BLD-Final | 12/11/2019 | 12/12/2019 | 12/12/2019 | P | PASS |
Tony Young
|
|
|
Loyd Phone #: ###-####
|
DOC - Permit Finaled | 12/12/2019 | 12/12/2019 | 12/12/2019 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | NR |
Tony Young
|
|
|
Loyd Phone #: ###-####,, needs egress,, handrail per code, fire caulking,, seal exterior doors as needed
|
BLD-Final | 12/10/2019 | 12/11/2019 | 12/11/2019 | A | DEFR |
Tony Young
|
|
|
Loyd Phone #: ###-####.. defr to pm
|
PubWorks Occupancy Approval | 12/10/2019 | 12/10/2019 | 12/10/2019 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Conference | 12/3/2019 | 12/3/2019 | 12/3/2019 | P | PART |
Tony Young
|
|
|
Loyd Phone #: ###-####,, conf on final
|
BLD-Energy code compliance | 9/26/2019 | 9/27/2019 | 9/27/2019 | P | PASS |
Tony Young
|
|
|
Loyd Phone #: ###-####
|
BLD-Framing/Rough-in | 9/27/2019 | 9/27/2019 | 9/27/2019 | A | PASS |
Tony Young
|
|
|
Loyd Phone #: ###-####
|
BLD-Energy code compliance | 9/27/2019 | 9/27/2019 | 9/27/2019 | A | PASS |
Tony Young
|
|
|
Loyd Phone #: ###-####
|
BLD-Framing/Rough-in | 9/18/2019 | 9/19/2019 | 9/19/2019 | A | PART |
Tony Young
|
|
|
call for access about 20 mins- Lloyd Phone #: ###-####// ok to insulate,, needs one more sprinkler inspection// minor frame corrections,, straps, blocking,, justify venting,, needs soffit protection on can lights
|
BLD-Wall Bracing | 8/7/2019 | 8/8/2019 | 8/8/2019 | A | PASS |
Tell Riley
|
|
|
LOYD Phone #: ###-####//shear nailing ok on exterior walls//crew is working on interior (garage) shear wall-check blocking at framing//
|
BLD-Foundation | 6/19/2019 | 6/20/2019 | 6/20/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 6/17/2019 | 6/18/2019 | 6/18/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
PubWorks Subgrade Approval | 6/13/2019 | 6/13/2019 | 6/13/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 6/5/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 6/4/2019 | | |
|
|
|
|
OVERRIDE | | | 6/4/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 5/8/2019 | 5/8/2019 | 6/4/2019 | | DONE |
Jenny Nelson
|
|
|
05/27 sfd L2 ePlan. 1st complete 5/23 - waiting for fire review. need WUI soffit detail, clarify structural calculations.
|
Case Summary (BLD) | | | 6/4/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/4/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 6/4/2019 | | DONE |
|
|
|
met
|
Inspection Record Card- Bld | | | 6/4/2019 | | DONE |
|
|
|
|
Telephone call | | | 6/4/2019 | | DONE |
|
|
|
Spoke with lloyd informing him permit is ready and fee amount due
|
Routing PW Grading-Hillside | 5/28/2019 | | 6/3/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - PLANNING | 6/3/2019 | | 6/3/2019 | | PASS |
Karla Nelson
|
|
|
Plans submitted May 23, 2019 show a paved driveway and are approved.
|
Routing - PUBLIC WORKS | 5/28/2019 | | 6/3/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - FIRE | 5/28/2019 | 5/28/2019 | 5/31/2019 | | PASS |
Mark Scharfen
|
|
|
06/04-4101 N Carwright Resubmittal. passed review, 30' protection shown. MS
|
Routing - MECHANICAL | 5/28/2019 | | 5/29/2019 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 5/28/2019 | | DONE |
|
|
|
two copies of fire code permit plan review and two copies of sheets 1.0 of 1 taken to jenny
|
Routing - FIRE | 5/23/2019 | | 5/24/2019 | | FAIL |
Mark Scharfen
|
|
|
05.24.2019-completed fire review and uploaded rev_fire 05.24.2019.pdf and emailed applicant.
|
1st review completed | | | 5/24/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 5/24/2019 | | 5/24/2019 | | PASS |
Jenny Nelson
|
|
|
|
Routing - Erosion and Sediment | 5/23/2019 | | 5/23/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certified plan designer and onsite Responsible Person provided. Site preparation inspection at beginning of project is REQUIRED.
|
Plan resubmittals received | | | 5/23/2019 | | DONE |
|
|
|
Three copies of Materials testing & inspection letter and three copies of sheet 1.0 of 1 taken to jenny
|
Routing - PLAN CHECK | | | 5/23/2019 | | FAIL |
Jenny Nelson
|
|
|
Need WUI compliant soffit detail, clarify shear calcs
|
Routing - MECHANICAL | | | 5/23/2019 | | FAIL |
|
|
|
Emailed corrections to hiram manual j designer
|
Routing - PLANNING | 5/21/2019 | | 5/22/2019 | | FAIL |
Karla Nelson
|
|
|
The driveway cannot be gravel, it needs to be paved with a hard surface. The width cannot exceed 33' in the front setback. All conditions of Public Works and Fire from CFH19-00030 also need to be complied with.
|
Routing PW Grading-Hillside | 5/13/2019 | | 5/21/2019 | | FAIL |
Melissa Jannusch
|
|
|
see e-mail to applicant
|
Routing - PUBLIC WORKS | | | 5/21/2019 | | FAIL |
|
|
|
Failed Hillside
|
Routing - Addressing | 5/8/2019 | | 5/10/2019 | | PASS |
Doug Chausow
|
|
|
|
Route to Impact Fee Review | 5/8/2019 | 5/11/2019 | 5/9/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Intake Approval | | | 5/8/2019 | | FAIL |
|
|
|
ALL MET-Need 3rd copy of grading and 2 copies Erosion large plan
|
Plans ACCEPTED BY PLAN TECH | | | 5/8/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/8/2019 | | DONE |
|
|
|
|
Intake Approval | | | 5/8/2019 | | PASS |
|
|
|
|
Application received | | 4/18/2019 | | | |
|
|
|
|