Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-01335
StatusIssued
Name BARBARA RARBER
Site Address 2300 W FAIRVIEW AVE Unit: 130
Project NameOffice Suite 130
Customer NumberBLD19-00915, 01334 - 01336
ePlanReviewYes
Description
(VANILLA TI ā€“ SUITE #130) THERE ARE (4) PERMITS UNDER THIS ePLAN CASE BLD19-00915. (4) Vanilla TI Suites are being developed in an existing 6,374 square foot building. (See BLD19-00915, 01334, 01336) Suite #130 TI, ā€œCā€ as per plans, is to be a 1,165 square foot Tenant Space. Approval is contingent upon adhering to the approved plans on file. Work to include: DEMOLISHING existing non-wall bearing interior walls, existing bathrooms, existing HVAC and electrical as needed, removing CMU Blocks installed to infill a previous opening in the exterior wall in 1988; ADDING a non-bearing interior wall, ADA compliant Bathroom, replacing an existing exterior wall between CMU wall opening with a new front door, glass and exterior wall, HVAC and electrical as per plans, interior finishes in compliance with Ch. 8 of the 2015 IBC. This building was previously occupied by Ennis Furnishings. This building is not sprinklered. ***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in5/27/20205/27/20205/27/2020PPASS
DetailsMike Jordan
Tara Phone #: ###-####. Interior wood framed walls for restrooms only ok.
BLD-Framing/Rough-in5/15/20205/18/20205/18/2020ANR
DetailsBrandon Shaw
Ele permits to be asigned to proper addresses...
BLD-Framing/Rough-in5/14/20205/15/20205/15/2020ANR
DetailsTell Riley
call for access 20 mins-Tara *screened* Phone #: ###-####//add backing for grab bars//need ELE permits fixed//need mechanical permits//seal penetrations at top plates//
Issue PAID IN FULL permit  8/1/2019 DONE
Inspection Record Card- Bld  8/1/2019 DONE
(F) Reprint permit  8/1/2019 DONE
Routing - PUBLIC WORKS7/18/2019 7/31/2019 PASS
DetailsMorgan Webb
Routing - PUBLIC WORKS6/14/2019 7/31/2019 PASS
DetailsMorgan Webb
Plan assigned to (BJM)5/3/20195/3/20197/30/2019 DONE
DetailsBrian McGowan
6th Review Complete-05/24 - 4 Office Suite #130 L-3
Routing - Design Review6/13/2019 7/30/2019 PASS
DetailsKayCee Babb
Per DRH19-00186 modification, to comply with all conditions of approval including any RTU shall be fully screened by either the existing parapet or additional screening as approved through Design Review.
Routing - PLAN CHECK7/23/2019 7/30/2019 PASS
DetailsBrian McGowan
Routing - PUBLIC WORKS7/23/2019 7/30/2019 PASS
DetailsMorgan Webb
PLANS/APPL TAKEN TO FRONT DESK  7/30/2019 DONE
DetailsBrian McGowan
Permit Ready to Issue  7/30/2019 DONE
BLD19-00915, 01334 - 01336
NEED
GC FORM
REVISED VALUE
Routing - FIRE7/17/20197/17/20197/23/2019 PASS
DetailsMark Scharfen
Completed fire review. Uploaded rev_fire 07.23.2019.pdf
Routing - PLAN CHECK7/18/2019 7/19/2019 FAIL
DetailsBrian McGowan
Routing - PLAN CHECK7/10/2019 7/10/2019 FAIL
DetailsBrian McGowan
Routing - PLAN CHECK6/13/2019 7/1/2019 FAIL
DetailsBrian McGowan
Route to Impact Fee Review5/29/20196/1/20195/30/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Routing - PLANNING5/3/2019 5/30/2019 PASS
DetailsNicolette Womack
Routing - FIRE5/3/20195/3/20195/29/2019 PASS
DetailsMark Scharfen
05.29.2019-completed fire review. Uploaded rev_fire 05.29.2019.pdf.
1st review completed  5/29/2019 DONE
DetailsBrian McGowan
Routing - PLAN CHECK5/3/2019 5/29/2019 FAIL
DetailsBrian McGowan
Modifying floor plan
Routing - PLUMBING5/3/2019 5/9/2019 PASS
DetailsDan Ediger
Per plans and ISPC
Routing - MECHANICAL5/3/2019 5/7/2019 PASS
DetailsTroy James
Need to address mechanical ventilation at occupancy.
Routing - Addressing5/3/2019 5/6/2019 PASS
DetailsDoug Chausow
Suite 130
Routing - PUBLIC WORKS5/3/2019 5/6/2019 PASS
DetailsAngela Hardy
Routing - Design Review5/3/2019 5/6/2019 FAIL
DetailsKayCee Babb
Per DRH18-00376. Plans do not match approved elevations and a Class II tree is required in the northern terminal planter.
Intake Approval  5/1/2019 PASS
Application received  4/23/2019 DONE
Application submitted via PDS Online on Apr 23 2019 12:18PM