21/201910/21/2019APASS
DetailsMike Jordan
Can we please final our life fire safety now that the FA permit FIR19-00585 is finaled (revised drawings approved). Thank you. Phone #: ###-#### Inspection requested via web by Jackie Phelps
DOC - Permit Finaled10/21/201910/21/201910/21/2019PPASS
DetailsMike Jordan
FIRE-Final Inspection10/18/201910/21/201910/21/2019APASS
DetailsTroy Cobbley
Life safety passed. Thank you. Phone #: ###-#### Inspection requested via web by Jackie Phelps
FIRE-Final Inspection10/11/201910/15/201910/15/2019APART
DetailsTroy Cobbley
A temp for life safety is being given until the as-builts/plan mods are approved.

Thank you. Phone #: ###-#### Inspection requested via web by Jackie Phelps
FIRE-Alarm Testing10/11/201910/15/201910/15/2019ADONE
DetailsTroy Cobbley
See the project related fire alarm permit for specifics for the fire alarm testing.
BLD-Final10/11/201910/15/201910/15/2019APART
DetailsMike Jordan
Fire Alarm / Final inspections scheduled for 7 am Tuesday. Please come afterward. Thank you. Phone #: ###-#### Inspection requested via web by Jackie Phelps. OK for temp occ. Will be ok for perm occ. once fire signs perm.
BLD-Final10/11/201910/16/201910/11/2019ACANC
DetailsMike Jordan
Fire Alarm / Fire Final inspection scheduled for 7 AM Tuesday. Please come afterward. Thank you. Phone #: ###-#### >> Inspection requested via web by Jackie Phelps Inspection cancelled from web by: Jackie Phelps
FIRE-Final Inspection10/11/201910/16/201910/11/2019ACANC
DetailsTroy Cobbley
Please come first thing (7 am) so we can get done before school starts. We cant sound alarm when school in session. Thank you. Phone #: ###-#### >> Inspection requested via web by Jackie Phelps Inspection cancelled from web by: Jackie Phelps
FIRE-Alarm Testing10/11/201910/14/201910/11/2019ACANC
DetailsTroy Cobbley
Preferably before school opens if plan review is completed. Phone #: ###-#### >> Inspection requested via web by Jimmie Miller Inspection cancelled from web by: Jackie Phelps
BLD-Final10/11/201910/14/201910/11/2019PCANC
DetailsMike Jordan
Preferably before school opens if plan review is completed. Phone #: ###-#### >> Inspection requested via web by Jimmie Miller Inspection cancelled from web by: Jackie Phelps
FIRE-Final Inspection10/11/201910/14/201910/11/2019ACANC
DetailsTroy Cobbley
Preferably before school opens if plan review is completed. Phone #: ###-#### >> Inspection requested via web by Jimmie Miller Inspection cancelled from web by: Jackie Phelps
BLD-Final10/10/201910/11/201910/11/2019PCANC
DetailsBrandon Shaw
Preferably right after final life safety. Phone #: ###-#### Inspection requested via web by Jimmie Miller
FIRE-Final Inspection10/10/201910/11/201910/11/2019ANR
DetailsTroy Cobbley
No ready for life safety due to fire alarm resubmittal. Phone #: ###-#### Inspection requested via web by Jimmie Miller
CHANGE STATUS TO (ISS)  10/8/2019 DONE
plan mod
Plan assigned to (JAR)9/16/20199/16/201910/7/2019 DONE
DetailsJulie Romig
1st Rev Comp - Plan Mod Bishop Kelly HS Kitchen
Permit Ready to Issue  10/7/2019 DONE
Routing - PLAN CHECK10/7/2019 10/7/2019 PASS
DetailsJulie Romig
Accessible upgrades will be completed under future permit. Upgrades will include remodel of the single user restroom in Phase II, to be completed by 10/20/2020. See attached letter. *JAR*
Routing - PLAN CHECK9/17/2019 10/1/2019 FAIL
DetailsJulie Romig
Need Accessibility upgrade information
Routing - MECHANICAL9/17/2019 9/20/2019 PASS
DetailsTroy James
Routing - PLUMBING9/17/2019 9/19/2019 PASS
DetailsDaryl Spivey
May require RPBP on steamer.
Routing - PUBLIC WORKS9/17/2019 9/18/2019 PASS
DetailsMorgan Webb
NO CHANGE TO FEES
Plan Modification Accepted  9/16/2019 DONE
Alternate #1 that was in the original permit set will no longer be a part of the project and has been removed fromthe drawings. This scope of work includes revising the dry storage area, remodeling the existing single user restroom, replacing the dishwasher and replacing the walk-in freezer and refridgerator. Sheets: A0.01, A2.01, A2.11, A2.21, A2.31, A2.41, A3.22, A6.11, M1.11, M1.12, M2.12, M3.11, P1.10, P1.11, P2.11, E2.0D, E2.0MP, E2.0P, E2.0R, E3.2
BLD-Framing/Rough-in9/10/20199/11/20199/11/2019APASS
DetailsTell Riley
jimmie//SSC clips installed per RFI 027 for connection of box header//correction made per Mikes notes//
BLD-Framing/Rough-in9/5/20199/6/20199/6/2019APART
DetailsMike Jordan
Early as possible please. Phone #: ###-#### Inspection requested via web by Jimmie Miller. Steel stud framing and box headers for new openings. Needs to install SSC clips from bottom track to each stud. Contractor to fllow up with RFI approving the angle clips in leiu of HUC hangars for box header to jamb conections.
