BLD-Blower Door Test Results | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | DONE |
Tell Riley
|
|
|
4.0 ACH 40
1594 CFM @ 50 pa
|
BLD-Final | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | PASS |
Tell Riley
|
|
|
Bobby Phone #: ###-####//corrections made//
|
DOC - Permit Finaled | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | NR |
Tell Riley
|
|
|
Bobby Phone #: ###-####//spoke with contact//will call in for monday inspection//
|
BLD-Energy code compliance | 6/26/2019 | 6/28/2019 | 6/28/2019 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Blackwell//corrections made to framing//
|
BLD-Framing/Rough-in | 6/26/2019 | 6/27/2019 | 6/27/2019 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Todd Blackwell//add truss bracing-circled in red on truss prints//fill hole under tub/shower// ok to insulate only//
|
BLD-Energy code compliance | 6/25/2019 | 6/27/2019 | 6/26/2019 | A | CANC |
Tell Riley
|
|
|
Todd Phone #: ###-#### Inspection cancelled from web by: Todd Blackwell
|
BLD-Framing/Rough-in | 6/25/2019 | 6/26/2019 | 6/26/2019 | A | NR |
Tell Riley
|
|
|
TODD Phone #: ###-####//fire sprinkler inspection did not pass//call ro re-inspction once fire has signed off//
|
BLD-Framing/Rough-in | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | CANC |
Brandon Shaw
|
|
|
Todd Phone #: ###-####
|
BLD-Wall Bracing | 6/6/2019 | 6/11/2019 | 6/11/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress... Nail all exterior sheathing to sill plate...
|
BLD-Foundation | 5/22/2019 | 5/22/2019 | 5/22/2019 | P | PASS |
Jim Sly
|
|
|
Bryan Phone #: ###-####
|
BLD-Wall Bracing | 5/17/2019 | 5/21/2019 | 5/21/2019 | A | NR |
Jim Sly
|
|
|
Brian Phone #: ###-####
|
BLD-Footing | 5/15/2019 | 5/16/2019 | 5/16/2019 | A | PASS |
Jim Sly
|
|
|
Brian Phone #: ###-####
|
BLD-Foundation | 5/8/2019 | 5/8/2019 | 5/8/2019 | P | CANC |
Jim Sly
|
|
|
Brian Phone #: ###-####
|
BLD-Footing | 5/6/2019 | 5/7/2019 | 5/7/2019 | A | PASS |
Jim Sly
|
|
|
Brian Phone #: ###-####
|
Inspection Record Card- Bld | | | 5/6/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/6/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 5/2/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 4/24/2019 | 4/24/2019 | 5/2/2019 | | DONE |
Rob Patrick
|
|
|
05/06 sfd L1 ePlan
|
Routing - PLAN CHECK | 4/25/2019 | | 5/2/2019 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 5/2/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/2/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 5/2/2019 | | DONE |
|
|
|
|
Routing - FIRE | 4/25/2019 | 4/25/2019 | 4/26/2019 | | PASS |
Lee G Meredith
|
|
|
05/07-8743 W Shellie Ln Residential Fire LM
Sprinklers are required due to a long driveway that creates excessive access distance and exceeds the maximum allowance of 150 ft. Cover sheet notes that sprinklers are required.
|
Route to Impact Fee Review | 4/23/2019 | 4/26/2019 | 4/24/2019 | | PASS |
Karina Myles
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plan assigned to (M_H) | 4/23/2019 | | 4/24/2019 | | DEFR |
Michael Hanson
|
|
|
|
Routing - MECHANICAL | 4/23/2019 | | 4/24/2019 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 4/23/2019 | | 4/24/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Addressing | 4/23/2019 | | 4/23/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PLANNING | 4/23/2019 | | 4/23/2019 | | PASS |
Sue Cummings
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/23/2019 | | DONE |
|
|
|
|
Intake Approval | | | 4/23/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/23/2019 | | DONE |
|
|
|
|
Application received | | | 4/22/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 22 2019 2:34PM
|