BLD-Final | 5/9/2019 | 5/10/2019 | 5/10/2019 | P | PASS |
Jim Sly
|
|
|
Krystal Phone #: ###-####
|
DOC - Permit Finaled | 5/10/2019 | 5/10/2019 | 5/10/2019 | P | PASS |
Jim Sly
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/9/2019 | | DONE |
|
|
|
Left message for Jim to give me a call if this permit should not be reopened. doc final 5-8-19 but there was no final inspection
|
BLD-Framing/Rough-in | 5/7/2019 | 5/8/2019 | 5/8/2019 | P | PASS |
Jim Storey
|
|
|
If possible, inform the above number when you are headed to the jobsite. Thank you! Phone #: ###-#### Inspection requested via web by BRS Permitting
|
DOC - Permit Finaled | 5/8/2019 | 5/8/2019 | 5/8/2019 | P | PASS |
Jim Storey
|
|
|
No work needed to the existing roof structure per engineer’s roof evaluation.
|
Place hold on job | 4/29/2019 | | 4/29/2019 | | DONE |
Judith Amador
|
|
|
MET-Need- signed permit
|
Permit Ready to Issue | | | 4/26/2019 | | DONE |
|
|
|
met
|
Issue PAID IN FULL permit | | | 4/26/2019 | | DONE |
|
|
|
emailed permit to -permitting.department@blueravensolar.com
|
Inspection Record Card- Bld | | | 4/26/2019 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 4/23/2019 | 4/23/2019 | 4/25/2019 | | PASS |
Josh Bogle
|
|
|
4/29 PV, ePlan
|
Routing - PLAN CHECK | 4/23/2019 | | 4/25/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 4/25/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/25/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Application received | | | 4/23/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 23 2019 2:07PM
|
Plans ACCEPTED BY PLAN TECH | | | 4/23/2019 | | DONE |
|
|
|
|
Intake Approval | | | 4/23/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/23/2019 | | DONE |
|
|
|
|
Routing - PLANNING | 4/23/2019 | | 4/23/2019 | | PASS |
Sue Cummings
|
|
|
Eplan will not allow me to pass this permit in that system.
|