BLD-Final | 10/8/2019 | 10/8/2019 | 10/8/2019 | P | PASS |
Dave Hannah
|
|
|
Josiah- please call prior Phone #: ###-####
|
DOC - Permit Finaled | 10/8/2019 | 10/8/2019 | 10/8/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 10/4/2019 | 10/4/2019 | 10/8/2019 | P | PEND |
Dave Hannah
|
|
|
as late as possible.. call when on the way // josiah Phone #: ###-####
|
BLD-Energy code compliance | 7/26/2019 | 7/26/2019 | 7/27/2019 | P | PASS |
Dave Hannah
|
|
|
Joshia-as late as possible Phone #: ###-####
|
BLD-Framing/Rough-in | 7/25/2019 | 7/25/2019 | 7/25/2019 | P | PASS |
Dave Hannah
|
|
|
DJosiah Phone #: 2###-####
|
BLD-Wall Bracing | 6/24/2019 | 6/24/2019 | 6/26/2019 | P | PASS |
Dave Hannah
|
|
|
Josiah Phone #: ###-####
|
BLD-Foundation | 5/24/2019 | 5/24/2019 | 5/28/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Other | 5/23/2019 | 5/24/2019 | 5/24/2019 | A | PASS |
Dave Hannah
|
|
|
Josiah- wall stem inspection and please go in the early afternoon, thank you. Phone #: ###-####
|
BLD-Footing | 5/22/2019 | 5/23/2019 | 5/23/2019 | P | PASS |
Dave Hannah
|
|
|
early if possible // josiah Phone #: ###-####
|
Routing Walk-In (Zoning) | 4/30/2019 | 4/30/2019 | 4/30/2019 | A | PASS |
KayCee Babb
|
|
|
Per drawings updated 4-30-19 with DRH19-00138.
|
Routing Walk-In (BLD) | 4/30/2019 | 4/30/2019 | 4/30/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/30/2019 | | 4/30/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 4/30/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/30/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/30/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 4/30/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/30/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 4/22/2019 | 4/22/2019 | 4/22/2019 | A | FAIL |
KayCee Babb
|
|
|
Appeal period ends 5pm on 4/26.
|
Routing Walk-In (BLD) | 4/22/2019 | 4/22/2019 | 4/22/2019 | A | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 4/22/2019 | | 4/22/2019 | | FAIL |
Josh Bogle
|
|
|
missing braced walls, headers, deck structure
|
1st review completed | | | 4/22/2019 | | FAIL |
Josh Bogle
|
|
|
|
Zoning Approval | 10/4/2019 | 10/4/2019 | | | PASS |
KayCee Babb
|
|
|
Material compliance verified through order sheets provided to Staff on 10-4-19.
|
Application received | | 4/22/2019 | | | |
|
|
|
|