BLD-Final | 12/20/2019 | 12/20/2019 | 12/20/2019 | P | PASS |
Mike Jordan
|
|
|
Kenny Phone #: ###-####
|
DOC - Permit Finaled | 12/20/2019 | 12/20/2019 | 12/20/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 12/20/2019 | 12/20/2019 | 12/20/2019 | P | DONE |
Mike Jordan
|
|
|
5.7
|
BLD-Energy code compliance | 10/2/2019 | 10/3/2019 | 10/3/2019 | A | PASS |
Mike Jordan
|
|
|
Kenny Phone #: ###-####. All issues have been resolved.
|
BLD-Energy code compliance | 10/1/2019 | 10/1/2019 | 10/1/2019 | P | CANC |
Mike Jordan
|
|
|
Cancelled by contractor via text message.
|
BLD-Energy code compliance | 9/30/2019 | 10/1/2019 | 10/1/2019 | A | CANC |
Mike Jordan
|
|
|
KENNY Phone #: ###-####. Moved to pm inspection.
|
BLD-Framing/Rough-in | 9/27/2019 | 9/30/2019 | 9/30/2019 | A | PART |
Mike Jordan
|
|
|
Kenny Phone #: ###-####. Provide approved fix for cut top chords of floor joist at plumbing penetrations. Complete fire cauliking. complete laydown parapet in noted areas. Install mised lateral bracing.
|
BLD-Wall Bracing | 9/6/2019 | 9/6/2019 | 9/6/2019 | P | PASS |
Mike Jordan
|
|
|
KENNY Phone #: ###-####
|
BLD-Other | 8/23/2019 | 8/23/2019 | 8/23/2019 | P | PASS |
Mike Jordan
|
|
|
Kenny- insalation for fire wall Phone #: ###-####
|
BLD-Energy code compliance | 8/9/2019 | 8/9/2019 | 8/9/2019 | P | PASS |
Mike Jordan
|
|
|
LARRY Phone #: ###-####. Insulation for 1hr. walls first floor.
|
Plan Reviewer's activity | | | 8/9/2019 | | DONE |
Jenny Nelson
|
|
|
Appllicant called and wanted to cancel plan mod request, said they built to approved plans and did not make changes. Are going to make changes on other townhouses in subdivision, will submit plan mod for those.
|
Telephone call | | | 8/9/2019 | | DONE |
|
|
|
Larry with Sterling Home cancel the plan mod for ALL 7 townhomes per Jenny this is okay to cancel.
|
CHANGE STATUS TO (ISS) | | | 8/9/2019 | | DONE |
|
|
|
plan mod cancel by Larry from Sterling Homes okay to do per Jenny.
|
Plan Modification Accepted | | | 8/1/2019 | | DONE |
|
|
|
At request of applicant, plan mod workflow started for changes to interior wall gypsum and fire-rated wall assembly.
|
BLD-Concrete | 7/24/2019 | 7/26/2019 | 7/26/2019 | P | PART |
Tell Riley
|
|
|
rebar-Shane Phone #: ###-####//rebar inspected on AM inspection//maintain clearances//
|
BLD-Foundation | 7/25/2019 | 7/26/2019 | 7/26/2019 | A | PART |
Tell Riley
|
|
|
Kenny Phone #: ###-####//extend vapor barrier to edge of foundation//maintain rebar clearance//
|
BLD-Footing | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | CANC |
Mike Jordan
|
|
|
Kenny- Phone #: ###-####
|
BLD-Energy code compliance | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | PASS |
Mike Jordan
|
|
|
Kenny- Phone #: ###-####. Rigid insulation on stemwall under slab on grade.
|
BLD-Foundation | 6/19/2019 | 6/20/2019 | 6/20/2019 | P | PART |
Mike Jordan
|
|
|
Dane- inspection wall Phone #: ###-####
|
BLD-Footing | 6/18/2019 | 6/19/2019 | 6/19/2019 | P | PART |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/29/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/29/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 5/24/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 5/15/2019 | 5/15/2019 | 5/24/2019 | | DONE |
Jenny Nelson
|
|
|
06/03 townhouses L2 ePlan
|
Routing - PLAN CHECK | 5/15/2019 | | 5/24/2019 | | PASS |
Jenny Nelson
|
|
|
|
1st review completed | | | 5/24/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/24/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 5/24/2019 | | DONE |
|
|
|
met
DO NOT ISSUE WITHOUT BLD19-01355, BLD19-01358 TO BLD19-01363
|
Route to Impact Fee Review | 5/15/2019 | 5/18/2019 | 5/16/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PUBLIC WORKS | 5/15/2019 | | 5/16/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - MECHANICAL | 5/15/2019 | | 5/16/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLANNING | 5/15/2019 | | 5/16/2019 | | PASS |
Andrea Tuning
|
|
|
|
Routing - Addressing | 5/15/2019 | | 5/15/2019 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/15/2019 | | DONE |
|
|
|
|
Intake Approval | | | 5/15/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/15/2019 | | DONE |
|
|
|
|
Intake Approval | | | 5/7/2019 | | FAIL |
|
|
|
Adam uploaded the res check so we still need manual J's
|
Intake Approval | | | 5/7/2019 | | FAIL |
|
|
|
5-7-19 Adam, Spoke with Chad (mechanical supervisor) and he stated that the typical manual J (ACCA Report) has to be submitted. Cannot accept HAVC Load Calcs. If you have any questions please contact him at ###-####
|
Meeting | | | 4/29/2019 | | DONE |
|
|
|
Spoke with Larry with Sterling Homes, he informed me that Cosatal Construction and Lumber is the parent company and is the RCE number they will be using.
|
Intake Approval | | | 4/25/2019 | | FAIL |
|
|
|
A manual J is required for each unit.
Please email a GC form with an RCE number that corresponds with the company of record to: permits@cityofboise.org. Please reference the building permit in the subject line.
|
Application received | | | 4/23/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 23 2019 4:33PM
|