BLD-Final | 9/5/2019 | 9/6/2019 | 9/6/2019 | P | PASS |
Tell Riley
|
|
|
I am working on Friday but will be home after 2:30 Phone #: ###-#### Inspection requested via web by Ron MacCulloch/ok to final per Tom for Electrical//final complete//
|
DOC - Permit Finaled | 9/6/2019 | 9/6/2019 | 9/6/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Conference | 7/19/2019 | 7/22/2019 | 7/22/2019 | P | PASS |
Tell Riley
|
|
|
Looking for a quick inspection on the framing of my second small roof before I cover and shingle. I am having minor finger surgery at 1:00 so I am hoping the inspection could be after 3:00 but I could be home earlier. Inspection requested via web by Ron MacCulloch//framing ok//will add truss brace//sheat walls//
|
BLD-Conference | 7/19/2019 | 7/22/2019 | 7/19/2019 | P | CANC |
Tell Riley
|
|
|
Looking for inspection and approval of the framing of my second small roof before I cover and shingle. Phone #: ###-#### >> Inspection requested via web by Ron MacCulloch Inspection cancelled from web by: Ron MacCulloch Inspection cancelled from web by: Ron MacCulloch
|
BLD-Wall Bracing | 6/27/2019 | 6/27/2019 | 6/27/2019 | A | PASS |
Tell Riley
|
|
|
Wall bracing ok per plans//
|
BLD-Conference | 6/26/2019 | 6/27/2019 | 6/27/2019 | A | CANC |
Tell Riley
|
|
|
Looking for a preliminary sheer and framing inspection. As early as available on Thursday morning. Phone #: ###-#### Inspection requested via web by Ron MacCulloch
|
BLD-Conference | 6/6/2019 | 6/7/2019 | 6/7/2019 | P | DONE |
Brandon Shaw
|
|
|
Looking for a final framing consult before I install beams and OSB on Friday night that require Portal frame nailing as It would be difficult to fix anything once this nailing has been completed. I will be available all afternoon but the earlier I the afternoon the better. I would also like to review the overall project with the new inspector that replaced Jim Sly as they will be the inspector for the balance of my project Inspection requested via web by Ron MacCulloch
|
BLD-Conference | 5/30/2019 | 5/31/2019 | 5/31/2019 | P | DONE |
Brandon Shaw
|
|
|
I am looking for a framing consult meeting before I start framing Phone #: ###-#### Inspection requested via web by Ron MacCulloch
|
BLD-Conference | 5/6/2019 | 5/6/2019 | 5/7/2019 | P | PASS |
Jim Sly
|
|
|
Footing inspection. anytime after 12:00 but early afternoon would be great Inspection requested via web by Ron MacCulloch Footing and walls.....OK.
|
BLD-Conference | 5/2/2019 | 5/3/2019 | 5/3/2019 | A | PASS |
Jim Sly
|
|
|
Need footing inspection. Anytime Friday morning after 9:00 am would be perfect. May try and have footing pored on Friday afternoon if Concrete contractor is able to finish other job in time Phone #: ###-#### Inspection requested via web by Ron MacCulloch
|
BLD-Conference | 4/30/2019 | 5/1/2019 | 5/1/2019 | A | DONE |
Jim Sly
|
|
|
Ron Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/26/2019 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 4/22/2019 | 4/22/2019 | 4/24/2019 | | PASS |
Josh Bogle
|
|
|
4/26 patio cover, ePlan
|
Routing - PLAN CHECK | 4/22/2019 | | 4/24/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 4/24/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/2019 | | DONE |
Josh Bogle
|
|
|
ESc no - Energy no
|
Permit Ready to Issue | | | 4/24/2019 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 4/23/2019 | | DONE |
Josh Bogle
|
|
|
emailed architect asking for engineering calc pages
|
Application received | | | 4/22/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 22 2019 12:22PM
|
Plans ACCEPTED BY PLAN TECH | | | 4/22/2019 | | DONE |
|
|
|
|
Intake Approval | | | 4/22/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/22/2019 | | DONE |
|
|
|
|
Routing - PLANNING | 4/22/2019 | | 4/22/2019 | | PASS |
Sue Cummings
|
|
|
|