BLD-Framing/Rough-in9/5/20199/5/20199/5/2019PNR
DetailsJim Storey
Jimmy Phone #: ###-#### no one on site.
BLD-Wall cover8/22/20198/22/20198/22/2019PCANC
DetailsMike Jordan
Ross is on site contact through 8/27. ###-####. We are scheduled to sheetrock the ceiling tomorrow, insulation has been removed and replaced with new. RFI mentioned in early inspection comment has been sent. Please confirm If we need a re-inspection prior to cover. Thank you! Jackie Phelps ###-#### Phone #: ###-#### >> Inspection requested via web by Jackie Phelps Inspection cancelled from web by: Jackie Phelps
BLD-Framing/Rough-in8/16/20198/16/20198/16/2019PPASS
DetailsMike Jordan
Jimmy Phone #: ###-####. Interior steel stud furred walls for equipment chases. Also reviewed RFI for use of A35's.
BLD-Framing/Rough-in8/5/20198/5/20198/5/2019PPART
DetailsMike Jordan
Jimmie Phone #: ###-####. Additional 2x12 joist sistering to support new mech. equpment in kitchen. Need RFI for alternate attacment of A35 in lieu of the 2 inch bearing.
(F) Reprint permit  6/7/2019 DONE
Inspection Record Card- Bld  6/7/2019 DONE
Telephone call  6/6/2019 DONE
Emailed permit to signed to GC, davidm@cmcompany.com
Issue PAID IN FULL permit  6/6/2019 DONE
Emailed permit to signed
Inspection Record Card- Bld  6/6/2019 DONE
Plan assigned to (JAR)4/29/20194/29/20196/3/2019 DONE
DetailsJulie Romig
06/04 - 2nd Rev - 1st Rev Comp - L3 Bishop Kelly Kitchen Remodel
Routing - PLAN CHECK5/28/2019 6/3/2019 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  6/3/2019 DONE
Permit Ready to Issue  6/3/2019 DONE
MET (KKULM@ERSTADARCHITECTS.COM)
NOT PART OF BOISE SCHOOL DISTRICT; NO "CREDIT"
Need GC
Need rev cert of val
Route to Impact Fee Review5/23/20195/26/20195/23/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
1st review completed  5/23/2019 DONE
DetailsJulie Romig
Routing - FIRE4/29/20194/29/20195/22/2019 PASS
DetailsMark Scharfen
Completed review and uploaded rev_fire 05.22.2019.pdf. Passed review.
Routing - PLAN CHECK4/29/2019 5/22/2019 FAIL
DetailsJulie Romig
Refer to ePlanReview for required corrections
Routing PW Environmental4/29/2019 5/16/2019 PASS
DetailsRick Christenson
Routing - MECHANICAL4/29/2019 5/6/2019 PASS
DetailsTroy James
Routing - PLUMBING4/29/2019 4/30/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing Off Site - STRUCTURAL4/29/2019 4/30/2019 PASS
DetailsJulie Romig
Routing - PUBLIC WORKS4/29/2019 4/30/2019 PASS
DetailsMorgan Webb
WEST BOISE SEWER DISTRICT
Plan assigned to (JHB)4/29/20194/29/20194/29/2019 DEFR
DetailsJoe Bruce
05/22 - Bishop Kelly Cafeteria L-3
Routing - Addressing4/29/2019 4/29/2019 PASS
DetailsLaura Hunter
Intake Approval  4/25/2019 FAIL
DetailsJulie Romig
Need: 1. Architectural sheets are missing architect's stamp/signature. Please upload stamped/signed sheets.
2. The lower right corner of all drawings are to have a blank 4"x2" space located 3" off the right sheet edge for the city's stamp. Please upload all electrical sheets with this area left blank.
3. Mechanical COMcheck and heating & cooling load calcs are indicated on checklist, but were not found. Please upload Mechanical COMcheck and heating & cooling load calcs.
Plan Reviewer's activity  4/25/2019 DONE
DetailsJulie Romig
School Prescreen approved 4/25/19
Intake Approval  4/25/2019 PASS
Application received  4/17/2019 DONE
Application submitted via PDS Online on Apr 17 2019 9:29AM
Agreement of Future work10/7/201910/2/2020   
(BISHOP KELLEY HS) 20% Accessible Upgrade will be completed under future permit (Phase II). Upgrades will be to remodel the single user restroom for full accessibility. Work to be completed by 10/2/2020. See attached letter.