BLD-Final | 3/10/2020 | 3/10/2020 | 3/10/2020 | P | PASS |
Tony Young
|
|
|
Todd Phone #: ###-####
|
DOC - Permit Finaled | 3/10/2020 | 3/10/2020 | 3/10/2020 | P | PASS |
Tony Young
|
|
|
c/n made ok,, guard rail meets code with solid// c of o issued
|
BLD-Final | 1/16/2020 | 1/17/2020 | 1/21/2020 | P | PEND |
Tony Young
|
|
|
Todd Phone #: ###-####
|
BLD-Blower Door Test Results | 1/16/2020 | 1/17/2020 | 1/17/2020 | P | DONE |
Tony Young
|
|
|
Todd Phone #: ###-####/// 4.3
|
BLD-Ceiling Grid Inspection | 1/16/2020 | 1/16/2020 | 1/16/2020 | P | NR |
Tony Young
|
|
|
Todd Phone #: ###-####,, needs trades,, fall protection on upstairs windows w/in 24", fire caulking,, cable guard rail engineering letter
|
BLD-Energy code compliance | 8/12/2019 | 8/12/2019 | 8/13/2019 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Rutherford
|
BLD-Energy code compliance | 8/9/2019 | 8/12/2019 | 8/12/2019 | A | FAIL |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Rutherford// needs 6 sided coverage on insulation
|
BLD-Wall cover | 8/9/2019 | 8/9/2019 | 8/9/2019 | P | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Rutherford,, insulation work in progress,, not ready
|
BLD-Framing/Rough-in | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Rutherford,, ok to insulate,, some corrections needed,, listed out on truss engineering
|
BLD-Framing/Rough-in | 7/30/2019 | 7/31/2019 | 7/31/2019 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Rutherford. Needs mech. permit and rough in inspection.
|
BLD-Wall Bracing | 7/16/2019 | 7/17/2019 | 7/17/2019 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Rutherford
|
BLD-Footing | 5/6/2019 | 5/7/2019 | 5/7/2019 | P | PASS |
Jim Sly
|
|
|
We need inspection around 3:30-4, if possible. Phone #: ###-#### Inspection requested via web by Todd Rutherford
|
Issue PAID IN FULL permit | | | 5/2/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/2/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/2/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 4/29/2019 | | |
|
|
|
|
Routing - FIRE | 4/29/2019 | 4/29/2019 | 4/29/2019 | | PASS |
Lee G Meredith
|
|
|
Fire flow and driveway meet minimum requirements. No sprinklers required.
|
Plan assigned to (J_N) | 4/23/2019 | 4/23/2019 | 4/29/2019 | | DONE |
Jenny Nelson
|
|
|
05/02 sfd L1 ePlan. 1st complete, failed fire
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/29/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 4/29/2019 | | DONE |
|
|
|
|
Routing - FIRE | 4/23/2019 | 4/23/2019 | 4/24/2019 | | FAIL |
Lee G Meredith
|
|
|
05/02 5041 N Pierce Park Ln. residential fire review.
Access distance exceeds maximum allowed. Applicant to provide a fire flow availability report from SUEZ.
|
1st review completed | | | 4/24/2019 | | FAIL |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 4/19/2019 | | 4/24/2019 | | PASS |
Jenny Nelson
|
|
|
|
Plan assigned to (RDP) | 4/19/2019 | 4/19/2019 | 4/23/2019 | | DEFR |
Rob Patrick
|
|
|
05/02 sfd L1 ePlan
|
Routing - MECHANICAL | 4/19/2019 | | 4/23/2019 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 4/19/2019 | 4/22/2019 | 4/22/2019 | | PASS |
Karina Myles
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 4/19/2019 | | 4/22/2019 | | PASS |
Ethan Mansfield
|
|
|
|
Routing - Addressing | 4/19/2019 | | 4/22/2019 | | PASS |
Doug Chausow
|
|
|
|
Application received | | | 4/19/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 19 2019 10:40AM
|
Plans ACCEPTED BY PLAN TECH | | | 4/19/2019 | | DONE |
|
|
|
|
Intake Approval | | | 4/19/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/19/2019 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 4/19/2019 | | 4/19/2019 | | PASS |
Morgan Webb
|
|
|
|