Permit Information
Permit NumberBLD19-01364
StatusFinaled
Name CBH HOMES
Site Address 7041 W COHO DR
Project NameLOT 04 BLK 06 FORK SOUTH SUB N
Customer Number 
ePlanReviewYes
Description
**PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2054 sq. ft., one story single family dwelling with 3 bedrooms, 2 bathrooms, approximately 40 sq. ft. of covered patio/porch and a 669 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/4/20199/4/20199/4/2019APASS
DetailsMike Jordan
garage door code is 2468,

the temp logo is in the bottom corner of window in the master bath. it is hard to see but it is there. on the slider the temp logo is in the top corner. i marked both locations with blue tape. Phone #: ###-#### Inspection requested via web by Joel Hirtle
DOC - Permit Finaled9/4/20199/4/20199/4/2019PPASS
DetailsMike Jordan
DOC - Permit Finaled9/4/20199/4/20199/4/2019PPASS
DetailsMike Jordan
BLD-Blower Door Test Results9/4/20199/4/20199/4/2019PPASS
DetailsMike Jordan
4.0
BLD-Final8/30/20199/3/20199/3/2019PFAIL
DetailsMike Jordan
Garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle. All issues resolved except for tempere glazing in slider in master bath.
BLD-Final8/27/20198/27/20198/27/2019PFAIL
DetailsTell Riley
garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle//need electrical final//
BLD-Final8/26/20198/27/20198/27/2019ACANC
DetailsMike Jordan
Garage door code is 2468 Phone #: ###-#### >> Inspection requested via web by Joel Hirtle Inspection cancelled from web by: Joel Hirtle
BLD-Final8/22/20198/22/20198/22/2019PFAIL
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Joel Hirtle correction notice is on elec panel
BLD-Energy code compliance7/5/20197/5/20197/5/2019PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in7/5/20197/5/20197/5/2019PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in7/3/20197/3/20197/3/2019PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Will inspect framing corrections on energy code inspection. Noted that electrical rough in inspection has know passed. Ok to insulate.
BLD-Framing/Rough-in6/27/20197/2/20197/2/2019PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Complete lateral bracing on B6, B7 and B8 trusses. Provide additional studs for bearing on A4G and C4G trusses. An electrical rough in inspection has not been completed. DO NOT COVER OR INSULATE. Correction notice posted.
BLD-Wall Bracing6/20/20196/20/20196/20/2019PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Foundation6/5/20196/5/20196/5/2019PPASS
DetailsMike Jordan
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing6/4/20196/4/20196/4/2019PPASS
DetailsMike Jordan
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
Issue PAID IN FULL permit  5/6/2019 DONE
emailed Melissa at CBH Homes to sign the building permit and erosion permit and send them back
Inspection Record Card- Bld  5/6/2019 DONE
OVERRIDE  4/26/2019  
Plan assigned to (J_N)4/24/20194/24/20194/26/2019 DONE
Details
Routing - PLAN CHECK4/24/2019 4/26/2019 PASS
Details
1st review completed  4/26/2019 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  4/26/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  4/26/2019 DONE
Route to Impact Fee Review4/24/20194/27/20194/25/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Application received  4/24/2019 DONE
Application submitted via PDS Online on Apr 24 2019 8:22AM
Plans ACCEPTED BY PLAN TECH  4/24/2019 DONE
Recd Pcfee & Taken To Pln CK  4/24/2019 DONE
Intake Approval  4/24/2019 PASS
Routing - MECHANICAL4/24/2019 4/24/2019 PASS
DetailsTroy James
Routing - PLANNING4/24/2019 4/24/2019 PASS
DetailsSue Cummings
Routing - Addressing4/24/2019 4/24/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS4/24/2019 4/24/2019 PASS
DetailsAngela Hardy