Permit Information
Permit NumberBLD19-01257
StatusFinaled
Name PORTER CHANDLER LLC
Site Address 4101 N CARTWRIGHT RD
Project NameHolman Residence
Customer Number 
ePlanReviewNo
Description
**HILLSIDE** **WUI FOOTHILLS ZONE A** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 4094 sq. ft., two story (first story 3059 sq. ft., second story 1035 sq. ft.) single family dwelling with 5 bedrooms, 3 bathrooms, approximately 619 sq. ft. of covered patio/porch and a 1834 sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning. JJN
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/11/201912/12/201912/12/2019PPASS
DetailsTony Young
Loyd Phone #: ###-####
DOC - Permit Finaled12/12/201912/12/201912/12/2019PPASS
DetailsTony Young
c of o issued
BLD-Final12/11/201912/11/201912/11/2019PNR
DetailsTony Young
Loyd Phone #: ###-####,, needs egress,, handrail per code, fire caulking,, seal exterior doors as needed
BLD-Final12/10/201912/11/201912/11/2019ADEFR
DetailsTony Young
Loyd Phone #: ###-####.. defr to pm
PubWorks Occupancy Approval12/10/201912/10/201912/10/2019 DONE
DetailsMelissa Jannusch
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Conference12/3/201912/3/201912/3/2019PPART
DetailsTony Young
Loyd Phone #: ###-####,, conf on final
BLD-Energy code compliance9/26/20199/27/20199/27/2019PPASS
DetailsTony Young
Loyd Phone #: ###-####
BLD-Framing/Rough-in9/27/20199/27/20199/27/2019APASS
DetailsTony Young
Loyd Phone #: ###-####
BLD-Energy code compliance9/27/20199/27/20199/27/2019APASS
DetailsTony Young
Loyd Phone #: ###-####
BLD-Framing/Rough-in9/18/20199/19/20199/19/2019APART
DetailsTony Young
call for access about 20 mins- Lloyd Phone #: ###-####// ok to insulate,, needs one more sprinkler inspection// minor frame corrections,, straps, blocking,, justify venting,, needs soffit protection on can lights
BLD-Wall Bracing8/7/20198/8/20198/8/2019APASS
DetailsTell Riley
LOYD Phone #: ###-####//shear nailing ok on exterior walls//crew is working on interior (garage) shear wall-check blocking at framing//
BLD-Foundation6/19/20196/20/20196/20/2019APASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing6/17/20196/18/20196/18/2019APASS
DetailsBrandon Shaw
Work in progress...
PubWorks Subgrade Approval6/13/20196/13/20196/13/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  6/5/2019 DONE
OVERRIDE  6/4/2019  
OVERRIDE  6/4/2019  
Plan assigned to (J_N)5/8/20195/8/20196/4/2019 DONE
DetailsJenny Nelson
05/27 sfd L2 ePlan. 1st complete 5/23 - waiting for fire review. need WUI soffit detail, clarify structural calculations.
Case Summary (BLD)  6/4/2019 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  6/4/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  6/4/2019 DONE
met
Inspection Record Card- Bld  6/4/2019 DONE
Telephone call  6/4/2019 DONE
Spoke with lloyd informing him permit is ready and fee amount due
Routing PW Grading-Hillside5/28/2019 6/3/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Routing - PLANNING6/3/2019 6/3/2019 PASS
DetailsKarla Nelson
Plans submitted May 23, 2019 show a paved driveway and are approved.
Routing - PUBLIC WORKS5/28/2019 6/3/2019 PASS
DetailsAngela Hardy
Routing - FIRE5/28/20195/28/20195/31/2019 PASS
DetailsMark Scharfen
06/04-4101 N Carwright Resubmittal. passed review, 30' protection shown. MS
Routing - MECHANICAL5/28/2019 5/29/2019 PASS
DetailsTroy James
Plan resubmittals received  5/28/2019 DONE
two copies of fire code permit plan review and two copies of sheets 1.0 of 1 taken to jenny
Routing - FIRE5/23/2019 5/24/2019 FAIL
DetailsMark Scharfen
05.24.2019-completed fire review and uploaded rev_fire 05.24.2019.pdf and emailed applicant.
1st review completed  5/24/2019 DONE
DetailsJenny Nelson
Routing - PLAN CHECK5/24/2019 5/24/2019 PASS
DetailsJenny Nelson
Routing - Erosion and Sediment5/23/2019 5/23/2019 PASS
DetailsAndy J. Long
ESC plan approved. Certified plan designer and onsite Responsible Person provided. Site preparation inspection at beginning of project is REQUIRED.
Plan resubmittals received  5/23/2019 DONE
Three copies of Materials testing & inspection letter and three copies of sheet 1.0 of 1 taken to jenny
Routing - PLAN CHECK  5/23/2019 FAIL
DetailsJenny Nelson
Need WUI compliant soffit detail, clarify shear calcs
Routing - MECHANICAL  5/23/2019 FAIL
Emailed corrections to hiram manual j designer
Routing - PLANNING5/21/2019 5/22/2019 FAIL
DetailsKarla Nelson
The driveway cannot be gravel, it needs to be paved with a hard surface. The width cannot exceed 33' in the front setback. All conditions of Public Works and Fire from CFH19-00030 also need to be complied with.
Routing PW Grading-Hillside5/13/2019 5/21/2019 FAIL
DetailsMelissa Jannusch
see e-mail to applicant
Routing - PUBLIC WORKS  5/21/2019 FAIL
Failed Hillside
Routing - Addressing5/8/2019 5/10/2019 PASS
DetailsDoug Chausow
Route to Impact Fee Review5/8/20195/11/20195/9/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Intake Approval  5/8/2019 FAIL
ALL MET-Need 3rd copy of grading and 2 copies Erosion large plan
Plans ACCEPTED BY PLAN TECH  5/8/2019 DONE
Recd Pcfee & Taken To Pln CK  5/8/2019 DONE
Intake Approval  5/8/2019 PASS
Application received 4/18/2019