First Notice | | 11/22/2019 | 11/26/2019 | | DONE |
|
|
|
mailed 12-2-19
|
Permanent Occupancy | | | 11/12/2019 | | DONE |
|
|
|
|
BLD-Final | 11/7/2019 | 11/8/2019 | 11/8/2019 | P | PASS |
Dave Hannah
|
|
|
Please contact JP before coming inspection. Phone #: ###-#### Inspection requested via web by Scott Hawker
|
Temporary Occupancy | 11/7/2019 | 2/5/2020 | 11/7/2019 | | DONE |
Gemma Flores
|
|
|
|
BLD-Final | 11/5/2019 | 11/6/2019 | 11/6/2019 | P | PART |
Mike Jordan
|
|
|
Please call JP in advance. ###-#### Phone #: ###-#### Inspection requested via web by Mattie Botero. Ok for temp. occ. Needs to installremainder of glazing, provide ADA compliant hardware on pocket door.
|
FIRE-Final Inspection | 11/5/2019 | 11/6/2019 | 11/6/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Please call JP in advance. ###-#### Phone #: ###-#### Inspection requested via web by Mattie Botero
|
FIRE-Final Inspection | 11/4/2019 | 11/5/2019 | 11/5/2019 | P | FAIL |
Troy Cobbley
|
|
|
Provide the small documents and provide the missing exit sign as discussed.
Phone #: ###-#### Inspection requested via web by Scott Hawker
|
BLD-Ceiling Grid Inspection | 10/22/2019 | 10/23/2019 | 10/23/2019 | A | PASS |
Mike Jordan
|
|
|
Please call for access to building. Lock box out at back door code is 4995 Phone #: ###-#### Inspection requested via web by Scott Hawker
|
BLD-Ceiling Grid Inspection | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | NR |
Mike Jordan
|
|
|
Please call JP in advance so he can make sure the building is open for you. ###-####. Thanks. Phone #: ###-#### Inspection requested via web by Mattie Botero. Nedds fire sprinkler rough in first.
|
Plan Reviewer's activity | | | 8/26/2019 | | DONE |
|
|
|
Changed the tenant name from "The Mint Dental Company" to "Boise Dental Arts".
|
BLD-Energy code compliance | 8/20/2019 | 8/21/2019 | 8/21/2019 | A | PASS |
Mike Jordan
|
|
|
Please call JP at ###-####. Prefer 10am-11am. Phone #: ###-#### Inspection requested via web by Mattie Botero
|
BLD-Framing/Rough-in | 8/19/2019 | 8/20/2019 | 8/20/2019 | P | PASS |
Mike Jordan
|
|
|
Please call JP at ###-####. Phone #: ###-#### Inspection requested via web by Mattie Botero
|
Plan assigned to (CJW) | 7/23/2019 | 7/23/2019 | 8/16/2019 | | PASS |
Carl Westfall
|
|
|
Plan modification - Mint Dental (waiting for mechanical)
|
Routing - MECHANICAL | 8/15/2019 | | 8/16/2019 | | PASS |
Troy James
|
|
|
|
Plan Reviewer's activity | | | 8/16/2019 | | PASS |
|
|
|
Plan mod approved
|
Permit Ready to Issue | | | 8/16/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/16/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/14/2019 | | 8/15/2019 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 8/13/2019 | | 8/14/2019 | | DONE |
Carl Westfall
|
|
|
Plan mod plan intake review approved
|
Plan resubmittals received | | | 8/13/2019 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 7/24/2019 | | FAIL |
|
|
|
Plan mod plan intake review failed
|
Plan Modification Accepted | | | 7/23/2019 | | DONE |
|
|
|
Additional HVAC roof top unit, supply and return duct work. Sheets: M1 and M2
|
Telephone call | | | 6/27/2019 | | DONE |
|
|
|
DeBest called-address was wrong? permit app shows Ste 150-no notes from addressing so changed the ones that showed Ste 145 to 150. there were several attached permits that showed 145 and some showed 150-all show 150 now
|
Print Occupancy Form | | | 6/7/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/7/2019 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 5/2/2019 | 5/2/2019 | 6/6/2019 | | PASS |
Carl Westfall
|
|
|
(1st done) 05/16/19 (L-3 - 15 days) (eplan - 22 sheets) The Mint Dental Company (routed to fire)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/6/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/6/2019 | | DONE |
|
|
|
MET (hawker@morgan-construction.com)
Need GC
Need rev cert of val
|
Routing - FIRE | 6/5/2019 | 6/5/2019 | 6/5/2019 | | PASS |
Mark Scharfen
|
|
|
06.05.2019-Completed fire review, uploaded rev_fire 06.05.2019.pdf. Passed.
|
Plan resubmittals requested | | | 6/5/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/5/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/5/2019 | | 6/5/2019 | | PASS |
Carl Westfall
|
|
|
|
Routing PW Environmental | 5/25/2019 | | 6/4/2019 | | PASS |
Rick Christenson
|
|
|
After discussions with Jay Rice, Advantage Architects, they will install an amalgam separator, and the doctor will fill out an Application for Coverage under the BMPs.
|
Routing - FIRE | 5/25/2019 | 5/25/2019 | 6/3/2019 | | FAIL |
Mark Scharfen
|
|
|
Completed fire review 06.03.2019. Uploaded rev_fire 06.03.2019.pdf and emailed archiatect.
|
Routing - PLAN CHECK | 5/23/2019 | | 5/29/2019 | | PASS |
Carl Westfall
|
|
|
Drawings routed on 5-25-19 before doing the 2nd IBC review which was done on 5-29-19.
|
Routing - MECHANICAL | 5/25/2019 | | 5/28/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Route to Impact Fee Review | 5/22/2019 | 5/25/2019 | 5/23/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Plan resubmittals received | | | 5/23/2019 | | DONE |
|
|
|
|
Routing - FIRE | 5/2/2019 | | 5/22/2019 | | FAIL |
Mark Scharfen
|
|
|
completed fire review. uploaded rev_fire 05.22.2019.pdf. emailed contractor.
|
1st review completed | | | 5/22/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 5/22/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 5/17/2019 | | DONE |
|
|
|
IBC plan review report Emailed. Fire needs to complete their review before workflow in ePlanReview can be sent to the applicant.
|
Routing - PLAN CHECK | 5/2/2019 | | 5/17/2019 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing PW Environmental | 5/2/2019 | | 5/16/2019 | | FAIL |
Rick Christenson
|
|
|
Need Amalgam separator installed. Contact Zach Conde @ ###-####
|
Routing - PLANNING | 5/2/2019 | | 5/6/2019 | | PASS |
David Moser
|
|
|
See CZC19-00067
|
Routing - MECHANICAL | 5/2/2019 | | 5/3/2019 | | FAIL |
Chad Schwendiman
|
|
|
|
Routing - PLUMBING | 5/2/2019 | | 5/2/2019 | | PASS |
Daryl Spivey
|
|
|
Provide tempered water to lavs ISPC 407.3 and per plan and NFPA 99.
|
Routing - Addressing | 5/2/2019 | | 5/2/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 5/2/2019 | | 5/2/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 5/2/2019 | | 5/2/2019 | | PASS |
Michael Zawacki
|
|
|
No ESC needed, no exterior work in scope of work.
|
Intake Approval | | | 4/29/2019 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 4/26/2019 | | PASS |
|
|
|
Plan intake review approved
|
Intake Approval | | | 4/24/2019 | | FAIL |
|
|
|
4-24-19 Refer to the circled items in the plan intake checklist. Resolve each item as directed. CJW
|
Application received | | | 4/23/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 23 2019 9:39AM
|