First Notice | | 7/10/2020 | 8/11/2020 | | DONE |
|
|
|
MAILED 8-14-2020
|
Print Occupancy Form | | | 6/30/2020 | | DONE |
|
|
|
|
Permanent Occupancy | | | 6/30/2020 | | DONE |
|
|
|
|
BLD-Final | 3/23/2020 | 3/24/2020 | 3/24/2020 | P | PASS |
Mike Jordan
|
|
|
Josh Phone #: ###-####. All issues have ben resolved. Ok for perm occ.
|
FIRE-Final Inspection | 3/23/2020 | 3/24/2020 | 3/24/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Josh Phone #: ###-####
|
FIRE-Conference | 2/4/2020 | 2/4/2020 | 2/4/2020 | P | DONE |
Troy Cobbley
|
|
|
I spoke to Eric about the need for Delta to get a FIR permit for their scope of work and have it inspected and finaled prior to the Temp expiring.
|
BLD-Final | 1/7/2020 | 1/8/2020 | 1/8/2020 | P | PART |
Mike Jordan
|
|
|
Eric Phone #: ###-####. Provide reflective surface for mirrors in restroom to 40 inches max above floor. Toilet flusher in mens restroom to be on turning side. Provide max 2ft. 10inch counter height in breakroom. Correction notice posted. Ok for temp occ.
|
FIRE-Final Inspection | 1/7/2020 | 1/8/2020 | 1/8/2020 | A | PART |
Jim Page
|
|
|
Previously noted iems have been corrected with exception to door hardware on exterior door and fire alarm corrections, A/V devices were changed but a different model was used, a fire alarm permit is required for fire alarm modifcations. Per conversation with Troy Cobbley, a 90 day TCO for life fire safety has been authorized by Ron Johnson. Signatures provided on permit sign off card for associated trades.
with Boise fireEric Phone #: ###-####
|
BLD-Final | 1/2/2020 | 1/3/2020 | 1/3/2020 | P | NR |
Mike Jordan
|
|
|
Erik Phone #: ###-####. Needs life/safety final first.
|
FIRE-Final Inspection | 1/2/2020 | 1/3/2020 | 1/3/2020 | P | FAIL |
Troy Cobbley
|
|
|
Repair two new exit signs, remove non-functional exit sign, provide exit discharge light at the west exit, provide approved single action hardware on one of the main exit door assemblies, repair fire alarm.
Erik Phone #: ###-####
|
BLD-Final | 12/31/2019 | 1/2/2020 | 1/2/2020 | P | NR |
Mike Jordan
|
|
|
Joshua Phone #: ###-####
|
FIRE-Final Inspection | 12/31/2019 | 1/2/2020 | 1/2/2020 | A | CANC |
Troy Cobbley
|
|
|
No inspection performed. The project related fire sprinkler and fire alarm permits need addressed.
Joshua Phone #: ###-####
|
BLD-Framing/Rough-in | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | PART |
Mike Jordan
|
|
|
Josh Phone #: ###-####. Interior steel stud framed walls and hardlids only. A correction notice was also issued noting that 18min. clearance is required at door 107 on the pull side to meet ADA.
|
Telephone call | | | 6/11/2019 | | DONE |
|
|
|
Emailed Applicant 302 to fill out and email back, so we can issue the permit.
|
Print Occupancy Form | | | 6/11/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/11/2019 | | DONE |
|
|
|
|
Routing - FIRE | 5/23/2019 | 5/23/2019 | 5/30/2019 | | PASS |
Mark Scharfen
|
|
|
05/30 MS Resubmittal review complete. Uploaded rev_fire 05.30.2019.pdf. Passed review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/30/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 5/30/2019 | | DONE |
|
|
|
NEED- MET
GC FORM
|
Plan assigned to (M_H) | 4/25/2019 | | 5/30/2019 | | DONE |
Michael Hanson
|
|
|
1st review completed - 05/20 #520 ePlan - Realty One
|
Routing - PLAN CHECK | 5/22/2019 | | 5/23/2019 | | PASS |
Michael Hanson
|
|
|
|
Route to Impact Fee Review | 5/16/2019 | 5/19/2019 | 5/17/2019 | | PASS |
Karina Myles
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 4/25/2019 | 4/25/2019 | 5/17/2019 | | FAIL |
Mark Scharfen
|
|
|
5/17/19-Completed IFC review. Uploaded rev_fire 05.17.2019.pdf and emailed applicant.
|
1st review completed | | | 5/16/2019 | | FAIL |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 4/25/2019 | | 5/16/2019 | | FAIL |
Michael Hanson
|
|
|
See building plan review for corrections required.
|
Routing - Addressing | 4/25/2019 | | 4/25/2019 | | PASS |
Doug Chausow
|
|
|
Suite 150/160 to be combined to use Suite #150
|
Routing - PUBLIC WORKS | 4/25/2019 | | 4/25/2019 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 4/23/2019 | | PASS |
|
|
|
|
Intake Approval | | | 4/19/2019 | | FAIL |
Julie Romig
|
|
|
Need structural calcs uploaded as indicated on checklist.
|
Application received | | | 4/17/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 17 2019 2:21PM
|
Second Notice | | 8/21/2020 | | | |
|
|
|
|