Print Statement | | | 8/13/2019 | | DONE |
|
|
|
|
First Notice | | 7/19/2019 | 8/2/2019 | | DONE |
|
|
|
mailed 8/5/19
|
BLD-Final | 7/8/2019 | 7/9/2019 | 7/9/2019 | P | PASS |
Mike Jordan
|
|
|
LANCE Phone #: ###-####. OK for perm occ.
|
FIRE-Final Inspection | 7/8/2019 | 7/9/2019 | 7/9/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. If intermediate door is installed single action hardware is to be provided.
LANCE Phone #: ###-####
|
Permanent Occupancy | | | 7/9/2019 | | DONE |
|
|
|
|
BLD-Ceiling Grid Inspection | 7/3/2019 | 7/5/2019 | 7/5/2019 | A | PART |
Tell Riley
|
|
|
Lance Phone #: ###-####//remove old lights above grid//add cover to junction box//grid ties ok//
|
FIRE-Final Inspection | 7/5/2019 | 7/5/2019 | 7/5/2019 | P | FAIL |
Troy Cobbley
|
|
|
Provide exit discharge lights at both exits as per the approved plans, repair the emergency light over the sink, provide single action hardware at the interior south facing exit door, provide mounted and tagged fire extinguisher as discussed.
Lance Phone #: ###-####
|
BLD-Other | 6/24/2019 | 6/24/2019 | 6/24/2019 | P | PASS |
Mike Jordan
|
|
|
Nathan (GC)-smoke barriers in ceiling Phone #: ###-####. Draft stop ok.
|
CHANGE STATUS TO (ISS) | | | 6/21/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/21/2019 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 6/17/2019 | 6/17/2019 | 6/20/2019 | | DONE |
Julie Romig
|
|
|
06/21 - Plan Mod Crumbl Cookie
|
Routing - PLAN CHECK | 6/17/2019 | | 6/20/2019 | | PASS |
Julie Romig
|
|
|
|
Permit Ready to Issue | | | 6/20/2019 | | DONE |
|
|
|
plan mod approved- fees due
DO NOT REISSUE
|
Print Occupancy Form | | | 6/20/2019 | | DONE |
|
|
|
|
Telephone call | | | 6/20/2019 | | DONE |
|
|
|
Spoke with Laken to inform her the plan mod is ready and what fees are due
|
Plan Modification Accepted | | | 6/17/2019 | | DONE |
|
|
|
To show the correct work that has been done for mechanical. sheets MP0.1, MP1.1, MP5.1, MP6.1, MP7.1, MP7.2, MP7.3 and MP7.4 taken to Julie
|
Routing - MECHANICAL | 6/17/2019 | | 6/17/2019 | | PASS |
Troy James
|
|
|
Revised RTU orientation on roof and duct sizes.
|
CHANGE STATUS TO (ISS) | | | 5/30/2019 | | DONE |
|
|
|
plan mod
|
Plan assigned to (JAR) | 5/21/2019 | 5/21/2019 | 5/28/2019 | | DONE |
Julie Romig
|
|
|
05/28 - Plan Mod Crumbl Cookie
|
Routing - PLAN CHECK | 5/21/2019 | | 5/28/2019 | | PASS |
Julie Romig
|
|
|
|
Permit Ready to Issue | | | 5/28/2019 | | DONE |
|
|
|
|
Telephone call | | | 5/28/2019 | | DONE |
|
|
|
spoke with Laken informing her that the plan mod is ready to be picked up and the fee amount due.
|
Plan resubmittals received | | | 5/21/2019 | | DONE |
|
|
|
Approved for open ceiling and wanting to change to a drop ceiling. One copy of comchekc with Two copies of cover sheet, A1.1, A6.1, A7.4, MP1.1, E1.1 and E6.1. taken to Julie
|
BLD-Framing/Rough-in | 5/14/2019 | 5/14/2019 | 5/14/2019 | P | PASS |
Mike Jordan
|
|
|
All fra ming issues regarding rated wall have been resolved.
|
BLD-Conference | 5/14/2019 | 5/14/2019 | 5/14/2019 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 5/13/2019 | 5/14/2019 | 5/14/2019 | P | CANC |
Mike Jordan
|
|
|
Call for lockbox combo // Lance Phone #: ###-####
|
BLD-Conference | 5/10/2019 | 5/13/2019 | 5/13/2019 | A | PART |
Mike Jordan
|
|
|
Lance Phone #: ###-####. Interior steel stud framed walls only ok, pending electrical rough in inspection. All patch backs in 2hr. fire wall shall be attched to framing members. provide membrane penetration protection in 2hr. fire wall. Correction notice posted.
|
Issue PAID IN FULL permit | | | 5/9/2019 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 4/18/2019 | 4/18/2019 | 5/8/2019 | | DONE |
Julie Romig
|
|
|
05/10 - 2nd Rev - 1st Rev Comp - L2 Crumbl Cookie
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/8/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/8/2019 | | DONE |
|
|
|
MET
NEED
Letter from Parcel owner/their agent
GC Form (filled out my tenant)
|
Print Occupancy Form | | | 5/8/2019 | | DONE |
|
|
|
|
Telephone call | | | 5/8/2019 | | DONE |
|
|
|
called Laken to let know permit is ready-she knows she needs the parcel owners letter if she is going to be the GC
|
Routing - PLAN CHECK | 5/7/2019 | | 5/8/2019 | | PASS |
Julie Romig
|
|
|
|
Plan resubmittals received | | | 5/7/2019 | | DONE |
|
|
|
Plan resubmittal received. 2 copies of sheet MP6.1
|
Routing - MECHANICAL | 5/7/2019 | | 5/7/2019 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 5/6/2019 | | 5/7/2019 | | FAIL |
Troy James
|
|
|
Talked to mechanical engineer. She will revise mechanical sheet and resubmit.
|
Plan resubmittals received | | | 5/6/2019 | | DONE |
|
|
|
Two copies of plan sheets A1.1, A6.1, A7.1, MP1.1, MP5.1, MP6.1, E1.1 and E6.1. Taken to Julie
|
Route to Impact Fee Review | 5/1/2019 | 5/4/2019 | 5/2/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 4/30/2019 | | 5/1/2019 | | FAIL |
Julie Romig
|
|
|
Plan review report emailed to architect
|
1st review completed | | | 5/1/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing - MECHANICAL | | | 4/30/2019 | | FAIL |
Troy James
|
|
|
Called applicant and talked to owner. Owner will provide to me the specs for the ovens.
|
Routing - PUBLIC WORKS | 4/18/2019 | | 4/29/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Environmental | 4/25/2019 | | 4/29/2019 | | PASS |
Rick Christenson
|
|
|
|
Routing - Addressing | 4/18/2019 | | 4/22/2019 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/18/2019 | | DONE |
|
|
|
|
Intake Approval | | | 4/18/2019 | | PASS |
Julie Romig
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/18/2019 | | DONE |
|
|
|
|
Application received | | 4/18/2019 | | | |
|
|
|
|